| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC VILLAGE PO MALAHAT TEHSIL DISTRICT UNA HP | ₹15.0 L Quoted ₹15.9 L | L1 | Accepted-AOC Lower amount quoted |
| 2 | L2₹16.7 L+₹83,745.30 (5.28%)Rejected-Finance | ₹16.7 L+₹83,745.30 (5.28%) | L2 | Rejected-Finance Higher amount quoted |
| 3 | L3₹16.9 L+₹1.1 L (6.68%)Rejected-Finance | ₹16.9 L+₹1.1 L (6.68%) | L3 | Rejected-Finance Higher amount quoted |
| 4 | Rejected-Technical BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | - | - | Rejected-Technical Not Fulfill Technical Critaria |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Fulfill Technical Critaria |
| Sl No | Description | Qty | Unit | Nitish Thakur L1 | Pritpal Singh L2 | Davinder Singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of Damaged/Launching Apron of existing embankment made of G.I. wire filled with boulder with square cut faces stacked at site with in all leads and lifts and as per direction of the Engineer-In-Charge. | 381.25 | Cum | 300 ₹1,14,375 Lowest | 320 ₹1,22,000 | 350 ₹1,33,437.5 |
| 2.00 | Excavation in earth work and disposal of all excavated earth upto a lead of 20mtrs and lift upto 1.50mtrs. Disposed work earth to be levelled and neatly dressed in spade work as per entire satisfaction of Engineer-In-Charge | 307.5 | Cum | 240 ₹73,800 Lowest | 260 ₹79,950 | 250 ₹76,875 |
| 3.00 | Wire crates made of G.I wire filled with boulders with square cut faces against the wire(boulders filling to be measured & paid for separately) with G.I wire 5.00 mm thick corresponding to (SWG-6)of 15x15cm mesh in apron and sloping pitching including carriage of materials within all leads and lifts | 1,907.89 | Sqm | 400 ₹7,63,156 Lowest | 420 ₹8,01,313.8 | 430 ₹8,20,392.7 |
| 4.00 | Laying stone filling in apron and toe wall of guide banks for protection work embankment in wire creates made of G.I wire filled with boulders with square cut faces against the wire (wire creates to be measured and paid for seprately) i/c carriage of materials with in all leads & lifts | 225 | Cum | 1,000 ₹2,25,000 Lowest | 1,100 ₹2,47,500 | 1,110 ₹2,49,750 |
| 5.00 | Providing & Laying stone filling in apron and toe wall of guide banks for protection work embankment in wire creates made of G.I wire filled with boulders with square cut faces against the wire (Wire creates to be measured and paid for seprately) i/c carriage of materials with in all leads & lifts. | 186.25 | Cum | 2,200 ₹4,09,750 Lowest | 2,250 ₹4,19,062.5 | 2,210 ₹4,11,612.5 |
Tender Value
₹15.0 L
EMD Value
₹29,962
Closing Date
12 Aug 2026, 12:00 pmClosed
Executive Engineer JSV Flood Prot. Division Gagret
Executive Engineer JSV Flood Prot. Division Gagret
Repair and Maintenance of Existing create wall from RD 8200/13150 to 13250 on left side of Chatara Khad on left bank of Swan River in Village Chatara Khas).
2026_HPIPH_140522_1
JSV-FPDG-EA-I/2026-4969-5008 dt 04.08.2026
Open Tender
Civil Works
Item Rate
90 days
Executive Engineer JSV Flood Prot. Division Gagret
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹29,962
11 Sept 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
4 Aug 2026 - 12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Damaged/Launching Apron of existing embankment made of G.I. wire filled with boulder with square cut faces stacked at site with in all leads and lifts and as per direction of the Engineer-In-Charge. | 381.25 | Cum | - | - |
| 2 | Excavation in earth work and disposal of all excavated earth upto a lead of 20mtrs and lift upto 1.50mtrs. Disposed work earth to be levelled and neatly dressed in spade work as per entire satisfaction of Engineer-In-Charge | 307.5 | Cum | - | - |
| 3 | Wire crates made of G.I wire filled with boulders with square cut faces against the wire(boulders filling to be measured & paid for separately) with G.I wire 5.00 mm thick corresponding to (SWG-6)of 15x15cm mesh in apron and sloping pitching including carriage of materials within all leads and lifts | 1,907.89 | Sqm | - | - |
| 4 | Laying stone filling in apron and toe wall of guide banks for protection work embankment in wire creates made of G.I wire filled with boulders with square cut faces against the wire (wire creates to be measured and paid for seprately) i/c carriage of materials with in all leads & lifts | 225 | Cum | - | - |
| 5 | Providing & Laying stone filling in apron and toe wall of guide banks for protection work embankment in wire creates made of G.I wire filled with boulders with square cut faces against the wire (Wire creates to be measured and paid for seprately) i/c carriage of materials with in all leads & lifts. | 186.25 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TermsandConditions.pdf
Tender Documents • 0.65 MB
Form6and8.pdf
Tender Documents • 1.06 MB
BOQ_208434.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .