| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.6 LAccepted-AOC ROOM NO D 290 PART III GALI NO 8 SHREE GANESH MURTHI NAGAR CUFFE PARADE ROAD COLABA MUMBAI 400005 | MUMBAI | MAHARASHTRA | 400005 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹69.4 L+₹2.6 L (3.87%)Rejected-Finance FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹80 L+₹13.2 L (19.8%)Rejected-Finance A 14 USHA SADAN NEAR POST OFFICE COLABA MUMBAI 05 | MUMBAI | MUMBAI | MAHARASHTRA | 400005 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹80.9 L+₹14.1 L (21.1%)Rejected-Finance | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹84.1 L+₹17.3 L (25.9%)Rejected-Finance 15 281 CHHILI INT ROAD GHATIYA AZAM KHAN AGRA UTTAR PRADESH 282003 | AGRA | UTTAR PRADESH | 282003 | L5 | Rejected-Finance Other than being lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
14 Feb 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
PERIODICAL SERVICES TO INTERNAL AND EXTERNAL SURFACES OF CERTAIN BUILDINGS COMMON AREA PAINTING REPAIRS TO FLOORING AND TILING OF R12 R14 AND R 20 AND CERTAIN MISC B/R REPAIRS AT OLD RS COLABA UNDER AGE B/R II (NW) NAVY NAGAR OF GE (NW) NAVY NAGAR CO
2022_MES_499460_1
8266/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
Item Rate
270 days
GE (NW) Navy Nagar
Class B and Category a (i)
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹2.2 L
Yes
12 Apr 2022
4 Jan 2022
16 Feb 2022
4 Jan 2022
14 Feb 2022
31 Jan 2022
4 Jan 2022 - 30 Jan 2022
Amount
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles and rubbish off the premises etc complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for Brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 15mm thick in CM 1:6 for laying floor finishes complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and incliding 15mm thick CM (1:4) as in backing coat complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour non-skid coloured Ceramic tiles 6 to 7mm thick (square/rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in cement mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour Coloured glazed ceramic tiles 450x 300 x7 mm thick on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and as directed.
Material and labour for rendering 10mm thick in cement mortar 1:4 on backing coat of wall tiles etc complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking up or down GI tubing and connections 15 mm bore including cleaning for refixing or removal to store complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Refixing old GI tubing and connection15 mm bore in new or old position in ( Walls, ceiling, floors etc) with old accesories complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Supply and fixing GI Tubing 15 mm bore medium grade with all fitting and fixed comlete to wall and ceiling or laid in floors complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down cement plaster of any description including racking out joints hacking for key scrubbing down with water in patches n.exc. 4 Sqm each. Complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for rendering 15mm thick in CM 1:6 on other than fair faces of bricks work or concrete finished even and smooth without using extra cement. Complete all as speicified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for 05 mm thick plastering in CM 1:3 on concrete surface on ceiling finished even and smooth all specified & as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net etc all complete as directed by Engr-in-Charge. (Note :- WPC to be mixed in setting coat only and shall be measured and paid separately)
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved ISI make. Complete all as specified and as directed.
Material and labour preparing newly plastered surfaces of walls and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer & bio wash on wall. Complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Preparing surfaces, plastered or unplastered new surfaces, priming plastered and other surfaces with alkali-resistant priming paint and applying two coats of distemper oil emulsion over a coat of wall care putty, white or tinted on walls all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Complete removal of existing treatment from wall surfaces by scrapping, washing & applying two coat of Oil bound distemper of approved make on wall over a coat of wall priming paint over a coat of Birla white putty on plastered surface and filling the surface inperfections such as holes, dirt, fine cracks all complete including preparation of surfaces all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for Preparation of surface plastered or unplastered old surfaces and applying two coats of white wash on on ceiling complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
All as per item 22 above but on ceiling.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint, complete all as specified and as directed by EIC.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint over a coat of antirush paint/red oxide primer, complete all as specified and as directed by EIC.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Dismantling of stone slabs, bedded and pointed in any mortar of any description or thickness in floors, approns etc. Complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour granite (of any type) slab 18 to 20mmthick machine cut,bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding and polishing complete for kitchen platform etc.over and including 20mm thick screed bed in CM 1:4 Complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour machine cut Kota stone (greenish colour, mirror polished) slab flooring 18 to 20 mm thick over cement screed bed laid and jointed with grey cement slurry mixed with pigment to match the shade of slab incl rubbing and mirror polishing, over & incl 20mm thick screed bed in CM 1:6 complete all as specified and directed by Engr-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour preparation of old decorated surfaces of wall including washing and applying two coat of Acrylic emulsion paint exterior grade (100% Acrylic) over one coat of primer incl necessary scaffolding, Safety net etc all complete as directed by Engr-in-Charge.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour for water proofing treatment of external walls by applying two coats of elastomeric external acrylic water proofing coating material (STP Shalicryl 215)after cleaning the surface thoroughly and sealing all cracks with acrylic sealing compound as per the manufacturer’s specifications and directions of Consultant/Architect. Make : Build core STP chemicals or equivalent. complete all as specified & as directed by EIC. (Note :- work will be carred out with scafolding all over bldg upto 14th floor of wall. Rate of scaffolding & acrylic based exterion paint is included in this item).
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Material and labour anodised aluminium sheeting 22 gauge thick fixed in repairs as in crumple section. Complete all as specified and as directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Removal of debries outside of MoD land exc. 5 Km but n.exc. 10km and depositing where directed by Engr-in-Charge. Note : Work shall be carried out upto G+14 storey bldg. Rate include scaffolding and safety net cloth at place.
RAMESH ENTERPRISES
S S ENTERPRISES
SATYANARAYAN CONSTRUCTION
Garima Construction Co
SHREE JAGDISH FURNITURE CO.
RAJENDRA CONSTRUCTION
Darpan Construction
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .