Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -26.51% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.1 L+₹17,056.20 (8.86%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2.1 L+₹17,056.20 (8.86%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-CARD NOT RENEWED |
Tender Value
₹2.6 L
EMD Value
₹13,100
Closing Date
24 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF COVERED DRAIN FROM HAJI GHULAM NABI GANAIE TO GHULAM MOHUDDIN GANAIE AT MACHAMA
2026_RDPR_318826_8
NIT_27_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
S K Pora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹13,100
Yes
14 Sept 2026
31 Jul 2026
25 Aug 2026
31 Jul 2026
24 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by mechnical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:. All kinds of soil | 14.36 | CUM | 479.3 | ₹6,882.75 |
| 0_) | Providing and laying of stone soling hand packed including dressing,filing the interstices including carriages of lead 10km avg' complete job | 6.02 | CUM | 1,265.31 | ₹7,617.17 |
| 0_) | Providing and laying in position cement concrete of specified grade 1:4:8 MIX including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 1.44 | CUM | 5,202.9 | ₹7,492.18 |
| 0_) | Providing and laying in position reinforced cement concrete of specified grade 1:2:4 MIX including curing but excluding the cost of centring and shuttering. All work upto plinth level. Slab | 6.44 | CUM | 7,104.4 | ₹45,752.34 |
| 0_) | Steel reinforcement for RCC work incl. straightning,cutting,bending,placing in position and binding complete | 643.72 | KG | 115.4 | ₹74,285.29 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.55 | CUM | 5,733.6 | ₹83,423.88 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 47.88 | SQM | 286.35 | ₹13,710.44 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Suspended Floors etc. | 15.96 | SQM | 718.2 | ₹11,462.47 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: Sand/Fine Agg. for an average lead of 10 Km | 10.09 | CUM | 279 | ₹2,815.11 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:Coarse Agg./Aggregrate for an average lead of 15 Km | 20.19 | CUM | 344.5 | ₹6,955.46 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1052820.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .