Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-Finance A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
3 Feb 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Reconditioning of released FRP fan blades 2 Sets of cooling tower ID fans of stage II
2021_EB_191837_1
SE / M-I / MTPS-I / CA/OT. 285 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
60 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹5,200
Yes
6 Feb 2021
20 Jan 2021
4 Feb 2021
20 Jan 2021
3 Feb 2021
20 Jan 2021
Amount
Charges for loading ,unloading and Transporting of 1 set of FRP fan blades of cooling tower ID fans of stage-II from MTPS-I central stores to outside workshop for reconditioning works and return back the same from outside workshop to MTPS -I central stores after completion of Reconditioning works. ( 2 Sets = 16 Nos)
Charges for cleaning of blades with wire brush and acid washing. Grinding and removing of existing resin, putty and chopped strand mat over the arm and blade surface of entire blade.
Charges for smooth leveling by grinding and sander machine, applying putty on the arm and blade surface, smooth leveling by emery sheet. After that the chopped strand mat to be wounded on the blade and arm surface area mixed with Isobathic resin, Catalyst, Accelerator & pigment as recondition work. [Cost of Isobathic resin, catalyst, accelerator and pigment are on contractor scope]
Charges for applying two coats of Isobathic resin for smooth finishing over the entire surface of blade, weighing of blade should be maintained 65Kgs+/-0.5 and marking the weight. [Cost of Isobathic resin on contractor scope]
Charges for painting with two coats of epoxy grey Paint over the surface of the FRP blades including the cost of paint.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .