Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-Finance CHANDAUTI | CHANDAULI | UTTAR PRADESH | L1 | Accepted-Finance Accepted | |
| 2 | L2₹20.6 L+₹85,939.40 (4.35%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹24.3 L+₹4.6 L (23.3%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
7 Nov 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
33/11KV S/S RDC Ghaziabad
Inc. Cap. Pilkhuwa 2, Kheda 1 and Piplabandpur Hapur
2023_PVVNL_847585_1
48/ECWD/Gzb/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Hapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
EE, EUCD (D), PVVNL, Gzb
₹20,000
25 Nov 2023
7 Oct 2023
7 Nov 2023
7 Oct 2023
7 Nov 2023
7 Oct 2023
(i) increasing capacity of 33/11KV S/S Pilkhuwa-2, Hapur from (2x5)MVA to (5+10)MVA Supply of following Material Supply for neutral link L type Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
Supply for cable support Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) G.I.Pipe 110mm Dia 2mm thickness 2Mtr long with G.I.Clamp (size 50x6mm)
Supply for copper bus bar support T-type Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) Al. Binding wire
Supply of copper bus bar of size (2500x50x6)mm
Supply of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
Supply of 33 KV Post insulator as per PVVNL specification by approved vendor.
Supply for Water level earthing (01 Nos) i) G.I. pipe size 40 mm inner dia & thickness 2mm
ii) Solid copper cone Approx 225 mm long and 750 gm in weight
iii) Copper wire 6 SWG
iv) Copper flexible earthing strip of size 50x6mm for neutral
Supply of ready mixed primer & ISI mark Aluminium Paint & ISI mark synthetic enaimel green paint for painting of installed all M.S.Structure / G.I.Strip (old & New).
Miscellaneous works of Increasing Capacity of 33/11KV S/S, Pilkhuwa-2, Hapur (2x5)MVA to (5+10)MVA Hiring of D/G Set including carriage, loading, unloading & operating charges (With fuel) at 33/11KV Substation under construction in case L.T. Supply is not available near S/s within prescribed accessible limit. 63KVA, Three phase, D/G Set for fabrication of different structure at Substation.
Removal of existing 5MVA Transformer and other accessories equipments. Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 05MVA Power transformer.
Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S Pilkhuwa-2, Hapur into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor
Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
Re-filling the transformer oil (old & used in existing 5MVA T/F)
Installation for 33/11KV 10MVA T/F Safe Shifting of 10MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
Erection & Installation of 10MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at minimum 50 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100x50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms and 0.75Mtr bracing. Structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer with stone Pad of size (300x300x75mm).
Fabrication and erection of cable support made of two pieces of G.I.Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 01 Nos. G.I.Channel (100x50x6)mm & 03 Nos. G.I.Angle (50x50x6) mm pieces of size 1.0Mtr long each by welding at equal intervals and grouting in a block of size (300x1500x1000)mm in C.C. 1:3:6. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
Fabrication and grouting of G.I. frames 3.60 mt. long & 1.8Mtr wide on top for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The G.I. frame shall be made of G.I. channel (100x50)mm in 'T' shape. Providing 2 Nos. support of G.I. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator/Post insulator. and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x1000) mm with stone Pad of size (300x300x75mm). The work also includes the fixing of 3 Nos. Post insulator with G.I. nut bolt & washers and binding the copper Bus Bar with the Post insulator by Aluminium binding wire in complete.
Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10 MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
Installation of 33 KV Post Insulators: Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
Painting of Structures Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. All installed (old & new) M.S. structures in switchyard.
Painting of G.I.Earth Strip (old & new) of size (50x6) mm with two coats of ISI mark synthetic enaimel green paint.
Erection of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
Safe carriage of old received back material from site to store including loading & unloading at both end.
(ii) increasing capacity of 33/11KV S/S Kheda-1, Hapur from (2x5)MVA to (5+10)MVA Supply of following Items :- Supply for neutral link L type Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
Supply for cable support Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) G.I.Pipe 110mm Dia 2mm thickness 2Mtr long with G.I.Clamp (size 50x6mm)
Supply for copper bus bar support T-type Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) Al. Binding wire
Supply of copper bus bar of size (2500x50x6)mm
Supply of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
Supply of 33 KV Post insulator as per PVVNL specification by approved vendor.
Supply of 33KV Line isolator as per PVVNL specification by approved vendor.
Supply of 33KV Bus isolator as per PVVNL specification by approved vendor.
Supply for Water level earthing (01 Nos) i) G.I. pipe size 40 mm inner dia & thickness 2mm
ii) Solid copper cone Approx 225 mm long and 750 gm in weight
iii) Copper wire 6 SWG
iv) Copper flexible earthing strip of size 50x6mm for neutral
Supply of ready mixed primer & ISI mark Aluminium Paint & ISI mark synthetic enaimel green paint for painting of installed all M.S.Structure / G.I.Strip (old & New).
Miscellaneous works of Increasing Capacity of 33/11KV S/S, Pilkhuwa-2, Hapur (2x5)MVA to (5+10)MVA Hiring of D/G Set including carriage, loading, unloading & operating charges (With fuel) at 33/11KV Substation under construction in case L.T. Supply is not available near S/s within prescribed accessible limit. 63KVA, Three phase, D/G Set for fabrication of different structure at Substation.
Removal of existing 5MVA Transformer and other accessories equipments. Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 05MVA Power transformer.
Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S Pilkhuwa-2, Hapur into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor
Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
Re-filling the transformer oil (old & used in existing 5MVA T/F)
Installation for 33/11KV 10MVA T/F Safe Shifting of 10MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
Erection & Installation of 10MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at minimum 50 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100x50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms and 0.75Mtr bracing. Structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer with stone Pad of size (300x300x75mm).
Fabrication and erection of cable support made of two pieces of G.I.Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 01 Nos. G.I.Channel (100x50x6)mm & 03 Nos. G.I.Angle (50x50x6) mm pieces of size 1.0Mtr long each by welding at equal intervals and grouting in a block of size (300x1500x1000)mm in C.C. 1:3:6. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
Fabrication and grouting of G.I. frames 3.60 mt. long & 1.8Mtr wide on top for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The G.I. frame shall be made of G.I. channel (100x50)mm in 'T' shape. Providing 2 Nos. support of G.I. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator/Post insulator. and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x1000) mm with stone Pad of size (300x300x75mm). The work also includes the fixing of 3 Nos. Post insulator with G.I. nut bolt & washers and binding the copper Bus Bar with the Post insulator by Aluminium binding wire in complete.
Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10 MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
Installation of 33 KV Isolators: Assembling and installation of line/Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
Installation of 33 KV Post Insulators: Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
Painting of Structures Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. All installed (old & new) M.S. structures in switchyard.
Painting of G.I.Earth Strip (old & new) of size (50x6) mm with two coats of ISI mark synthetic enaimel green paint.
Erection of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
Safe carriage of old received back material from site to store including loading & unloading at both end.
(iii) increasing capacity of 33/11KV S/S Piplabandh Pur, Hapur from (2x5)MVA to (5+10)MVA Supply of following Items :- Supply for neutral link L type Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
Supply for cable support Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) G.I.Pipe 110mm Dia 2mm thickness 2Mtr long with G.I.Clamp (size 50x6mm)
Supply for copper bus bar support T-type Galvanised Structure i) Galvanised Channel (100x50x6)mm
ii) Galvanised Angle (50x50x6)mm
iii) Al. Binding wire
Supply of copper bus bar of size (2500x50x6)mm
Supply of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
Supply of 33 KV Post insulator as per PVVNL specification by approved vendor.
Supply for Water level earthing (01 Nos) i) G.I. pipe size 40 mm inner dia & thickness 2mm
ii) Solid copper cone Approx 225 mm long and 750 gm in weight
iii) Copper wire 6 SWG
iv) Copper flexible earthing strip of size 50x6mm for neutral
Supply of ready mixed primer & ISI mark Aluminium Paint & ISI mark synthetic enaimel green paint for painting of installed all M.S.Structure / G.I.Strip (old & New).
Miscellaneous works of Increasing Capacity of 33/11KV S/S, Pilkhuwa-2, Hapur (2x5)MVA to (5+10)MVA Hiring of D/G Set including carriage, loading, unloading & operating charges (With fuel) at 33/11KV Substation under construction in case L.T. Supply is not available near S/s within prescribed accessible limit. 63KVA, Three phase, D/G Set for fabrication of different structure at Substation.
Removal of existing 5MVA Transformer and other accessories equipments. Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 05MVA Power transformer.
Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S Pilkhuwa-2, Hapur into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor
Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
Re-filling the transformer oil (old & used in existing 5MVA T/F)
Installation for 33/11KV 10MVA T/F Safe Shifting of 10MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
Erection & Installation of 10MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at minimum 50 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100x50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms and 0.75Mtr bracing. Structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer with stone Pad of size (300x300x75mm).
Fabrication and erection of cable support made of two pieces of G.I.Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 01 Nos. G.I.Channel (100x50x6)mm & 03 Nos. G.I.Angle (50x50x6) mm pieces of size 1.0Mtr long each by welding at equal intervals and grouting in a block of size (300x1500x1000)mm in C.C. 1:3:6. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
Fabrication and grouting of G.I. frames 3.60 mt. long & 1.8Mtr wide on top for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The G.I. frame shall be made of G.I. channel (100x50)mm in 'T' shape. Providing 2 Nos. support of G.I. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator/Post insulator. and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x1000) mm with stone Pad of size (300x300x75mm). The work also includes the fixing of 3 Nos. Post insulator with G.I. nut bolt & washers and binding the copper Bus Bar with the Post insulator by Aluminium binding wire in complete.
Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10 MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
Installation of 33 KV Post Insulators: Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
Painting of Structures Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. All installed (old & new) M.S. structures in switchyard.
Painting of G.I.Earth Strip (old & new) of size (50x6) mm with two coats of ISI mark synthetic enaimel green paint.
Erection of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment
Safe carriage of old received back material from site to store including loading & unloading at both end.
Raj Engineers
M/S RAGHAV and BROTHERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .