Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
19 Jun 2026, 3:00 pmClosed
Ajni - Construction of Pit line at Coach Care Complex Ajni beside Pit No. 02.
DRMWNGP-62-2026-01~CR
DRMWNGP-62-2026-01
Open
Works - General
8 Months
Nagpur, Maharashtra
₹0
₹10.6 L
19 Jun 2026
29 May 2026
5 Jun 2026
01-Part-(01)- Proposal for Construction of 4 tier Pit line for inspection of Above/
02-Part-(02)(A) - P. Way - Ajni-Construction of 4 tier pit line for
03-Part-(02)(B) - Supply of Ballast - Ajni-Construction of 4 tier pit line for
04-Part-(02)(C) - Earthwork - Ajni-Construction of 4 tier pit line for
05-Part-(02)(D) - Welding - Ajni-Construction of 4 tier pit line for
06-Part-(02)(E) - Non P.Way Item - Ajni-Construction of 4 tier pit line for
trainset at Coach Care Complex Ajni beside pit no 2 under ADEN(HQ)NGP Subdivision.
Item- 01 MS ITEMS (DSR-2023 ITEMS)
S No. Item Description of Item Unit Qty Rate Amount
1.0 CARRIAGE OF MATERIALS
By Mechanical Transport including loading,
unloading and stacking
1.1.18 Disposal of moorum/building rubbish/ malba/ cum 4700 494.1 2322270
similar unserviceable, dismantled or waste
material by mechanical transport including
1 loading, transporting, unloading to approved
municipal dumping ground for lead upto 10 km
for all lifts, complete as per directions of
Engineer-in-charge.
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means in
foundation trenches or drains (not exceeding
1.5 m in width or 10 sqm on plan), including
dressing of sides and ramming of bottoms, for
all lift, including getting out the excavated soil
and disposal of surplus excavated soil as
directed, within a lead of 50 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the cost
of centering and shuttering - All work up to
4.1.5A 1:3:6 (1 Cement : 3 manufactured sand derived cum 250 6347.75 1586937.5
from Recycled Concrete Aggregate (RCA) : 6
graded stone aggregate 20 mm nominal size
Recycled Concrete Aggregate (RCA) )
5.0 REINFORCEMENT CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including strutting,
propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. Sqm 450 392.15 176467.5
for mass concrete
5.9.2 Walls (any thickness) including attached Sqm 2000 842.5 1685000
5 pilasters, buttresses, plinth and string courses
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
5.9.5 Lintels, beams, plinth beams, girders, Sqm 1000 736.4 736400
bressummers and cantilevers
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in
position and binding all complete upto plinth
5.22.6 Thermo-Mechanically Treated bars of grade Fe- Kg 221500 107.85 23888775
5.33S DESIGN MIX CONCRETE
Providing and laying in position ready mixed or
site batched design mix cement concrete for
reinforced cement concrete work; using coarse
aggregate and fine aggregate derived from
natural sources, Portland Pozzolana / Ordinary
Portland /Portland Slag cement, admixtures in
recommended proportions as per IS: 9103 to
5.33 accelerate / retard setting of concrete, to
improve durability and workability without
impairing strength; including pumping of
concrete to site of laying, curing, carriage for all
leads; but excluding the cost of centering,
shuttering, finishing and reinforcement as per
direction of the engineer-in-charge, for the
following grades of concrete.:
5.33.1 All works upto plinth level
5.33.1.1 Concrete of M25 grade with minimum cement cum 1300 9504.75 12356175
content of 330 kg /cum
5.33.1.2 Concrete of M30 grade with minimum cement cum 1500 9655.7 14483550
content of 350 kg /cum
10.0 STEEL WORK
10.1S General
10.2 Structural steel work riveted, bolted or welded Kg 5000 133.7 668500
in built up sections, trusses and framed work,
10 including cutting, hoisting, fixing in position and
applying a priming coat of approved steel
primer all complete.
15.0 DISMANTLING AND DEMOLISHING
15.1S General
Demolishing cement concrete manually/ by
mechanical means including disposal of
material within 50 metres lead as per direction
of Engineer - in - charge.
15.2.1 Nominal concrete 1:3:6 or richer mix (including cum 300 2434.25 730275
equivalent design mix)
Dismantling C.I. pipes including excavation and
refilling trenches after taking out the pipes,
manually/ by mechanical means breaking lead
15.45 caulked joints, melting of lead and making into
blocks including stacking of pipes & lead at site
within 50 metre lead as per direction of
Engineer-in-charge:
16.0 ROAD WORK
16.49S MISCELLANEOUS
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Construction of granular sub-base by providing
close graded Material conforming to
specifications, mixing in a mechanical mix plant
at OMC, carriage of mixed material by tippers to
work site, for all leads & lifts, spreading in
uniform layers of specified thickness with motor
grader on prepared surface and compacting
with vibratory power roller to achieve the
desired density, complete as per specifications
and directions of Engineer-in-Charge.
16.78.1 With material conforming to Grade-I (size range cum 700 2784 1948800
75 mm to 0.075 mm) having CBR Value-30
18.0 WATER SUPPLY
18.7S C.P.V.C. PIPES
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes, having thermal stability
for hot & cold water supply, and all CPVC plain
& brass threaded fittings, including fixing the
18.7 pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one
step CPVC solvent cement and testing of joints
complete as per direction of Engineer in Charge.
( Internal work - Exposed on wall )
18.59S AIR VALVE & WATER METER (BULK TYPE)
Providing and laying S&S Centrifugally Cast
18.72 (Spun) / Ductile Iron Pipes conforming to IS :
Schedule 02-Part-(02)(A) - P. Way - Ajni-Construction of 4 tier pit line for inspection of Vande Bharat
trainset at Coach Care Complex Ajni Beside pit no. 2.
Item- 01 MS ITEMS (USSOR-2021 ITEMS)
S No. Item Description of Item Unit Qty Rate Amount
Providing and laying in position Plain cement
concrete of specified Nominal Mix for
miscellaneous works like side drains, foundation
for OHE masts and other miscellaneous
structures excluding the cost of Cement,
centering and shuttering - All work up to plinth
graded stone aggregate 20 mm nominal size)
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Laying and linking all types of turnouts,
diamond crossings and Derailing switches with
52Kg / 60Kg rail section on PSC sleepers on
ballast bed, prepared after dismantling &
removal of existing turnout/normal line during
TTR/yard remodeling under traffic block, as per
standard drawing, duly leading sleepers, rails,
switches, crossings, fastenings including rail
cutting, drilling, fixing of all components,
fittings with housing of tongue rails as per
requirement of signaling, preparing ballast bed,
filling and spreading of ballast as required,
linking of turnout with track, attending track
parameters including lifting, providing one
round of packing to make track fit for 20 kmph
speed including lubrication of fittings/fastening,
complete as directed by Engineer in-charge.
Note: Payment for dismantling & removal of
existing turnout/normal line,
transportation/stacking of released material and
preparing of ballast bed is not included in this
item and shall be paid under relevant item.
Lifting the newly inserted BG 60 Kg. / 52 Kg.
turnouts/ trap switches to required level to
provide full ballast cushion as per approved
drawings after initial laying with Railway's stone
ballast in convenient stages including one round
of through packing after completion of final
stage of lift, levelling, aligning, gauging and
boxing to standard profile to make it fit for 20
kmph with all lead and lifts, complete in all
respect and as directed by the Engineer-in-
charge. Note: 1. The item shall be used only
when UNIMAT is not available for the work
before the turnout is opened for operation. 2.
Leading and dumping of ballast will be paid
separately under relevant item.
4 083010 Lifting and packing for regrading the existing TRM 100.00 185.83 18583.00
PSC sleeper track to required height / level in
stages not exceeding 75mm or part thereof at a
time, providing permissible ramp for the track,
insertion of moorum / sand / stone ballast
uniformly under the existing track and placing
the same to safe approved gradient, gauge,
cushion including levelling and one round of
through packing to allow train movement at
restricted speed of 30 kmph for a specified
length with all leads & lifts and fixing, marking,
painting rail level pegs at every 30m interval.
Note: Lifting of track shall be done in stages as
per procedure prescribed in latest edition of
IRPWM to get the proposed final level as per
approved working profile, as directed by
Engineer in-charge.
5 083011 Extra for additional lift over 75mm for every TRM 100.00 28.79 2879.00
50mm lift or part thereof up to 275mm for item
nos. 083010 for each TRM.
6 083030 Boxing and profiling of ballast as per procedure TRM 100.00 27.33 2733.00
prescribed in latest edition of IRPWM including
cess dressing on both sides of track. The work
will include removing excess ballast from track
and putting the same in crib and shoulder by
leading to a maximum of 50m including
crossing of track, deweeding on ballast section
etc and as directed by Engineer-In charge.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Unloading of ballast from Railway's Hopper
Wagons, quantity distribution as per pre-
defined site requirement, clearing
infringements/jammed ballast, distributing the
unloaded ballast uniformly over the track,
profiling and boxing following all prescribed
Shifting & pairing of rails / panels unloaded
alongside existing running track to adjoining
formation of a new line including crossing of
one track, duly lifting & pushing rail / panel
without damaging it and taking all necessary
precautions, so as not to infringe the running
track, as directed by Engineer in-charge. Note:
The rail barricading, if disturbed during working,
should be restored to its original condition by
the agency including re-fixing & concreting as
8 122012 Rail length up to 13m - Under Conditions not RM 1400.00 16.86 23604.00
requiring Traffic Block
Providing Centre Line / Rail Level, reference
Pegs on formation at an interval of 30 metres
on one side or at centre of proposed / existing
track, as directed by engineer in-charge for
linking of new track / CTR / Deep Screening /
Lifting / Lowering works, duly embedding in
formation including marking with contractor's
paint. Note: (1) Rails/tie bar of suitable size bar
shall be supplied by the Railways from nearest
Stores Depot. In case of hard wood peg, the
hard wood will be supplied by the contractor.
(2) Excavation and concrete work, if required,
will be paid separately.
10 123020 Installation of reference points for track centre Each 26.00 587.58 15277.08
line in main and loop lines, in straight or curve
portion, SRJ for turnouts, heel of crossing (HOC),
locations of derailing switches, switch
expansion joints etc. away from formation on
firm ground at known offset with MS Angles of
50mmx50mmx5mm thick of length 1.80 m
each, founded in concrete block of size 30cm x
30cm x 45cm of nominal mix 1:3:6, including
painting to reference pegs with two coats of
enamel paints on exposed surface, as directed
by Engineer In charge. Note: Earth work and
Cement concrete will be paid under relevant
11 123030 Spreading of ballast, from existing stacks cum 500.00 38.64 19320.00
available along formation on top or at cess, in
required uniform thickness, compaction of
ballast layer laid on new formation at all the
locations with smooth wheeled power roller of
8-10 tonne capacity to sufficient number of
passes to form consolidated ballast bed of
approximately 250mm thickness to a width of
4m symmetrical to centre line of proposed track
in correct line & level with all ascents &
descents, as directed by Engineer in-charge.
Note: Item is inclusive of (a) providing ramp for
taking roller to formation and removing the
same & making good formation after
completion of work; (b) redistribution & leveling
of excess ballast while rolling to obtain uniform
plane cambered surface.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Linking of BG track (except at LC, Bridges and
SEJs) with any type of rail section and sleeper of
specified density, on ballast bed spread and
compacted with suitable roller, over prepared
formation including leading free rails/welded
panels available along the alignment on to
formation, leading and spreading all fittings and
fastenings, spreading of sleepers at specified
spacing, squaring, placing of rails over sleepers
and fixing rails to sleepers with all types of
fittings and fastenings to correct gauge &
alignment, lubrication of fittings and fastenings
with contractor's grease as per IRPWM
standards with contractors labour, tools,
consumables, with all lead, lifts etc. complete
and raising, levelling and initial packing of track
to make it fit for 30 kmph and meet other
prerequisites prescribed in Indian Railway Track
Machine Manual for deployment of Tamping
Machine. Note: 1.Rail cutting and Hole drilling
shall be paid separately. 2.Spreading of ballast
and compaction shall be paid separately under
12 123042 For sleeper density of 1540 sleepers per km TRM 100.00 264.90 26490.00
13 123080 Carrying out cut & connection to the existing Each 1.00 66252.85 66252.85
PSC sleeper track under line block of any rail
section and sleeper density to connect the
same to newly linked track which is laid by the
side, duly carrying out cutting of rails, insertion
of additional PSC sleepers, if required, providing
fish plated joints including drilling of holes,
slewing required length of both tracks to
prescribed alignment, adjusting sleeper
spacing, providing continuity to track, spreading
of ballast to provide cushion, shoulder ballast to
the track stretch, giving one round of initial
packing to make track fit for 20 kmph speed
and boxing of ballast to profile as directed by
Engineer in charge.
14 123110 Fixing all types of free rails / rail panels over pit TRM 600.00 150.13 90078.00
line for BG track with inserts, elastic rail clips,
MS liners and grooved rubber pads below rail to
correct spacing, gauge, alignment and level
with above fittings & fastenings in position, duly
providing full complements of rail fittings.
Required nos. of inserts per bearing shall be
fixed at the time of concreting bed block over
pit wall to correct spacing, centre to centre,
alignment & levels as per IR's approved
Through packing of track, as per procedure
prescribed in latest edition of Indian Railways
Permanent Way Manual
15 131011 For PSC sleeper Track with Sleeper Density of TRM 100.00 108.42 10842.00
1540 Sleepers/Km or more
Picking up of slacks in track of all sleeper
density, duly opening up ballast, gauging,
alignment, correcting longitudinal & cross
levels, packing, boxing of ballast and dressing
the same under traffic conditions as per
procedure prescribed in latest edition of IRPWM
and as directed by Engineer in-charge. Note: In-
charge section Engineer should identify
locations requiring packing and obtain prior
approval of DEN/XEN before execution of the
work when there is no Zonal Track Maintenance
agency deployed in the section.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
First or Second Through Packing of track of all
sleeper density including giving a general lift,
as desired to eliminate sag after Deep
Screening work, lifting of track, lowering of
track and major realignment of curves and
formation rehabilitation as per procedure
prescribed in latest edition of IRPWM. Note:
General lift is normally 25 mm and isolated lift
may be up to 50 mm.
17 131031 For PSC Sleeper Track with Sleeper Density of TRM 100.00 130.11 13011.00
Through packing of points and crossings,
derailing switches including gauging, fittings
recoupment, ballasting as required, elimination
of sag and to the required alignment after Deep
Screening as per procedure prescribed in latest
edition of IRPWM complete as per direction of
Engineer-in-charge. Note: This work shall be
operated in exceptional cases with written
approval at DEN level when UNIMAT is not
available and immediate packing is required to
pass train over it.
Maintenance of track on main line & loops,
Points & crossings etc. including special
attention to section for carrying out various
maintenance works listed in Indian Railways
P.Way Manual / Bridge Manual for safe running
of goods and passenger trains with contractor's
tools / labours etc. complete, as directed by
Engineer in-charge. Note: Contractor shall
arrange one gang at any point of time
comprising of minimum specified labours with
sufficient experience in P.Way working.
19 136041 One mobile Gang comprising of 15 physically fit Gang 60.00 14333.53 860011.80
labours plus 1 Mate. Note: (1) In case, Day
contractor provides less no. of Labour/Mate or
for non availability of vehicle, payment will be
d e d u c t e d for each such person or non-
availability of vehicle @ 20% of the accepted
item rate, separately for each shortfall. (2) The
Contractor shall keep one pick up Truck of
minimum 1.5T payload capacity with Driver all
the time and all expenditures for running at an
average of 80 kms per day shall be born by the
Anti-corrosive painting of rail outside track on
rail bottom, web, foot and fishing plane with two
coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation, as
a complete job as per procedure prescribed in
latest edition of IRPWM.
Marking, inscribing, painting, writing, bordering
etc. on new / old iron surface at various
locations of Points & Crossings with details of
turn-in / turn-out reference station mark on rail
web for one set, duly preparing surface with
contractor's wire brush and applying two coats
of yellow synthetic enamel paint of approved
quality as background and stenciling the details
to suitable size, as described for every curve
reference station mark / switch / crossing
details with black enamel paint of approved
quality complete, as directed : Note: Stenciling
of letters is only permitted. No hand written
letters are accepted.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete as
directed by Engineer in-charge. Abrasive Rail
Cutter will be as per RDSO Specification No.
TM/SM/1 (Rev. 01 of 2012) with latest status of
RDSO; Rail Cutting Wheel Abrasive Disc will be
as per RDSO Specification No.TM/SM/2 (Rev. 01
Drilling holes of 16 mm to 32 mm dia. with Rail
Drilling machine including chamfering with
appropriate chamfering tools in all types of rail
section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
24 161050 Drilling holes of specified size for bond holes Each 32.00 36.27 1160.64
with 7.2mm dia drill twist to correct spacing and
location on 60kg/52kg rails on cess or under
traffic block with contractor's tools and plant,
equipment, consumable, labour etc complete as
directed by the Engineer in charge at site.
25 162010 Sleeper Spacing, Re-spacing / Squaring of Each 280.00 71.85 20118.00
sleeper by Hydraulic Sleeper Spacer with
contractor's tools & plants, equipment,
consumable with all lead & lift etc. complete, as
directed by Engineer in-charge. Hydraulic
Sleeper Spacer shall be as per RDSO's
Specification No. TM/SM/17, dated 31.03.1992.
Loading of rails of any section and length up to
13 metres in Wagons / Truck / trailer including
lead up to 50 metres and lift up to 5 metres.
26 171011 In wagons during period of traffic block where MT 84.00 296.69 24921.96
handling by mechanical means is not possible
Loading of tongue rail, stock rail, switch
assembly and crossings of any section and
length, SEJ, Glued joint etc. with / without P.Way
fittings and fastenings, in Wagon / Truck / trailer
including lead up to 250 metre and lift up to 5
27 171024 I n Wagon where mechanical handling is MT 6.00 117.10 702.60
possible and traffic block is not required or in
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway usage
from departmental material train (DMT) or
contractor's / Railway's Truck/trailer including
lead up to 50 metre, lift up to 5 metre and
stacking in prescribed manner.
28 171053 From Wagon where mechanical handling is MT 90.00 87.44 7869.60
possible and traffic block is not required or in
Truck / trailer.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Loading of 52kg / 60kg PSC normal line and
special sleepers up to 2.75 metre length in
Depot / Station / Mid-section between stations in
a neat manner to departmental material train
(DMT) or contractor's / Railway's Truck/Trailer
with crane or any other means including
crossing of one track with free lead up to 250
metre and lift up to 5 metre, if required with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any damage
to sleeper during loading, penalty @ 50% of the
all inclusive cost of sleeper shall be levied.
29 172014 I n Wagon where mechanical handling is MT 98.00 89.70 8790.60
possible and traffic block is not required or in
Truck / trailer
Loading of 52kg / 60kg PSC line and special
sleepers beyond 2.75 metre length including
existing fittings and fastenings in Depot /
Station / Mid-section between stations in a neat
manner to departmental material train (DMT) or
contractor's / Railway's Truck/trailer with crane
or any other means including crossing of one
track with free lead up to 250 metre and lift up
to 5 metre, if required with contractor's labour,
tools & plants, machinery, consumables etc.
Note: In case of any damage to sleeper during
loading, penalty @ 50% of the all inclusive cost
of sleeper shall be levied.
30 172024 I n Wagon/Truck / trailer where mechanical MT 32.00 116.66 3733.12
handling is possible a n d traffic block is not
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
m a t e r i a l except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall be
the shortest motorable road length between the
points of loading and unloading.
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1 . Lead shall
be the shortest motorable road length between
the points of loading and unloading. 2. Loading
and unloading shall be paid extra under
relevant items.
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery, consumables
etc . Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Unloading of 52kg / 60kg PSC special sleepers
beyond 2.75 metre length in Depot / Station /
Mid-section between stations in neat manner
for Railway usage from departmental material
train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
50 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery, consumables
etc. Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
35 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 200.00 752.64 150528.00
minimum 1.10 cum bucket capacity
36 211202 Hydra or similar tyre mounted Pick-n-Carry Hour 200.00 889.42 177884.00
crane of 12T capacity for misc. works of
handling of material
37 211203 Tractor with Trolley for local transportation or Hour 100.00 199.17 19917.00
other misc. works.
38 211250 Manufacturing and fixing buffer stop with Each 1.00 15481.58 15481.58
Railway supplied rails, cutting, including
bending of rails as per plan ,with all contractor's
labour, materials, tools, plants etc. and all lead
and lift including crossing of track where
necessary and as directed by Engineer in
charge at site. Note: Excavation, fixing rails in
cement concrete, drilling of holes will be paid
Schedule 03-Part-(02)(B) - Supply of Ballast - Ajni-Construction of 4 tier pit line for inspection of
Vande Bharat trainset at Coach Care Complex Ajni Beside pit no. 2.
Item- 01 MS ITEM (USSOR 2021 ITEM)
S No. Item Description of Item Unit Qty Rate Amount
Manufacturing, supply and stacking of machine
crushed Track Ballast conforming to RDSO
Specification (IRS-GE-1) with latest correction
slips at Railway depot or nominated location.
Note: Distance of nearest quarry mentioned in
each sub-item is only for the purpose of
selecting the items for preparation of
estimates/tender schedule, based on the
minimum distance between nearest quarry and
centre of supply points and will not affect the
selection of quarry during physical supply in
any way till prescribed specification is met fully.
1 085011 When distance of nearest quarry is up to 10 km cum 500.00 831.46 415730.00
Schedule 04-Part-(02)(C) - Earthwork - Ajni-Construction of 4 tier pit line for inspection of Vande
Bharat trainset at Coach Care Complex Ajni Beside pit no. 2
Item- 01 MS ITEM (USSOR 2021 ITEM)
S No. Item Description of Item Unit Qty Rate Amount
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Earthwork in filling in embankment, guide
bunds, around buried type abutments, bridge
gaps, trolley refuges, platforms etc. with
contractor's own earth conforming to Soil
Quality Class SQ1/SQ2/SQ3, after preparation of
foundations as applicable, benching in existing
banks wherever required, spreading in layers
with motor grader, bringing the moisture
content to OMC, mechanical compaction to
specified density and dressing of bank to final
profile as per RDSO Specifications:
RDSO/2020/GE: IRS-0004 with latest correction
s l i p s . Note: 1) Foundation preparation,
Benching including additional earthwork on
account of this, wherever required, shall be paid
extra under relevant schedule item for
benching. 2) Payment for Earthwork under this
item shall be made based on the cross section
measurements calculated (i) with original
ground profile of existing bank based on initial
ground levels before doing benching and (ii)
final profile of the bank worked out with final
levels as per prevailing guidelines.
Schedule 05-Part-(02)(D) - Welding - Ajni-Construction of 4 tier pit line for inspection of Vande
Bharat trainset at Coach Care Complex Ajni Beside pit no. 2
Item- 01 MS ITEM (USSOR-2021 ITEM)
S No. Item Description of Item Unit Qty Rate Amount
25mm gap Cess Welding with Railway's welding
portion and finishing of weld to meet the
prescribed tolerances and pass all stipulated
tests with Contractor's labour, materials,
consumables, tools, equipments etc. to
complete the work in all respect as per IR's
"Manual for Fusion Welding of Rails by Alumino
- Thermic Process" with latest correction slips,
including all required handling and rehandling
of rails, marking of welded joint, painting weld
collar with anticorrosive paint, as directed by
Engineer in charge. Note: 1 . Only welding
portion and related accessories as per
Annexure - I shall be supplied by Railways. 2.
Welding shall be carried out only by trained
welder having valid competency certificate. 3.
Hydraulic Weld trimmer shall be used for
chipping and profile Grinder for finishing.
crucible fitted with Automatic Tapping Thimble,
3 pieces Mould (Zircon washed) and
Compressed Air Petrol/LPG pre heating
Schedule 06-Part-(02)(E) - Non P.Way Item - Ajni-Construction of 4 tier pit line for inspection of
Vande Bharat trainset at Coach Care Complex Ajni Beside pit no. 2
Item- 01 NS ITEM (USSOR-2011 Item No 274110)
S No. Item Description of Item Unit Qty Rate Amount
1 01 Removing stacked & demarcated muck debris cum 1000.00 139.84 139840.00
etc. from various locations in track areas
between platforms, yards along the track in
section etc. and disposing off the same beyond
railway land as per the local corporation/council
rules. The rate includes all lead, lift etc.
complete and levelling the area after removal.
NAGPUR CR DIVISION-ENGINEERING/CENTRAL RLY
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .