Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical RECOMMENDED |
| 2 | Accepted-Technical 101B HAMILTON COURT DLF CITY PHASE 4 NEAR GALLERIA MARKET GURGAON GALLERIA DLF IV GURGAON HARYANA | GURGAON | GURGAON | HARYANA | 122009 | Accepted-Technical RECOMMENDED |
| 3 | Accepted-Technical | Accepted-Technical RECOMMENDED |
| 4 | Accepted-Technical BAROLA BYE PASS OPP ADA COLONY ALIGARH 202001 UP | ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | Accepted-Technical RECOMMENDED |
| 5 | Accepted-Technical A 1 31 JANAKPURI NEW DELHI 110058 | NEW DELHI | NEW DELHI | DELHI | 110058 | Accepted-Technical RECOMMENDED |
Tender Value
Refer Docs
EMD Value
₹21.1 L
Closing Date
25 Nov 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr.TAPAS SAHA ( GGM WORKS)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
LAYING, HDD AND ASSOCIATED WORKS OF PIPELINE UNDER JAMSHEDPUR GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
2024_GAIL_208367_1
GAIL/BNR/PROJ/WORKS/STEEL LAYING/24-14
Open Tender
Pipes and Pipe related activities
Works
365 days
JAMSHEDPUR GA (Jharkhand)
PLEASE REFER TO TENDER DOCUMENTS
11 documents required · 11 mandatory
₹0
₹21.1 L
Yes
LINK PROVIDED IN TENDER
10 Dec 2024
6 Nov 2024
26 Nov 2024
6 Nov 2024
25 Nov 2024
14 Nov 2024
13 Nov 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | SECTION-A :MAINLINE WORKS | - | - | - | - |
| 1 | CARBON STEEL PIPELINE LAYING | - | - | - | - |
| 2 | PIPELINE LAYING / INSTALLATION BY OPEN CUT / HDD / MOILING (WITHOUT CASING) METHOD AS PER THE PERMITTING AUTHORITY AND CMC/GAIL AUTHORITY. | - | - | - | - |
| 3 | "Receiving and taking over" as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3-Layer PE coated and bare linepipes from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of company supplied materials including linepipes at the time of taking over, laying/ installation of coated linepipes as per specification wherever required depending on site condition including execution of all works, "taking over", handling , including loading and unloading, transportation of Owner supplied materials other than linepipe from Owner's designated place (s) of issue to work site, arrangement of all | - | - | - | - |
| 4 | Additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: | - | - | - | - |
| 5 | Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review / approval. | - | - | - | - |
| 6 | Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities. During construction, mehodology of laying of steel pipeline (i.e. open cut/ HDD/ moling without casing) shall be decided as per requirement of various Government statutory/ environment authorities and the same methodology of steel laying shall be binding to the contractor for Authority's entire satisfaction. Grading / clearing of work area and shifting of all obstruction within the ROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc. with co-ordination with concerned authorities and obtain permissions from these authorities. | - | - | - | - |
| 7 | Barricading the pipeline construction area prior to execution of the works as per drawings enclosed with tender document and / or to to the entire satisfaction of Owner / Engineer-in-charge. | - | - | - | - |
| 8 | Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling. | - | - | - | - |
| 9 | Stringing of line pipes along pipeline trench / ROU on sand/soft soil bags including all supplies, manpower & machinary etc. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.49 MB
Tenderdocument.pdf
Tender Documents • 25.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .