Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | ₹8.1 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹8.2 LRejected-AOC | ₹8.2 L | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | Sabareesan L2 | Selva Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all type of soils as may be directed except in hard rock requiring blasting and also including refilling the sides of foundations with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead of 10m and lift of 2mts. for ordinary soil, cost including all costs etc., complete as per standard specification. | 1,171.88 | M3 | 250 ₹2.9 L | 246.51 ₹2.9 L |
| 2.00Supply and Delivery of PVC, Pipes and Specials including cost and conveyance of all materials and all Labour charges etc complete complying with Standard specifications. | |||||
| 2.01PVC Pipes | |||||
| 2.02 | 180mm | 30 | RM | 563 ₹16,890 | 561.5 ₹16,845 |
| 2.03 | 140mm | 30 | RM | 345 ₹10,350 | 343 ₹10,290 |
| 2.04 | 110mm | 30 | RM | 198 ₹5,940 | 196.5 ₹5,895 |
| 2.05 | 90mm | 30 | RM | 145 ₹4,350 | 142.25 ₹4,267.50 |
| 2.06 | 180mm PVC Couplers | 30 | No | 288 ₹8,640 | 286.9 ₹8,607 |
| 2.07 | 180mm PVC Tee | 30 | No | 616 ₹18,480 | 614.8 ₹18,444 |
| 2.08 | 180mm PVC Elbow | 30 | No | 558 ₹16,740 | 556 ₹16,680 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
13 Feb 2026, 4:00 pmClosed
Commissioner kumbakonam city Municipal Corporation
Commissioner kumbakonam city Municipal Corporation
Repairs and Maintenance Of Water supply distribution pipe line leak works for ZONE-1 wards from month of January 2026 in Kumbakonam city Municipal Corporation.
2026_MAWS_655848_1
1237/2026/E2
Open Tender
Civil Works
180 days
kumbakonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
30 Mar 2026
13 Feb 2026
13 Feb 2026
13 Feb 2026
13 Feb 2026
13 Feb 2026
Earth work excavation for foundation in all type of soils as may be directed except in hard rock requiring blasting and also including refilling the sides of foundations with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead of 10m and lift of 2mts. for ordinary soil, cost including all costs etc., complete as per standard specification.
Supply and Delivery of PVC, Pipes and Specials including cost and conveyance of all materials and all Labour charges etc complete complying with Standard specifications.
PVC Pipes
180mm PVC Couplers
180mm PVC Tee
180mm PVC Elbow
140mm PVC Couplers
140mm PVC Tee
140mm PVC Elbow
110mm PVC Couplers
110mm PVC Tee
110mm PVC Elbow
90mm PVC Couplers
90mm PVC Tee
90mm PVC Elbow
Supply and delivery of air valve of suitable size with single chamber with its accessories including all labour charges etc., complete.
Supply and delivery of sluice valve of suitable size with its accessories including all labour charges etc., complete.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786461.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_786461.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid