Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-Finance | ₹5.4 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L1₹5.4 LAccepted-Finance | ₹5.4 L | L1 | Accepted-Finance 1st Lowest |
| 3 | L1₹5.4 LAccepted-Finance | ₹5.4 L | L1 | Accepted-Finance 1st Lowest |
| 4 | L1₹5.4 LAccepted-Finance AT WARD NO 04 PO DHENKANAL PS DHENKANAL TOWN DISTRICT DHENKANAL | DHENKANAL | DHENKANAL | ₹5.4 L | L1 | Accepted-Finance 1st Lowest |
| 5 | L1₹5.4 LAccepted-Finance | ₹5.4 L | L1 | Accepted-Finance 1st Lowest |
Tender Value
₹5.4 L
EMD Value
₹6,000
Closing Date
21 May 2026, 5:00 pmClosed
SE Dhenkanal R and B Division
SE Dhenkanal R and B Division
Construction of two disabled-friendly toilet and ramp for PWD students (Female) at Dhenkanal Mahila Mahavidyalaya College, Dhenkanal
2026_EICCL_128892_2
SE DKL (R and B) 05/2026-27
Open Tender
Civil Works - Buildings
60 days
Dhenkanal
Please refer tender documents
2 documents required · 2 mandatory
₹4,000
₹6,000
Yes
3 Jun 2026
7 May 2026
22 May 2026
7 May 2026
21 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in HARD soil up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site with all leads and lifts, T&P labour required for the work etc. complete as directed by the Engineer-In Charge. | 19.88 | One Cum | 276.89 | ₹5,504.57 |
| 2 | Supplying and filling in foundation and plinth with sand including well watering, ramming, including cost, conveyance and royalities of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge. | 6.32 | One Cum | 658.36 | ₹4,160.84 |
| 3 | Cement concrete (1:4:8) in foundation and plinth using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying concrete in layers not exceeding 0.15 M. in depth including compacting watering and curing etc, complete including cost ,conveyance, royalities & of all materials and cost of labour etc with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge. | 2.47 | One Cum | 5,751.02 | ₹14,205.02 |
| 4RCC work M-20 having a minimum compressive strength 200kgs/cm2 in 15cm.cubes at 28 days after mixing and tests conducted in accordance with IS.456 and IS.516 using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator watering and curing for 28 days centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalities & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.(but excluding cost of M.S Rod or Tor Steel & binding wires) | |||||
| 4.1 | Foundation Raft | 2.3 | One Cum | 6,529.13 | ₹15,017 |
| 4.2 | Plinth beam | 1.21 | One Cum | 7,399.48 | ₹8,953.37 |
| 4.3 | Coloum & Roof beam | 4.75 | One Cum | 15,792.04 | ₹75,012.19 |
| 4.4 | Roof slab | 1.67 | One Cum | 13,777.08 | ₹23,007.72 |
| 4.5 | Lintel | 0.36 | One Cum | 14,192.48 | ₹5,109.29 |
| 4.6 | Chajja | 1.35 | One Sqm | 1,229.22 | ₹1,659.45 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_589959.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
DTCN_Womens_College.pdf
Tender Documents • 0.77 MB
BOQ_589959.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid