Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
12 Oct 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Rnb Sgr Core
Office of the Executive Engineer Rnb Sgr Core
Construction of CFC-Wool at UNDP, BAMK Nowshera
2026_PWDJK_326741_1
54 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
180 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,600
Executive Engineer Rnb Sgr Core
₹2.0 L
12 Oct 2026
1 Oct 2026
13 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A CFC (40x30ft) | |||||
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations etc. including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : | 149.66 | Cum | 256.85 | ₹38,440.17 |
| 1.02 | Providing and laying of soling stone size on level (hand packed ) watering ramming complete below Foundation & rooms including carriage.
Strip Foundation | 14.97 | Cum | 950 | ₹14,221.5 |
| 1.03 | Providing and Laying GSB filling Under flooring in rooms. including, watering, ramming, consolidating and dressing complete. | 166.43 | Cum | 950 | ₹1,58,108.5 |
| 1.04 | Supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing complete. | 41.61 | Cum | 1,204.5 | ₹50,119.25 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) M-7.5 PCC below Foundation & Rooms - Mudmat including carriage. | 51.64 | Cum | 5,202.9 | ₹2,68,677.76 |
| 1.06 | Providing and laying in position specified grades of reinforced cement concrete M-25 grade in beams, slabs, walls(any thickness) including attached pillasters, buttresses, plinth and string courses, filets, columns, , stairs,pillars, piers, abutments, posts and struts etc. using 20mm thick crushed stone agg. Excluding the cost of centring, shuttering, finishing and reinforcement. All work upto plinth level. | 47.36 | Cum | 8,021.1 | ₹3,79,879.3 |
| 1.07 | All work above plinth level. | 13.01 | Cum | 9,412.05 | ₹1,22,450.77 |
| 1.08 | Reinforcement for RCC works including straightening, cutting, bending, binding & placing in position all complete. HYSD reinforcement of grade Fe-500D steel bars at all levels. | 7,244.4 | Kg | 123.2 | ₹8,92,510.08 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form work for:-
Foundations, footings, bases for columns | 55.19 | Sqm | 286.35 | ₹15,803.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_1105276.xls
BOQ • 0.34 MB
date.pdf
PDF • 0.67 MB
nit.pdf
PDF • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .