Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹25.0 L+₹2.7 L (12.1%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.5 L+₹3.2 L (14.3%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | L. Subramani L3 | kvsm contruction L1 | G.Narayanappa L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 97 | M3 | 226 ₹21,922 | 220 ₹21,340 Lowest | 226 ₹21,922 |
| 2.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 (Open Earth work) | 16 | M3 | 113 ₹1,808 Lowest | 200 ₹3,200 | 113 ₹1,808 Lowest |
| 3.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 28 | M3 | 296 ₹8,288 | 245 ₹6,860 Lowest | 296 ₹8,288 |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 17 | M3 | 5,404 ₹91,868 | 4,700 ₹79,900 Lowest | 5,404 ₹91,868 |
| 5.01 | Foundation | 22 | M3 | 7,471 ₹1,64,327 Lowest | 7,500 ₹1,64,965 | 7,471 ₹1,64,327 Lowest |
| 5.02 | Ground Floor | 30 | M3 | 7,567 ₹2,27,010 Lowest | 7,600 ₹2,28,000 | 7,567 ₹2,27,010 Lowest |
| 6.00 | Brick Partition Walls using II class ground moulded chamber bricks of size 9"X43/8"X 23/4" in C.M 1:3 (one cement & Three Parts of crushed stone M-sand) using hoop iron reinforcement,if found necessary standard specification including finishing, curing,etc., complete complying with standard specification - 10 sqm | 11.5 | M2 | 968 ₹11,132 | 880 ₹10,120 Lowest | 968 ₹11,132 |
| 7.01 | Footing | 85 | M2 | 334 ₹28,390 Lowest | 400 ₹34,000 | 334 ₹28,390 Lowest |
| 7.02 | Column | 57 | M2 | 1,334 ₹76,038 Lowest | 1,400 ₹79,800 | 1,334 ₹76,038 Lowest |
| 7.03 | Beam & Slab | 142 | M2 | 1,112 ₹1,57,904 | 1,100 ₹1,56,200 Lowest | 1,112 ₹1,57,904 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
23 Jun 2026, 3:00 pmClosed
commissioner
hosur city municipal corporation
Construction of New Health Sub Centre Building at W.No.39, Nehru Nagar in Hosur City Municipal Corporation.
2026_MAWS_679759_3
7885/2025/E1 Hosur City Municipal Corporation
Open Tender
Civil Works
Works
120 days
hosur city municipal corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,000
13 Oct 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 97 | M3 | - | - |
| 2 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 (Open Earth work) | 16 | M3 | - | - |
| 3 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 28 | M3 | - | - |
| 4 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 17 | M3 | - | - |
| 5.01 | Foundation | 22 | M3 | - | - |
| 5.02 | Ground Floor | 30 | M3 | - | - |
| 6 | Brick Partition Walls using II class ground moulded chamber bricks of size 9"X43/8"X 23/4" in C.M 1:3 (one cement & Three Parts of crushed stone M-sand) using hoop iron reinforcement,if found necessary standard specification including finishing, curing,etc., complete complying with standard specification - 10 sqm | 11.5 | M2 | - | - |
| 7.01 | Footing | 85 | M2 | - | - |
| 7.02 | Column | 57 | M2 | - | - |
| 7.03 | Beam & Slab | 142 | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_816715.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.06 MB
Tendernotice_2.pdf
PDF • 0.96 MB
BOQ_816715.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .