Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 LAdmitted-Fee/PreQual/Technical/Finance AT TINIGHARIA NUA SAHI PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | +0.00% | ₹13.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹13.5 LAdmitted-Fee/PreQual/Technical/Finance AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | +0.00% | ₹13.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹13.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹13.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.5 L
EMD Value
₹13,600
Closing Date
22 May 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of public toilet in ward no-55.
2026_ORULB_127820_26
MC(CMC)CTC_Div-IIINo4/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹13,600
Yes
5 Jun 2026
12 May 2026
28 May 2026
12 May 2026
22 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. | 34.13 | CUM | 299.52 | ₹10,222.62 |
| 2 | Removal of un useful excavated materials away from work site by means of mechanical means including loading of the materials as work site and dipositing the same at suitable Dumping yards within 5km from work site as per direction of Engineer in charge . | 34.14 | CUM | 278.77 | ₹9,517.21 |
| 3 | Filling in foundatin and plinth with sand watered and rammed including cost of sand & labour | 4.25 | CUM | 612.7 | ₹2,603.98 |
| 4 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete . | 5.26 | CUM | 6,393.8 | ₹33,631.39 |
| 5 | Brick work with Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentt in cement mortar (1:4) in foundation and plinth | 20.05 | CUM | 5,762.8 | ₹1,15,544.14 |
| 6 | Cement concrete (1:11/2:3) with 12mm.size crusher broken hard Granite chips for R.C.C.work including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . | 2.11 | CUM | 8,767.2 | ₹18,498.79 |
| 7 | RCC Roof Slab ( Sump & Treatment chamber) | 4.1 | CUM | 14,173.05 | ₹58,109.5 |
| 8 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. | 18.61 | QNTL | 9,395.3 | ₹1,74,846.53 |
| 9 | 2.5cm. thick DPC concrete (1:2:4)on roof slab with 6mm. Size on new work crusher broken hard Granite chips including cost of all labour, materials with all taxes, lead, T & P etc all complete. | 13.61 | SQM | 395.9 | ₹5,388.2 |
| 10 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure. | 25.78 | CUM | 5,538.3 | ₹1,42,777.37 |
stage.html
html • 0.02 MB
finance_590937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_590937.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .