| Sl No | Description | Qty | Unit | SRI BANU CONSTRUCTIONS L1 | Murali and Co L2 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plant | 267 | M2 | 20 ₹5,340 | 15 ₹4,005 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform | 246 | M3 | 2,600 ₹6.4 L | 2,495 ₹6.1 L |
| 3.00 | Providing and laying Prime Coat over WMM Surface using 7Kg of Emulsion Bitumen (SS-I) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incident | 2,460 | M2 | 84 ₹2.1 L | 84 ₹2.1 L |
| 4.00 | Providing and laying Tack Coat over WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fue | 2,460 | M2 | 18 ₹44,280 | 19 ₹46,740 |
| 5.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 8,315 | M2 | 28 ₹2.3 L | 28 ₹2.3 L |
| 6.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per | 539 | M3 | 10,700 ₹57.7 L | 10,750 ₹57.9 L |
| 7.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 47.28 kgs of 60/70 Grade Bulk bitumen and 3.02 kg of shredded Plastic waste for premixing per 1 | 324 | M3 | 11,300 ₹36.6 L | 11,300 ₹36.6 L |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
23 Jan 2026, 3:00 pmClosed
Executive officer
EXECUTIVE OFFICER SARKARSAMAKULAM TOWN PANCHAYAT
Relaying of BT Road at ward No.7 Crown City Phase - I and Strengthening of BT Road at Ward No.9 Dream City Main Road and Cross Streets in Sarkarsamakulam Town Panchayat.
2026_DTP_641535_1
18/2026
Open Tender
Civil Works - Roads
90 days
work
AS PER TENDER NORMS
5 documents required · 5 mandatory
₹0
₹1.3 L
Sarkarsamakulam
27 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
14 Jan 2026
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plant
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform
Providing and laying Prime Coat over WMM Surface using 7Kg of Emulsion Bitumen (SS-I) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incident
Providing and laying Tack Coat over WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fue
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 47.28 kgs of 60/70 Grade Bulk bitumen and 3.02 kg of shredded Plastic waste for premixing per 1
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
TURIFFBID.pdf
Tender Documents • 0.85 MB
BOQ_768403.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid