Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.9 LAccepted-AOC 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 110001 | NEW DELHI | NEW DELHI | DELHI | 110001 | L1 | Accepted-AOC SOLE BIDDER |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
4 Jan 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
V K BHAT
GAIL NOIDA
WORK FOR IMPROVEMENT OF VENTILATION AND AIR QUALITY AT GAIL JUBIEE TOWER SECTOR-1 NOIDA
2022_GAIL_138778_1
GAIL/NOIDA/CNP/MAINT/22162
Open Tender
Electrical Works
Fixed-rate
180 days
GAIL NOIDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.3 L
Yes
THROUGH VC MODE
14 Mar 2024
20 Dec 2022
5 Jan 2023
20 Dec 2022
4 Jan 2023
22 Dec 2022
27 Dec 2022
Amount
HR TFAU controller with display should be mounted on the Marshalling box and should have RS 485 output to be integrated to BMS. The AHU controller should be compatible with Modbus protocol. All control wiring and integration should be done at factory level. The unit shall be provided with well calibrated external sensor/s of approved make for PM 1/ 2.5 etc. and shall be factory wired to each unit's built-in PLC. The PLC shall be BMS compatible with BACnet/ Modbus output towards soft integration (maximum 10 IO points), the controller shall generate alarms, monitor all above mentioned IAQ parameters, and control fan speed & on/off etc. The unit should meet all specified IAQ parameters, and maybe subjected to 3rd Party IAQ Testing. HR TFAU should have marine lamp including adequately rated CFL bulb inside the AHU Cabinet. AHU inspection door should have View Window with perfectly sealed gaksets on either side to ensure air tightness. All HR TFAUs shall be provided with door limit switch and also door safety GI guard. All internals shall be powder coated for corrosion resistance. The unit shall be provided mixing box having access doors/ panels for fresh air duct termination as per "Approved for Construction" - Shop Drawings. TFAU control panel should have NO/NC contacts for AFAS Integration. TFAUs shall be suitable for BMS Integration and EC Fan speed modulatiion through DPS. TFAUs shall follow the design parameters as mentioned below: Lower Tier: i) Supply Air Quantity: 15000 Cfm (two fans 50% capacity each) ii) Static Pressure : 120 mm WG iii) Motor Rating : 2x10 HP Upper Tier i) Supply Air Quantity: 12000 Cfm (two fans 50% capacity each) ii) Static Pressure : 70 mm WG iii) Motor Rating : 2x7.5 HP HR TFAU as described above. Note: HRW minimum 75% efficeincy. Motor Rating is only indicative. The work also includes de-installation/Dismantling and Lifting/Shifting of the New/Old/Existing complete TFA unit including tools, tackles and labour charges etc.(As per SCC/SOW and directions of EIC).
CHILLED WATER PIPING (CHW): Providing and fixing in position MS heavy class pipes, controls, valves & fittings, and all accessories required to make the FATU fully functional. Quoted price shall be inclusive of insulation and weather-proof treatment as required for the complete chilled water supply and return network, and requisite hydronic balancing. (As per SCC/SOW and directions of EIC).
AIR DISTRIBUTION
Ductwork: Conventional Site Fabricated Ductwork: Supply, Fabrication, Installation and Testing of sheet metal ducts complete with Slip-on/ TDF flanges and fire retardant gaskets as per specifications, threaded rod suspension arrangement, GI perforated 'C' channel supports etc. in accordance with the approved shop drawings and specifications. The ducts shall be fabricated on site by HVAC vendor as per specifications. The joints shall be with least leak and shall be pressure tested. All ducts shall undergo deep cleaning process to remove construction dust prior to testing & commisioning. Quoted price shall be inclusive of insulation and weather-proof treatment as required for the complete treated fresh air supply and return network. (As per SCC/SOW and directions of EIC).
Complete Air Distribution System Balancing for Treated Fresh Air System for all floors. Quoted price shall be inclusive of air balancing readings through capture hood, any additional manual VCDs required etc. to completely balance the system. Exisitng DCV to be disabled to allow for more ventilation air to the office. (As per SCC/SOW and directions of EIC).
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .