Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC 5 1B TARA ROAD KOLKATA 700026 INDIA | KOLKATA | WEST BENGAL | 700026 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹31.3 L+₹1.9 L (6.39%)Rejected-Finance 10 10 K S ROY ROAD 10 KIRAN SHANKAR ROY ROAD DALHOUSIE KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance Bidder quoted high rate | |
| 3 | L3₹36.4 L+₹7.0 L (23.9%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L3 | Rejected-Finance Bidder quoted high rate | |
| 4 | L4₹37.7 L+₹8.3 L (28.2%)Rejected-Finance III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | L4 | Rejected-Finance Bidder quoted high rate |
| Sl No | Description | Qty | Unit | Amba Tirupati Zetetic Engg Pvt Ltd L1 | United Elevators Pvt Ltd L2 | M/s Dhapola Elevator and Engineering L3 | MB Enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Comprehesive maintenance of lifts for day to day routine/periodical maintenance including supply of all consumable lubricants and repair or replacement of all components (spare parts) which may occur due to wear and tear except major parts as specified in notes here in after and paid separetly under relevant items and all as specified in para 16 of section 5 of part 8 of NBC 2016 for electrically operated automatic passenger/goods/ stretcher lift (OEM of lift :- EVS Elevators Pvt Ltd), Speed 0.5 m/s, (2500 Kg) G+3) in 17 Mtn DOU MSS building at Burdang for daily /routine/periodical maintenance as per direction of OEM or their accredited, authorised agencies including daily maintenance necessary of records & documents all as specified here in after. | 11 | Each Calender month | 17,500 ₹1,92,500 | 16,000 ₹1,76,000 Lowest | 20,500 ₹2,25,500 | 19,500 ₹2,14,500 |
| 1.01Notes :- (i) Day to day routine/periodical maintenance with replacement of defective equipments/ parts except as specified in here-in-after shall deem to be included in above quoted rate. (ii) Regular Maintenance:- Regular cleaning, lubrication, adjustment and adequate servicing by authorized competent persons at such intervals as the type of equipments and frequency of service demand. (iii) Fortnightly Maintenance:- Each lift is required to be visited by designated maintenance team from OEMs or their accredited/ authorised agencies and carry out specified maintenance activities to ensure upkeep of lift in user's work condition and details of checking by rep of contractor and signature by Engr-in-charge for fortnightly maintenance schedule as mentioned in PS. (iv) Monthly Maintenance:-Each lift is required to be visited by designated maintenance team from OEMs/ their accredited/ authorised agencies and carry out specified maintenance activities to ensure upkeep of lift in user's work condition. A proper visit required to be maintenance duly signed by supervisory staff of OEM/Contractor and Engr-in-charge with their remarks in monthly maintenance record in respective lift and maintenance schedule as mentioned in PS.. (v) Quarterly maintenance:- Each lift is required to be provided maintenance every quarter by OEMs/ their accredited/ authorised agencies and signature by Rep of OEM /Contractor & Engr-in-charge for quarterly maintenance schedule as mentioned in PS. (vi) Annual maintenance Schedule:- Certain specified maintenance is required to be performed on each lift to ensure longevity and useful life working of lift details of maintenance required to be done and person responsible is provided in PS. | |||||||
| 1.02Cont...... (vii) The contractor shall provide of skilled/high skilled / mechanic /special engineer/ OEM consaltancy charge required for any fault during currency of contract period and cost of same shall be deem to be included above quoted rate. (viii) The OEM or their accredited/ authorised agencies shall give one time training to all lift operators during currency of contract. (ix) The OEM or their accredited/ authorised agencies shall conduct one safety audit during the currency of the contract for each lift and submit reports to the Engr-in-Charge. (x) That for any break of terms and condition of the MOU by the contractor the OEM shall inform to the AGE. (xi) The material cost of control panel, VVV Driver, ARD, batteries, etc (as mentioned in item nos here-in-after) shall not included in above quoted rate. All others repairs/repalcement required to maintain serviceability and safety of lift shall be deemed to be included in above quoted rate. (xii) Force majure :- Any breakdown in lift caused due to natural calamities, i.e flood, earthquake, fire in building other than fire in lifts etc. shall be outside scope of routine/periodical maintenance. (xiii) The decision of Accepting Officer on exclusion/inclusion in scope of routine/periodical maintenance shall be final and binding. (xiv) List of building along with nos of passenger, name of OEM and nos of floor as mentioned in PS here-in-after, the bidder/tenderer is advised to visit all existing lift at site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly. | |||||||
| 1.03(xv) Make and model of part to be replaced shall be same as existing at site or as per OEM recommendation. (xvi) The contractor shall contact with the OEM for Maintenance / shall have 10 yeras work experience serving at variour state / central / public sectors repairs (xvii) The unit rate quoted shall deemed to include the cost of the consumbles and minor parts which are require for smooth maint of lift. (xviii) Defective battries found in maint shall be repalced by the contractor without of any extra cost labour / manpower to the department. (xix) The cost includes attending complaints of lifts and to carry out minor repairing within 24 hrs and major repair will be completed in 06 days failing which a penalty of Rs 100 per hour for minor repair and Rs 1000 per day for major repair will be levied to the contractor. The spares used for the repair will b paid in supply only item and will be measured and paid separately. (xx) Comprehensive maint shall deemed to include to carry out repairs / replacement of worn out / defective all minor parts like as fuses,controller diode, buzer, resistance and necessary spares required to maintain the operation of the lift etc and other spare parts shall be measured and paid under relevant items of sch. | |||||||
| 1.04(xxi) Servicing / overhauling the lift at regular / specified intervals including checking of all electrical connections. (xxii) Servicing the motor and gears, bearings with approved make lubricants. (xxiii) Major spare / worn out spares required shall be measured & paid under relevant items. (xxiv) Rate quoted inclusion the cost of attending the complaints/breakdown during the contract period. (xxv) If Lift is non operational more than 24 hours recovery at the rate of Rs 5000 per day shall be charged from contractor. | |||||||
| 2.00 | All as per Ser Item No 01 incl all notes here in above but of capacity 08 passenger (544 Kgs) G+2 in 178 MH New Cantt Gangtok. | 11 | Each Calender month | 19,500 ₹2,14,500 | 21,000 ₹2,31,000 | 22,500 ₹2,47,500 | 18,500 ₹2,03,500 Lowest |
| 3.00 | All as per Ser item No 01 incl all notes here in above but of capacity 15 passemgers (1020 kg) G+3 in 178 MH New Cantt Gangtok. | 11 | Each Calender month | 20,000 ₹2,20,000 | 22,500 ₹2,47,500 | 22,500 ₹2,47,500 | 18,500 ₹2,03,500 Lowest |
| 4.00 | Supply only safety governor complete with all electrical connection & taking down the unserviceable one for lifts complete all as specified and directed. Testing shall be carried out after carrying out all necessary electrical connction /work for the proper functioning of the lift complete all as specified and directed. | 3 | Each | 17,000 ₹51,000 | 17,000 ₹51,000 | 17,800 ₹53,400 | 10,500 ₹31,500 Lowest |
| 5.00 | Supply only door curtain sensor proximity type taking out old unserviceable one complete al, as specified and directed | 4 | Each | 15,500 ₹62,000 Lowest | 16,000 ₹64,000 | 15,500 ₹62,000 Lowest | 20,500 ₹82,000 |
| 6.00 | Supply only brake lining upto 2500kg lift complete all as specified and directed. | 6 | Each | 5,500 ₹33,000 | 5,200 ₹31,200 | 3,500 ₹21,000 Lowest | 6,500 ₹39,000 |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
10 Sept 2026, 6:00 pmClosed
GE Gangtok
GE Gangtok New Mil Stn Gangtok Sikkim
COMPREHENSIVE MAINT OF LIFT AT 178 MH OTM ACCN SERVICING UNDER GE GANGTOK
2026_MES_778357_2
C/8465/A/E8
Open Tender
Miscellaneous Works
Works
335 days
GE Gangtok New Mil Stn Gangtok Sikkim
As per tender document
8 documents required · 8 mandatory
₹500
GE Gangtok
₹76,000
Yes
28 Sept 2026
22 Aug 2026
12 Sept 2026
22 Aug 2026
10 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehesive maintenance of lifts for day to day routine/periodical maintenance including supply of all consumable lubricants and repair or replacement of all components (spare parts) which may occur due to wear and tear except major parts as specified in notes here in after and paid separetly under relevant items and all as specified in para 16 of section 5 of part 8 of NBC 2016 for electrically operated automatic passenger/goods/ stretcher lift (OEM of lift :- EVS Elevators Pvt Ltd), Speed 0.5 m/s, (2500 Kg) G+3) in 17 Mtn DOU MSS building at Burdang for daily /routine/periodical maintenance as per direction of OEM or their accredited, authorised agencies including daily maintenance necessary of records & documents all as specified here in after. | 11 | Each Calender month | - | - |
| 1.02 | Cont......
(vii) The contractor shall provide of skilled/high skilled / mechanic /special engineer/ OEM consaltancy charge required for any fault during currency of contract period and cost of same shall be deem to be included above quoted rate.
(viii) The OEM or their accredited/ authorised agencies shall give one time training to all lift operators during currency of contract.
(ix) The OEM or their accredited/ authorised agencies shall conduct one safety audit during the currency of the contract for each lift and submit reports to the Engr-in-Charge.
(x) That for any break of terms and condition of the MOU by the contractor the OEM shall inform to the AGE.
(xi) The material cost of control panel, VVV Driver, ARD, batteries, etc (as mentioned in item nos here-in-after) shall not included in above quoted rate. All others repairs/repalcement required to maintain serviceability and safety of lift shall be deemed to be included in above quoted rate.
(xii) Force majure :- Any breakdown in lift caused due to natural calamities, i.e flood, earthquake, fire in building other than fire in lifts etc. shall be outside scope of routine/periodical maintenance.
(xiii) The decision of Accepting Officer on exclusion/inclusion in scope of routine/periodical maintenance shall be final and binding.
(xiv) List of building along with nos of passenger, name of OEM and nos of floor as mentioned in PS here-in-after, the bidder/tenderer is advised to visit all existing lift at site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly. | - | - | - | - |
| 1.03 | (xv) Make and model of part to be replaced shall be same as existing at site or as per OEM recommendation.
(xvi) The contractor shall contact with the OEM for Maintenance / shall have 10 yeras work experience serving at variour state / central / public sectors repairs
(xvii) The unit rate quoted shall deemed to include the cost of the consumbles and minor parts which are require for smooth maint of lift.
(xviii) Defective battries found in maint shall be repalced by the contractor without of any extra cost labour / manpower to the department.
(xix) The cost includes attending complaints of lifts and to carry out minor repairing within 24 hrs and major repair will be completed in 06 days failing which a penalty of Rs 100 per hour for minor repair and Rs 1000 per day for major repair will be levied to the contractor. The spares used for the repair will b paid in supply only item and will be measured and paid separately.
(xx) Comprehensive maint shall deemed to include to carry out repairs / replacement of worn out / defective all minor parts like as fuses,controller diode, buzer, resistance and necessary spares required to maintain the operation of the lift etc and other spare parts shall be measured and paid under relevant items of sch. | - | - | - | - |
| 1.04 | (xxi) Servicing / overhauling the lift at regular / specified intervals including checking of all electrical connections.
(xxii) Servicing the motor and gears, bearings with approved make lubricants.
(xxiii) Major spare / worn out spares required shall be measured & paid under relevant items.
(xxiv) Rate quoted inclusion the cost of attending the complaints/breakdown during the contract period.
(xxv) If Lift is non operational more than 24 hours recovery at the rate of Rs 5000 per day shall be charged from contractor. | - | - | - | - |
| 2 | All as per Ser Item No 01 incl all notes here in above but of capacity 08 passenger (544 Kgs) G+2 in 178 MH New Cantt Gangtok. | 11 | Each Calender month | - | - |
| 3 | All as per Ser item No 01 incl all notes here in above but of capacity 15 passemgers (1020 kg) G+3 in 178 MH New Cantt Gangtok. | 11 | Each Calender month | - | - |
| 4 | Supply only safety governor complete with all electrical connection & taking down the unserviceable one for lifts complete all as specified and directed. Testing shall be carried out after carrying out all necessary electrical connction /work for the proper functioning of the lift complete all as specified and directed. | 3 | Each | - | - |
| 5 | Supply only door curtain sensor proximity type taking out old unserviceable one complete al, as specified and directed | 4 | Each | - | - |
| 6 | Supply only brake lining upto 2500kg lift complete all as specified and directed. | 6 | Each | - | - |
| 7 | Supply only main contractor for drive complete with all electrical connection and taking down the unserviceable onefor lifts complete all as specified and directed. | 4 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tenderdocument8465A.pdf
Tender Documents • 0.43 MB
BOQ_880772.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .