Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-Finance | L1 | Accepted-Finance lowest bidder | |
| 2 | L2₹8.4 L+₹37,738.76 (4.73%)Accepted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | L2 | Accepted-Finance Highest bidder |
Tender Value
₹8.4 L
EMD Value
₹8,500
Closing Date
23 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer PWD Building C and M Division Erode
Special repairs to Leaky roof, flooring, walls and painting arrangements for Three Class Room Building at Government High School at Pothapalayam in Erode District
2026_PWD_723770_1
NIT.14 2026 27 BCM DIVISION ERODE Dated.06.11.2026
Open Tender
Maintenance Works
Percentage
60 days
Pothapalayam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8,500
27 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and carefully stacking the materials useful for reuse of Weathering course and Pressed tiles, etc., complete as per standard specification and as directed by the deparmental officers. | 44.45 | M2 | 49.2 | ₹2,186.94 |
| 2 | Dismantling clearing away and carefully stacking materials of Plain Cement Concrete etc., complete as per standard specification and as directed by the deparmental officers. | 17 | M2 | 520.23 | ₹8,843.91 |
| 3 | Clean removal of cement plaster from walls etc.,complete complying with standard specification and as directed by the departmental officers. | 88 | M2 | 9.06 | ₹797.28 |
| 4 | Clean removal of cement plaster from walls and racking out joints 20mm deep for ceiling etc., complete complying with standard specification and as directed by the departmental officers. | 80 | M2 | 12.01 | ₹960.8 |
| 5 | Pointing with Cement Mortar 1:3 to Full Depth of Tiles (Marble Slabs, Pressed Tiles, Ornamental Tiles) , etc., complete complying as per the standard specifications | 171 | M2 | 370.55 | ₹63,364.05 |
| 6 | Cement Concrete 1:5:10 (One Cement, Five Crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification-Mixing by manual means | 17 | M3 | 5,422.7 | ₹92,185.9 |
| 7 | Paving the floor with best quality vitrified Tiles of following size and variety conforming IS 15622 with water absorbtion less than 0.08% of approved colour and shade laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors and the top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Double charged Vitrified Tiles 600 x 600 x 8mm | 46.5 | M2 | 1,572.05 | ₹73,100.33 |
| 8 | Paving the floor with best approved quality fine polished Kotta stone 600 x 600 of 20mm with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., complete complying with standard speicification and as directed by the departmental officers.(The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work) | 130 | M2 | 1,519.85 | ₹1,97,580.5 |
| 9Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | |||||
| 9.01 | a) Super Structure in Ground floor | 4 | M3 | 4,222.35 | ₹16,889.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_868905.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tencon_PothapalayamGHS.pdf
Tender Documents • 2.16 MB
BOQ_868905.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .