Tender Value
₹8.8 L
EMD Value
₹17,642
Closing Date
16 May 2025, 11:00 amClosed
BALKAR
Hisar PHED No. 3
Silt Clearnace of Storm water drain from Barwala byepass Storm Disposal to CIRB pond and from CIRB pond to South Bye pass Disposal pumping site CIRB near Sector -33 Police Chowki and from CIRB pond to minor ponds towards IIWBR with minimum 12 feet
2025_HRY_445868_1
20251B77AD7A 4F7E 475B 84AF 9E755EAC9981566PUH
Open Tender
Civil Works
Works
60 days
Hisar
As Per DNIT
3 documents required · 3 mandatory
₹1,000
₹17,642
Yes
20 Jun 2025
9 May 2025
16 May 2025
9 May 2025
16 May 2025
9 May 2025
Amount
Filling of sand in layer along boundary wall of police line area along Barwala chungi Flyover for strengthening of berm to prevent entry of storm water towards Police line area including compaction of sand in layers (width of sand layer 4 feet and depth upto 3 feef ),sand bags if required complete in all respect as per full satisfaction of Engineer-in-charge.
Silt clearnace of storm water drain from Barwala byepass Storm Disposal to CIRB pond with minimum 12 feet width x 4 feet depth by poclain machine (215 No.) in kacha drain upto bed level with driver, fuel charges and lubricant charges including jungle clearance, dressing of drain bank for working space of poclain machine (215 No.) , cleaning under the bridges/syphon upto the satisfaction of Engineer in charge and collecting of silt directly into the trolley and same disposing off from site to outside the city at non disputed area along NH - 9 and other location if required complete in all respect.
Silt clearnace of storm water drain from CIRB pond to South Bye pass disposal pumping site near Sector-33 Police Chowki and from CIRB pond to minor ponds towards IIWBR with minimum 12 feet x 4 feet depth by poclain machine (215 No.) in kacha drain upto bed level with driver , fuel charges and lubricant charges including jungle clearance, dressing of drain bank for working space of poclain machine (215 No.) , cleaning under the bridge /Syphon upto the satisfaction of Engineer in charge and collecting of silt directly into the trolly and same disposing off from site to outside the city at non disputed area if required complete in all respect.
Bidder Name
Amount
SUNNY KUMAR CONTRACTOR (GSTN-06BXXPK9087Q1Z0) BID ID -1262104
Sanwaria Construction Company and Supplier (GSTN-NA) BID ID -1262079
AARNA ENTERPRISES (GSTN-NA) BID ID -1262108
AARNA ENTERPRISES (BID ID -1262108)
SUNNY KUMAR CONTRACTOR (BID ID -1262104)
AARNA ENTERPRISES (BID ID -1262108)
SUNNY KUMAR CONTRACTOR (BID ID -1262104)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .