Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -15.00% | ₹2.2 L | L1 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,260
Closing Date
11 Aug 2026, 6:00 pmClosed
EE PHED City Div IV (S) Jaipur
EE PHED City Div IV (S) Jaipur
Operation and maintenance of WSS of Govindpura-Sitapura Sub Div II(S) under jurisdiction of city div IV (S) PHED Jaipur for 6 Month
2026_PHCJA_581958_1
NIT-14/2026-27
Open Tender
Repair and Maintenance Works
Percentage
180 days
EE PHED City Div IV (S) Jaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE PHED City Div IV (S) Jaipur DDO Code 32164
₹5,260
Yes
17 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters,cable, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. | - | - | - | - |
| 2 | 0.5 HP to 5.0 HP ( 5 no. For 6 months) | - | Each | 1,736 | - |
| 3 | 6.0 HP to 7.5 HP (4 no. for 6 months | - | Each | 2,003 | - |
| 4 | Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor) | - | - | - | - |
| 5 | 80-300mm ( 14 no for 6 months ) | - | Each | 1,200 | - |
| 6 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department. (13.5km)
1 km to 50 km - one fitter-II & one beldar | - | PER KM PER MONTH | 787 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
TD14.pdf
Tender Documents • 3.14 MB
BOQ_1033982.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .