Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98,873Accepted-AOC | ₹98,873 Quoted ₹1.2 L | L1 | Accepted-AOC Award of work |
| Sl No | Description | Qty | Unit | ALAGAPPA CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Conducting reconnaissance survey, including ranging rod allignment including cost of all materials transport of men and materials and hire charges for survey T & P's etc.complete for 1.5 Km | 1 | Km | 4,600 ₹4,600 Lowest |
| 2.00 | Conducting detailed survey with GPS, Total station, DGPS, ploting of profile & tower spotting & Profile in duplicates including cost of all materials, labour, lead etc. complete | 1 | Km | 20,000 ₹20,000 Lowest |
| 3.00 | Preparation of route alignment with remote sensing and field verification in GTS Map using 1:50000 scale including procurement, processing GTS Map, GEO referencing route alignment, integrate route in the layout with identification of Reserve Forest, developed area etc., including cost of all materials, labour all lead, lifts etc.,complete | 1 | Km | 733 ₹733 Lowest |
| 4.00 | Taking Colour print outs of GTS route map in A0 size topo sheet in 1:50000 scale using GPS Co-ordinates including cost of all materials, labour, all leads, lifts etc.,complete | 10 | Sets | 1,500 ₹15,000 Lowest |
| 5.00 | Procurement of Satellite images, procurement of required number of scenes as required for route from NRSA (National Remote Sensing Agency up to 3km or part there of including cost of all materials, labour,lead, lifts etc.,complete | 10 | Sets | 5,200 ₹52,000 Lowest |
| 6.00 | Clearing Julifora Jungles without up rooting along the proposed route for conducting Theodolite survey including cost of all materials, labour ,lead, lifts etc.,complete | 1,200 | M2 | 6 ₹7,200 Lowest |
| 7.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | LS | 9 ₹8,957.97 Lowest |
| 8.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | LS | 9 ₹8,957.97 Lowest |
| 9.00 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | LS | - |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
18 Feb 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Conducting preliminary survey E.Kumaralingapuram 110/33-11 KV SS
2026_EB_656243_1
SE/GCC/Madurai F. Specn. No.070/2025-26
Limited
Survey
Works
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
22 May 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
Conducting reconnaissance survey, including ranging rod allignment including cost of all materials transport of men and materials and hire charges for survey T & P's etc.complete for 1.5 Km
Conducting detailed survey with GPS, Total station, DGPS, ploting of profile & tower spotting & Profile in duplicates including cost of all materials, labour, lead etc. complete
Preparation of route alignment with remote sensing and field verification in GTS Map using 1:50000 scale including procurement, processing GTS Map, GEO referencing route alignment, integrate route in the layout with identification of Reserve Forest, developed area etc., including cost of all materials, labour all lead, lifts etc.,complete
Taking Colour print outs of GTS route map in A0 size topo sheet in 1:50000 scale using GPS Co-ordinates including cost of all materials, labour, all leads, lifts etc.,complete
Procurement of Satellite images, procurement of required number of scenes as required for route from NRSA (National Remote Sensing Agency up to 3km or part there of including cost of all materials, labour,lead, lifts etc.,complete
Clearing Julifora Jungles without up rooting along the proposed route for conducting Theodolite survey including cost of all materials, labour ,lead, lifts etc.,complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_786915.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].