Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.0 CrAdmitted-Finance 610B NILGIRI BLOCK ADITYA ENCLAVE AMEERPET HYDERABAD 500038 | HYDERABAD | TELANGANA | 500038 | ₹79.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹85.7 CrAdmitted-Finance | ₹85.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹85.7 CrAdmitted-Finance | ₹85.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹90.3 CrAdmitted-Finance PLOT NO 94 SECTOR 4 ADARSH NAGAR PHALODI | PHALODI | PHALODI | RAJASTHAN | ₹90.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹91.0 CrAdmitted-Finance | ₹91.0 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S. S. Civil Construction Pvt. Ltd. L7 | MORTH INFRASTRUCTURE PVT LTD L10 | HVS Construction Materials Pvt. Ltd. L3 | DIVYA SIMANDHAR CONSTRUCTION PVT. LTD. L8 | SRI AVANTIKA CONTRACTOS (I) LIMITED L1 | CMM INFRAPROJECTS LIMITED L9 | Stone Concern Infrastructure Development Private Limited L2 | ALPA INFRASTRUCTURE PVT. LTD. L12 | M/s Heera Ram Godara L4 | MOHINDER SINGH CONTRACTOR L6 | LNS Infrastructures L11 | MS M AND S Co L5 | Park Infrastrucutre Limited L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PKG-1) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. | 1 | Lumpsum | 92,59,00,000 ₹92.6 Cr | 99,40,00,000 ₹99.4 Cr | 85,71,47,130 ₹85.7 Cr | 97,75,01,000 ₹97.8 Cr | 78,99,00,000 ₹79.0 Cr | 97,94,55,000 ₹97.9 Cr | 85,70,40,000 ₹85.7 Cr | 1,03,39,39,500 ₹103.4 Cr | 90,29,29,291 ₹90.3 Cr | 91,06,05,000 ₹91.1 Cr | 1,00,71,29,130 ₹100.7 Cr | 90,95,11,050 ₹91.0 Cr | 91,06,05,000 ₹91.1 Cr |
Tender Value
₹115.2 Cr
Closing Date
19 Mar 2021, 3:00 pmClosed
K C Bhatt
National Highways and Infrastructure Development Corporation Ltd. Third Floor, PTI Building, 4 Sansad Marg. New Delhi-110001
Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length 12.665 Km) (PKG-1) in Manipur on EPC mode.
2021_NHIDC_607268_1
NHIDCL/Manipur/Civil Work/ I-J/ /2020/Pkg-1
Open Tender
Civil Works
2372 days
Manipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
30 Mar 2021
4 Jan 2021
22 Mar 2021
4 Jan 2021
19 Mar 2021
10 Feb 2021
4 Jan 2021 - 28 Jan 2021
28 Jan 2021
Amount
Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PKG-1) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode.
Stone Concern Infrastructure Development Private Limited
HVS Construction Materials Pvt. Ltd.
M/s Heera Ram Godara
MS M AND S Co
Park Infrastrucutre Limited
MOHINDER SINGH CONTRACTOR
S. S. Civil Construction Pvt. Ltd.
DIVYA SIMANDHAR CONSTRUCTION PVT. LTD.
CMM INFRAPROJECTS LIMITED
MORTH INFRASTRUCTURE PVT LTD
LNS Infrastructures
ALPA INFRASTRUCTURE PVT. LTD.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
DCA.pdf
Tender Documents • 2.27 MB
RFP.pdf
Tender Documents • 2.88 MB
Schedules.pdf
Tender Documents • 3.79 MB
CostEstimate.pdf
Tender Documents • 5.63 MB
DrawingPt1.pdf
Tender Documents • 8.72 MB
DrawingPt2.pdf
Tender Documents • 16.44 MB
BOQ_638247.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid