Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-Finance 119 MONOHAR PUKUR ROAD KOLKATA 700 026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | ₹30.8 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L1₹30.8 LRejected-Finance BONHOOGHLY BORAL MAIN ROAD SONARPUR KOLKATA 700103 | KOLKATA | SOUTH 24 PARGANAS | WEST BENGAL | 700103 | ₹30.8 L | L1 | Rejected-Finance REJECTED |
| 3 | L2₹30.8 LRejected-Finance 8D 1 RAJANI BHATTACHARJEE LANE KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹30.8 L | L2 | Rejected-Finance REJECTED |
| 4 | L3₹30.8 LRejected-Finance 46 A BARO BAGAN LANE SERAMPORE DIST HOOGHLY PIN 712203 | SERAMPORE | HOOGHLY | WEST BENGAL | 712203 | ₹30.8 L | L3 | Rejected-Finance REJECTED |
| 5 | L4₹32.3 LRejected-Finance | ₹32.3 L | L4 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | CHANDAN ENTERPRISE L2 | N K BUILDERS L1 | UNITED CONSTRUCTION SERVICE L1 | SOUMEN CONSTRUCTION CO L3 | P MAZUMDER AND COMPANY L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Supply of Pump Operator (semi-skilled) for day to day operation of pump motor set & controlling valves in water supply line as well as in headers as and when required to provide uninterrupted water supply at different buildings including minor maintenance of pump, motor, starters etc. as and when required. (Rate inclusive of Bonus, PF, ESI, tools & plants). 1) Alipore Sub Division I = 1 No. Operator X 2 Shifts X 365 Days. = 730 Nos. a) PWD office campus at 3, Commissariate Road, Hastings, Kolkata - 22 b) Central Record Room of Calcutta High Court at Nimak Mahal Road, Kolkata 700 043 c) South 24 pargana PWD Electrical Division office and South Sub Urban Electrical Sub Division office, PWD at 57/2 Diamond Harbour Road. d) Alipore Police Morgue (Katapukur) 2) Alipore Sub Division II = 1 No. Operator X 2 Shifts X 365 Days. = 730 Nos. a) Hasting house compound b) Judges court compound 3) Alipore Sub Division III = 1 No. Operator X 2 Shifts X 365 Days. = 730 Nos. a) Body Guard Line compound 4) Behala Sub Division = 1 No. Operator X 2 Shifts X 365 Days. = 730 Nos. a) Institute of Fire Service b) Archaeological Museum c) PWD office building at 3no., S.N. Roy Road 5) Chetla Sub Division :- a) Collectorate Compound, DM & ADM office cum Bungalow, Survey Building, Office of the Executive Engineer Alipore Division PWD, Bhabani Bhaban Main Building, Directorate Securities and Multistoried Office Building = 1 No. Operator X 2 Shifts X 365 Days. = 730 Nos. b) Alipore Central Correctional Home, Presidency Correctional Home, Alipore Women’s Correctional Home, Ladies Barrack, Police Line, Police Barrack, Police Housing Estate, South West Traffic Guard, Menials Quarter Building, Alipore Police Station & Quarter Building = 1 No. Operator X 3 Shifts X 365 Days. = 1095 Nos. TOTAL = 4745 Nos. The Estimated rate has already been given (in Cell F14 of sheet 1 of BOQ) which is calculated considering prevailing minimum wages vide memo no. 20/Stat /14/RW/24/2023/LCS/JLC Dated. 17/06/2025 of Labour Commissioner, Govt. of West Bengal & also considering contribution to E.P.F.,E.S.I. & Bonus to be made by the Agency vide memo no. 3790-F(Y) Dated 21.07.2014 of Joint Secretary, Finance (Audit) Department, Govt. of West Bengal icluding 18% GST and 1% L.W.Cess. Intending bidders are only required to quote the Service Charges in Percentage (%) rate (Higher) in Cell M14 of Sheet 1 of BOQ. | ||||||||
| 1.01 | Profit / Service Charges
Total Pump Operator (semi-skilled) for all day round the clock including Service charges.
(Inclusive all taxes & duties) | 4,745 | per shift per day | 0 ₹30.8 L | 0 ₹30.8 L | 0 ₹30.8 L | 0 ₹30.8 L | 0.05 ₹32.3 L |
Tender Value
Refer Docs
EMD Value
₹62,000
Closing Date
29 Oct 2025, 3:00 pmClosed
Executive Engineer -I Alipore Division PWD
Executive Engineer_I Alipore Division PWD 2ND and 3RD floor 32_BELVEDERE ROAD Alipore Kolkata_700027
Day to day Operation of pump motor Set including Controlling of valves to ensure the day after day water supply at different building under Alipore Division PWD during the year 2025 26
2025_WBPWD_913166_1
WBPWDEEIALI/IRT-12/25-26
Open Tender
Miscellaneous Works
365 days
ALIPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹62,000
Yes
15 May 2026
25 Sept 2025
31 Oct 2025
26 Sept 2025
29 Oct 2025
26 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_2091793.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid