Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-Finance | L1 | Accepted-Finance As per the bid | |
| 2 | L2₹11.0 L+₹73,593.23 (7.17%)Rejected-Finance | L2 | Rejected-Finance As per the bid | |
| 3 | L3₹11.0 L+₹74,683.90 (7.27%)Rejected-Finance A CLASS ENGG CONTRACTOR AT LATHORE PO HARISHANKAR ROAD PS KHAPRAKHOL DIST BALANGIR | L3 | Rejected-Finance As per the bid | |
| 4 | L4₹11.3 L+₹1.1 L (10.5%)Rejected-Finance | L4 | Rejected-Finance As per the bid |
Tender Value
₹11.0 L
EMD Value
₹11,017
Closing Date
7 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER NAC JUNAGARH
O/o-NAC Junagarh Infront of AXiS Bank Pin-766014 Kalahandi
Construction of Cement Concrete Paver Platform in the Courtyard of Crematorium near Hati River in Ward No 08
2026_ORULB_126481_16
JNG/NAC/02/2025-26
Open Tender
Civil Works - Others
Percentage
WARD NO 08
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,017
Yes
5 Oct 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in Ordinary soil within 50mt initial lead & 1.5mt initial lift including rough dressing & breaking of clouds to maximum 5cm to 7cm in size & laying layers not exceeding 0.3mt depth etc. and as per direction of Engeneer I/C | 88.45 | Cum | 171.7 | ₹15,186.87 |
| 2 | E/W excavation for fundation in Hard soil within initial lead of 50mt & initial lift of 1.5mt including dressing the sides and levelling the bed including cost of all labour, sundries, tools and plants etc complete as per direction of Engeneer I/C. | 6.08 | Cum | 276.9 | ₹1,683.55 |
| 3 | Filling in foundation and plinth with filling sand well watered and rammed including cost, conveyance, royality, other taxes including watered & ramming with all leads, lifts and compaction etc. complete in all respect. | 90.74 | Cum | 469.3 | ₹42,584.28 |
| 4 | Supplying all materials, labour, T&P and providing Cement Concrete (1:4:8) using 4 cm size CB metal in F&P including all cost , carriage, royalty taxes of materials etc complete | 68.63 | Cum | 5,345.9 | ₹3,66,889.12 |
| 5 | Supplying all materials, labour, T&P and providing Cement concreete(1:2:4) using 12mm size C.B.G. Chips in F&P including all cost , carriage, royalty taxes of materials etc complete | 4.56 | Cum | 7,366.8 | ₹33,592.61 |
| 6 | Providing and Laying 80mm thick Factory made Cement Concrete interlocking paver Block of M40 grade made by Block making machine with strong vibrator compacting of approved size, design & shape laid in required colour and pattern over compacted bed of coarse sand etc complete in all respect confirming to IRC SP - 63:2018 | 884.5 | Sqm | 706.7 | ₹6,25,076.15 |
| 7 | Centering, shuttering for CC work including false work and dismantling then after casting including all cost of labour, material, conveyance loading unloading taxes etc complete. | 60.8 | Sqm | 248.7 | ₹15,120.96 |
| 8 | Contigency, Transperancy board and other unforseen items | 1 | Nos | 1,561.47 | ₹1,561.47 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.61 MB
BOQ_582570.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .