| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹73.0 L+₹9.0 L (14.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹99.9 L
EMD Value
₹2 L
Closing Date
18 Sept 2026, 12:00 pmClosed
Executive Engineer, RCD, Road Division Daltonganj
Executive Engineer, RCD, Road Division Daltonganj
Special Repair of Balumath-HerhanjPanki Road from 1 to 16 km (SH-10) Width-7.0 m for the year 2026-27
2026_CECOM_117990_1
6/RCD/Daltonganj/2026-27/1057
Open Tender
Civil Works
Percentage
90 days
PALAMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2 L
24 Sept 2026
29 Aug 2026
21 Sept 2026
29 Aug 2026
18 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable materials separately | 198.24 | M3 | 234 | ₹46,388.16 |
| 2 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 795.38 | M³ | 2,973.86 | ₹23,65,334.72 |
| 3 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 3,181.5 | M² | 82.21 | ₹2,61,564.54 |
| 4 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @0.25 kg/sqm on the prepared granular surface cleaned with mechanical broom. As per MOSRT&H specification 502 (4th revision ) & as per direction of E/I.
For BM | 3,181.5 | M² | 16.28 | ₹51,806.43 |
| 5 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @0.2 kg/sqm on the prepared bituminous surface cleaned with mechanical broom. As per MOSRT&H specification 502 (4th revision ) & as per direction of E/I.
For BM | 8,480.5 | M2 | 13.15 | ₹1,11,492.46 |
| 6 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 291.55 | M³ | 10,904.97 | ₹31,79,343.21 |
| 7 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II(10 mm nominal size) | 174.93 | M3 | 12,405.93 | ₹21,70,169.84 |
| 8 | Construction of subgrade and earthen shoulders
Construction of subgrade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 1,020 | M³ | 131.3 | ₹1,33,926 |
| 9 | Earthwork in cutting of ordinary soil (60% of length) | 1,050 | M3 | 62.4 | ₹65,520 |
| 10 | Add 18% GST on Total Amount of Civil Work (Sl. No. 1 to 9) | - | As Item | - | - |
stage.html
html • 0.02 MB
finance_159530.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tenderdocument.pdf
Tender Documents • 0.25 MB
BOQ_159530.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .