| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹76.7 L+₹87,000 (1.15%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹79.7 L+₹3.9 L (5.12%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹93.9 L+₹18.1 L (23.8%)Rejected-Finance | L4 | Rejected-Finance Being L4 |
Tender Value
₹85.2 L
EMD Value
₹1.7 L
Closing Date
26 Jul 2023, 3:00 pmClosed
Chief Engineer
Civil Engineering Division, BARC Trombay, Mumbai
Carrying out various Civil Engineering jobs, Tree plantation work and other Miscellaneous Civil works for P-1185, near RAPS, Rawatbhata, Rajasthan for the year 2023-2024.
2023_BARC_760290_1
BARC/CED/ET/31/2023-2024 Dated 30.06.2023
Open Tender
Civil Works
Item Rate
548 days
RAPS, Rawatbhata, P.O.Anushakti via Kota
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.7 L
1 Nov 2023
5 Jul 2023
1 Aug 2023
5 Jul 2023
26 Jul 2023
11 Jul 2023
Amount
Part A : CIVIL WORKS Providing and supplying pickup light Non-AC Vehicle with driver including BS-IV norms on hiring basis for the use of Site Engineer of CED/HWD for 6 days a week from 8:00 am to 20:00 pm for carrying out day-to day official movement inside and outside RAPS,Rawatbhata and as directed by Engineer-In-Charge. Conditions : 1. The Vehicle shall be used by CED/HWD Engineers and departmental staff only. 2. The Model of "TATA Aria or similar vehicle " should be of year 2014 or later ( with BS-IV norms ) for a minimum run of 1200 Kms per month. 3. The actual usage shall be reckoned from the Headquarter at First Barrier,RR site (including Kota) and end there itself during official use. 4. The vehicle shall be maintained in good running condition with good upholstery, fitness, good tyres and shall commensurate with the image of BARC. The tyres of the vehicles shall be replaced periodically and always with brand new tyres and not retreated ones. 5. The vehicle should be free from all sorts of defects and will be subjected to inspection by a representative of BARC whose decision is final and binding as regards suitability of that particular vehicle. 6. The vehicle preferably be in White Colour and should be with a board " ON GOVERNMENT OF INDIA DUTY/ BARC". 7. The cost of Fuel/Oil/Lubricant, maintenance of vehicle, wages of driver, all taxes, toll charges, parking charges , comprehensive insurance, etc. shall be payable by the Contractor and BARC shall have no liability other than monthly charges towards usage of the vehicle. 8. Since the driver is engaged along with the vehicle, the contractor should required to engage skilled driver possessing valid driving license (Preferably professional) and also submitted the following documents . a.Registration Certificate of the vehicle. b. Driver License of the driver c.Valid Police Verification Certificate ( PVC) in respect of the driver. d.Name, Address and Telephone No. of the driver. e. Comprehensive Insurance Policy and Road Tax receipts of the vehicle. 9.The driver's of the vehicle shall maintain Log book supplied by Contractor and is required to obtain the signature of the user whenever the vehicle is used. 10.You are required to deploy same vehicle on day-to-day basis. 11.No revision of price shall be entertained during the period of contract. 12.In the event of breakdown of vehicle , alternative vehicle should be provided immediately .In case of failure to provide alternative vehicle within 2 hours, this centre would hire a vehicle on daily basis and the expenditure would be debited to your account besides imposing penalty of Rs. 500/- per day. 13.In case of absence of vehicle even for a day , proportionate payment towards a day will be deducted from monthly bill besides imposing a penalty of Rs. 500/-per day. 14.the charges for Extra KMS.over and above 1200 KMS. Is fixed to Rs. 7.00 ( Rupees Seven only per KM. 15. Since the Officers of CED/HWD, BARC are expected to use the vehicle on 6 days a week , the vehicle shall be kept free on Sundays and necessary maintenance may be undertaken. 16. The Contractor should have one spare driver having valid PVC for replacement in case of emergency, sickness etc. of the regular Drivers.
Extra over Item No. 1 for AC Pickup Vehicle
Supplying man power alongwith necessary pans, spades, shovels, pickaxe, punjas, ropes, small specials spade, rain coats, safety shoes etc., minimum two number of labour per day upto maximum any number of labour as and when decided by Project Engineer to work for eight hours per day or monsoon peiod to carry out the cleaning of chocked drain gratings grills / hume pipes/ footpath by removing the dry leaves silt etc., and also carry out seasonable departmental work allotted by Project Engineer from time to time.
Carrying out Civil Engineering works like surveying & leveling, checking of form work fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1)Each Job shall be carried out by one qualified Technician having minimum SSC with Trade certificate in Masonary/Plumber/Carpenter/Painter Trade of less than one year duration from ITI/Government Recognised Vocational Training Institute. (2)Deployment: The contractor shall deploy one Technician for each job for 6 working days per week for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the person will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out number of Jobs per day as directed by Engineer-in -Charge. (4) Mode of measurement : Measurement will be per job basis per day. A single job shall be carried out by deploying one Technician exclusively for the particular job. (5) Person should be engaged after scrutiny of BARC Engineers and approved by Competent authority.
Carrying out Construction safety implementation works like daily walk through survey, monitoring and complaints of safety requirements, implementing usage of safety gadgets, ensuring safety norms at work site, reporting unsafe condition to the site engineer and preparation of safety reports all as directed by the Engineer-in- charge. Note : (1)Each Job shall be carried out by one qualified Safety Steward having having minimum SSC with one year of Construction Safety field experience or SSC with certificate course in Construction Safety by MSME or equivalent Training Institute, with basic knowledge of First aid. (2)Deployment: The contractor shall deploy one Safety Steward for each job for 6 working days per week for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the person will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out number of Jobs per day as directed by Engineer-in -Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Safety Steward exclusively for the particular job.
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1)Each Job shall be carried out by one qualified Diploma holder/Licentiate in Civil/Construction Engineering / Technology conducted by Board of Technical Examinations / University/ Autonomous Govt / Govt recognized recognized Polytechnic/ Institute. (2)Deployment: The contractor shall deploy one Engineer for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the person will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out no. of jobs per month as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis per month. A single job shall be carried out by deploying one engineer exclusively for the particular job. (5) The minimum notice period before change of Engineer is 1 (One) month; failing which a compensation, for not providing technical support, of ₹ 500/- per day of shortfall in notice period will be levied on the contractor. (6) Engineer should be engage after scrutiny of BARC Engineers and on approval by Competent authority.
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1) Each Job shall be carried out by one qualified Degree holder with 1 (one ) year experience/Diploma holder with 3 year experience /Licentiate in Civil/Construction Engineering / Technology conducted by Board of Technical Examinations / University/ Autonomous Govt / Govt recognized recognized Polytechnic/ Institute. (2) Deployment: The contractor shall deploy one Engineer for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the person will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out no. of jobs per month as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one engineer exclusively for the particular job. (5) Engineer should be engage after scrutiny of BARC Engineers and approved by Competent authority.
Providing safety Personnel Protective Equipments (PPEs) for Engineers, supervisors and workers including transportation, delivery, storage in good condition etc. as instructed by Engineer in-charge.
Safety helmet- as per IS 2925 : 1984 (Reaffirmed 2000) or EN 397 CE approved including helmet refill with sweat band, chin strap, air slot for ventilation etc.
Safety shoe- as per IS:15298 Part 2 or EN 345
Full harness safety belt - conforming to EN 361 (IS:3521-1999) with twin braided rope lanyard having scaffolding hooks .
Ear muff- lightweight with adjustable ear cup as per IS:6996 ‐1973(Reaffirmed 1998) or EN 352‐1:2002
Hand Gloves - with 2 Thread Poly-cotton premium quality cotton as per IS:4770–1991 (Reaffirmed 2001)
Safety jackets - reflective jacket with fluroscent colour( green, yellow, orange) ,made of 110 gsm 100% Cotton Fabric
Safety goggles - with 180° field of vision of optical Class-1 meeting safety standard ANSI Z 87.1 High Impact Standard, CE Marked, conforming to EN 166 or IS 5983 (Reaffirmed 2002)
Taking levels at every 5 M c/c grid in the given area and plotting of contours at 1.00 m intervals. Taking invert levels of the existing drains along the length of the drain, culvert, inlets, outlets etc. complete at 10 m interval including rain water, sewer line chambers & septic tanks etc. and submit a separate drawing for the same showing the top and invert levels. This drawing should show all other details as directed by the Engineer-in-charge.
Part-B : Tree Plantation works Cutting, clearing of grass, creepers, bushes and removal of rubbish up to a distance of 50 M. outside the periphery of the area cleared-as per proposed BARC SOR (Horticulture) -2022.
Excavation in soil other than ordinary soil and hard rock i.e. murum,soft rock, road side etc. (as per CPWD Horiculture manual-2020 Sub Head:1.25 and as per proposed BARC SOR- (Horticulture) -2022) digging of holes in hard rock and refilling the same with the excavated earth/good earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%:1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth , if any, with all leads and lifts (cost of manure, sludge or good earth if needed to be paid separately). Size: Holes 1. M. dia and 1. M. Deep -
Planting trees and watering once-as per proposed BARC SOR- (Horticulture) -2022
Supply of Tree Saplings (well branched,Height- 5-6 feet)
Ficus benghalensis (Baniyan)
Ficus infectoria (Pilkhan)
Mimusops elengi(Bakul)
Neolamarkia cadamba(Kadamba)
Terminalia Arjuna(Arjuna Tree)
Tamarindus indica(Chinch/Imli)
Kigelia pinnata
Phylanthus emblica (Amla)
Syzigium cumini (Jamun)
Azadirachta indica (Neem)
Pongamia pinnata(Karanj)
Albizzia lebbeck (Shirish)
Bauhinia purpurea (Kanchan)
Supply of bamboo stakes-10-12 ft. in ht and of 2' dia & staking to the trees saplings.
Supply of red earth or good garden earth free from stones, murrum, stubbles grass runners, other foreign material etc. is to be supplied at the site including royalty and carriage.The volume of the soil shall be reduced by 20% for voids--as per proposed BARC SOR (Horticulture) -2022
Supplying of well decomposed FYM (dry cow dung manure) at site including royalty and carriage.The volume of FYM shall be reduced by 8% for voids.-as per proposed BARC SOR (Horticulture) -2022
Complete maintenance of trees, jobs like making of basin at regular interval, application of fertilizer etc (excluding the cost of materials which shall be supplied by the department and other T & P material/articles shall be provided by the contractor) as per direction of officer in charge (Trees - 250 nos. per month X 36 months)
M/S AGARWAL BROTHERS
M/s New India Builders
ARHAM CONSTROTECH PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .