Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.8 L+₹37,564.54 (4.47%)Rejected-AOC | 2 | Rejected-AOC l2 | |
| 3 | Not Admitted-Fee/PreQual/Technical R O TILAKHURA TO JHALALBURUA LINK ROAD | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S PUSHPA CONSTRUCTION COMPANY L2 | M/S DEVENDRA VIKRAM SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per Drawing & direction of engineer-in-charge. | 63.8 | Cum | 111.53 ₹7,115.61 | 100 ₹6,380 Lowest |
| 2.00 | Dewatering at site (Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.Workdone as per direction of Engineer-in-charge.) | 20 | Hr. | 192.5 ₹3,850 | 160 ₹3,200 Lowest |
| 3.00 | Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 4.34 | Cum | 910.2 ₹3,950.27 | 800 ₹3,472 Lowest |
| 4.00 | Laying Plain Cement Concrete (M-10) in foundation 1:3:6 with stont grit including cost of material, labour, T&p etc, complete. | 35.91 | Cum | 8,251.09 ₹2,96,296.64 | 7,800 ₹2,80,098 Lowest |
| 5.00 | Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.Workdone as per Drawing & direction of engineer-in-charge. | 37.79 | Cum | 7,749.37 ₹2,92,848.69 | 7,500 ₹2,83,425 Lowest |
| 6.00 | M-15 Brick on Eadge Pitching in 1:4 CM including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. | 122.4 | Sqm | 931.41 ₹1,14,004.58 | 883 ₹1,08,079.2 Lowest |
| 7.00 | Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge. | 7.85 | Cum | 9,921.99 ₹77,887.62 | 9,800 ₹76,930 Lowest |
| 8.00 | (Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per as per Drawing & direction of engineer-in-charge. | 0.13 | MT | 1,00,800 ₹13,104 | 99,000 ₹12,870 Lowest |
| 9.00 | Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. | 83.82 | Sqm | 130 ₹10,896.6 | 120 ₹10,058.4 Lowest |
| 10.00 | Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc . | 2 | No. | 5,683 ₹11,366 | 5,200 ₹10,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,600
Closing Date
6 Mar 2023, 10:00 amClosed
EE ID UNNAO
OFFICE OF THE EE ID UNNAO
9- REPAIRING OF FALL AT HARDOI BR. KM 166.030 .
2023_UPIDC_778702_9
03/EE/2022-2023
Open Tender
Civil Works - Canal
Item Wise
20 days
UNNAO
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,266
₹17,600
17 Oct 2026
28 Feb 2023
6 Mar 2023
28 Feb 2023
6 Mar 2023
28 Feb 2023
Amount
E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per Drawing & direction of engineer-in-charge.
Dewatering at site (Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.Workdone as per direction of Engineer-in-charge.)
Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge.
Laying Plain Cement Concrete (M-10) in foundation 1:3:6 with stont grit including cost of material, labour, T&p etc, complete.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.Workdone as per Drawing & direction of engineer-in-charge.
M-15 Brick on Eadge Pitching in 1:4 CM including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc.
Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
(Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per as per Drawing & direction of engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete.
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
E/W IN REMOVING/CUTTING INCLUDING WITH ALL COST OF LABOUR T&P ETC.
M/S PUSHPA CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .