Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹15,700
Closing Date
22 Sept 2026, 3:00 pm7d left
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
C/O Roof/Boundary wall to Intensive Cattle Development Centre Manzgam
2026_PWDJK_324055_3
56 Of RnB/D.H. Pora/2026-273723-31 Dtd 09/09/2026
Open Tender
Civil Works
Percentage
270 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Acc no 0470010200000099
₹15,700
9 Sept 2026
9 Sept 2026
24 Sept 2026
10 Sept 2026
22 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of all kinds of soil by mechanical means in trenches for foundations (not exceeding 1.5 m in width) and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms, all lifts including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 10.88 | cum | 225.18 | ₹2,449.94 |
| 2 | Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 88.27 | Cum | 164.2 | ₹14,494.2 |
| 3 | Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete. | 2.89 | Cum | 847.46 | ₹2,449.15 |
| 4 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 graded stone aggregate 40 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 1.93 | Cum | 4,527.46 | ₹8,737.99 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 grade stone aggregate 20 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 9.56 | Cum | 5,778.51 | ₹55,242.54 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 37.96 | sqm | 251.03 | ₹9,529.25 |
| 7 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 267.12 | kg | 127.97 | ₹34,182.28 |
| 8 | Providing hoisting and fixing trusses/purlins /rafters/posts/ post-plates or like components including cost of screws etc. complete popular wood | 5.88 | Cum | 24,152.54 | ₹1,42,016.95 |
| 9 | providing and fixing of iron gate made out of angle iron, flat iron, iron hollow sections of requried size and gauge including cutting, welding and fixing in position with locking arrangements etc including applying a primming coat of approved steel primer and two or more coats of paint complete | 82.29 | kg | 152.54 | ₹12,552.68 |
| 10 | Providing and applying white cement based putty of 2mm thick, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 89.64 | sqm | 158.72 | ₹14,228.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1092472.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .