| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.1 LAccepted-AOC NEAR BANGLA PARAS VPO DHANANA TEHSIL AND DISTRICT BHIWANI 127231 | 127231 | ₹45.1 L | L1 | Accepted-AOC 1st agency |
| 2 | L2₹47.7 L+₹2.7 L (5.96%)Rejected-AOC HARYANA HR | FARIDABAD | HARYANA | 121001 | ₹47.7 L+₹2.7 L (5.96%) | L2 | Rejected-AOC 2nd agency |
| 3 | L3₹48.2 L+₹3.2 L (7.08%)Rejected-AOC 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | ₹48.2 L+₹3.2 L (7.08%) | L3 | Rejected-AOC 3rd agency |
| 4 | L4₹48.5 L+₹3.4 L (7.58%)Rejected-AOC | ₹48.5 L+₹3.4 L (7.58%) | L4 | Rejected-AOC 4th agency |
| 5 | L5₹48.8 L+₹3.7 L (8.27%)Rejected-AOC NA | NA | NA | 121004 | ₹48.8 L+₹3.7 L (8.27%) | L5 | Rejected-AOC 5th agency |
| Sl No | Description | Qty | Unit | M/S LAXMI CONSTRUCTION CO. L4 | The Kharkara co-op L&C Society Ltd. L5 | THE BHAGWATI COOP LANDC SOCIETY LTD L3 | Ramehar L1 | Naresh Kumar Contractor L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Credit of old bricks and Brick Bats | 134.16 | cum | 540 ₹-72,446.4 Lowest | 540 ₹-72,446.4 Lowest | 540 ₹-72,446.4 Lowest | 540 ₹-72,446.4 Lowest | 540 ₹-72,446.4 Lowest |
| 2.00 | Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (24` x 24`) | 138 | Each | 121.67 ₹16,790.46 | 116.46 ₹16,071.48 | 150 ₹20,700 | 114 ₹15,732 Lowest | 200 ₹27,600 |
| 3.00 | Supply, carriage and fixing of R.C.C lids Dia 18` | 69 | Each | 113 ₹7,797 | 109.12 ₹7,529.28 | 150 ₹10,350 | 106 ₹7,314 Lowest | 200 ₹13,800 |
| 4.00 | Supply carriage and laying of 100 micron polythene under bed lining | 3,522.67 | Sqm | 13 ₹45,794.71 | 13.23 ₹46,604.92 | 20 ₹70,453.4 | 11 ₹38,749.37 Lowest | 50 ₹1,76,133.5 |
Tender Value
₹46.2 L
EMD Value
₹92,370
Closing Date
16 Mar 2026, 12:00 pmClosed
MUNISH Deshwal
MICAD Division Bhiwani
Estimate for Remodeling/Rehabilitation for lining of W/C At Outlet RD 23060-R Sunder Disty
2026_HBC_507047_1
20265BF7B8BE FA85 4B17 A30D FEF04B2C9E85371CAD
Open Tender
Civil Works
Works
365 days
KUNGAR BADA PANA KUNGAR BADA PANA KUNGAR BADA PA
3 documents required · 3 mandatory
₹2,500
₹92,370
Yes
10 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
9 Mar 2026 - 13 Mar 2026
Credit of old bricks and Brick Bats
Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (24` x 24`)
Supply, carriage and fixing of R.C.C lids Dia 18`
Supply carriage and laying of 100 micron polythene under bed lining
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Civil Work
[11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate]
[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
[7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
[7.65]Extra for specially moulded brick work in circular work such as wells, shafts, circular sumps, pumps chambers, etc. in which specially moulded or cut-bricks have to be used: but for which no centring or supports are required up to 4.5 metres internal diameter. [Through Rate]
stage.html
html • 0.05 MB
technical_585800.pdf
techsummary_585800.pdf
finance_585800.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_585800.xls
BOQ • 0.29 MB
AD0145792.pdf
Additional Documents • 0.37 MB
OT0145792.pdf
Other Document • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .