| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹2.7 LRejected-AOC 1 RAKSHA PUNAVALI ROAD JHANSI JHANSI UTTAR PRADESH 284419 UDYAM UP 39 0038072 | JHANSI | UTTAR PRADESH | 284419 | ₹2.7 L | L2 | Rejected-AOC IInd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S New Sharma Electricals L1 | B.R. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Sorting, counting, stacking mark wise and proper loading of structure approx 08 MT in Pick up at EFU Naini, Prayagraj | 7.98 | MT | 990 ₹7,900.20 | 1,100 ₹8,778 |
| 2.00 | Safe carriage of loaded structure parts EFU Naini to 220 KV S/S Rewa Road. Prayagraj (approx. 16 Km.) including all charges of way & vehicle | 1 | Job | 14,990 ₹14,990 | 17,000 ₹17,000 |
| 3.00 | Unloading of auxiliary structure approx. 08 MT from the truck/trailer, its sorting, counting and proper stacking in the premises of 220 KV S/S Rewa Road Prayagraj as per direction of Superivising Engineer. | 7.98 | MT | 990 ₹7,900.20 | 1,000 ₹7,980 |
| 4.00 | Erection of Main & Auxiliary(ALP,ABL,EKR,BBR,CCR, CGR,CPR, TMR, YMR, APR etc) structure , for new 33 KV Jal Nigam feeder at 220 Kv S/S Rewa Road Prayagraj including material shifting from store to yard. All materials to be erected shall be supplied by UPPTCL free of cost but all men, material & T&P required for satisfactrily completion of work shall be arranged by the contractor at his own cost. | 7.98 | MT | 2,980 ₹23,780.40 | 3,000 ₹23,940 |
| 5.00 | Dismanling of main and auxiliary structure at 33kv side of Railway bay including shifting of dismanteled material from work site to Substation store including weight of above material by Dharam kata including all cost of man and T &P ,vehicle Provided by contractor at his own cost. | 2.5 | MT | 2,190 ₹5,475 | 3,000 ₹7,500 |
| 6.00Erection of following equipment as per instruction manual of various equipments & technical specification including shifting of equipment from store to site including all other associated work to complete the job satisfactorily. | |||||
| 6.01 | 33 KV LSI/BSI | 3 | No. | 4,290 ₹12,870 | 5,000 ₹15,000 |
| 6.02 | 36 KV VCB With Structure | 1 | No. | 4,890 ₹4,890 | 5,000 ₹5,000 |
| 6.03 | 36 KV CT | 3 | No. | 1,790 ₹5,370 | 2,000 ₹6,000 |
| 6.04 | 36 KV CT/PT Junction box | 2 | No. | 590 ₹1,180 | 600 ₹1,200 |
Tender Value
₹2.5 L
EMD Value
₹3,000
Closing Date
11 Oct 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
Construction of New 33 KV Bay under Jal Jivan Mission at 220 KV S/S Rewa Road, under ETD-II, Prayagraj
2025_UPTCL_1080006_1
38/ETC-II(P)/2025-2026
Open Tender
Electrical Works
60 days
220 KV S/S REWA ROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹3,000
10 Feb 2026
6 Oct 2025
13 Oct 2025
6 Oct 2025
11 Oct 2025
6 Oct 2025
Amount
Sorting, counting, stacking mark wise and proper loading of structure approx 08 MT in Pick up at EFU Naini, Prayagraj
Safe carriage of loaded structure parts EFU Naini to 220 KV S/S Rewa Road. Prayagraj (approx. 16 Km.) including all charges of way & vehicle
Unloading of auxiliary structure approx. 08 MT from the truck/trailer, its sorting, counting and proper stacking in the premises of 220 KV S/S Rewa Road Prayagraj as per direction of Superivising Engineer.
Erection of Main & Auxiliary(ALP,ABL,EKR,BBR,CCR, CGR,CPR, TMR, YMR, APR etc) structure , for new 33 KV Jal Nigam feeder at 220 Kv S/S Rewa Road Prayagraj including material shifting from store to yard. All materials to be erected shall be supplied by UPPTCL free of cost but all men, material & T&P required for satisfactrily completion of work shall be arranged by the contractor at his own cost.
Dismanling of main and auxiliary structure at 33kv side of Railway bay including shifting of dismanteled material from work site to Substation store including weight of above material by Dharam kata including all cost of man and T &P ,vehicle Provided by contractor at his own cost.
Erection of following equipment as per instruction manual of various equipments & technical specification including shifting of equipment from store to site including all other associated work to complete the job satisfactorily.
33 KV LSI/BSI
36 KV VCB With Structure
36 KV CT/PT Junction box
Earthing of structure and equipment by using 50x6 mm MS Flat and painting with BUS green color by two coat. MS flat will be provided by the department.
Laying of following size of control cable in the cable trench from C&R panel to 33KV equipment/ JB etc in switchyard as per cable schedule including carriage of cable drums from store to laying site and Shfting back to store and all other associated work to complete the job satisfactorily as per technical specification.
2CX2.5 sqmm 1.1KV FRLS unarmmered copper contol cable
4CX2.5 sqmm 1.1KV FRLS unarmmered copper contol cable
6CX2.5 sqmm 1.1KV FRLS unarmmered copper contol cable
Termination of following size of control cable as laid above as per cable schedule , including making necessary holes in gland plate of box wherever required, supply and fixing of cable glands, ferrules of appropriate size and no. respectively for each core of cable and its termination with crimping type lugs of Dowell/Tension and all other associated work to complete the job satisfactorily as per technical specification.
2CX2.5 sqmm 1.1KV FRLS unarmmered copper contol cable
4CX2.5 sqmm 1.1KV FRLS unarmmered copper contol cable
6CX2.5 sqmm 1.1KV FRLS unarmmered copper contol cable
Jumpering of panther/moose conductor from Bus bar to Bus isolator ,Bus isolator to breaker, breaker to PT, PT to CT ,CT to Line Isolator, Line Isolator to Transfer Bus isolator, Transfer Bus isolator to Transfer Bus Bar of 33KV Feeder Including cutting,bending & proper tightening with clamp
Providing & fixing of 150 watt LED Lumination for flood light make-Bajaj/Havells/Philips.
Dismantling of All Jumpers of ACSR Moose/panther Conductor from 33 KV Bus Bar to Bus Isolators / PT /CT/Line Isolator and all other associated jumpers.
Dismantling of exiting 33 KV Bus bar of Moose Conductor along with tension fittings and Disc insulators including shifting and proper stacking of dismantled material in the store of 220 KV S/S rewa road, Prayagraj (Span 12/06 Mtr .)
Stringing of 33KV BUS-A(all phase) & 33KV BUS - B (all phase) of Moose conductor and tightening with gantry along with hoisting insulator and fixing of all hordware and fitting, (Span 06/12Mtr.).
Installation of new 3P4W Interface Energy Meter (ABT) 0.2S Class
Installation of Data concentrator(DCU)/Communication Gateway(IG)
Installation & commissioning of Common Metering cubicle for Meter, DCU, switch for 2IEM
Integration of 01 no 33KV New 33 KV Bay under Jal Jivan Mission Karykram-4 in existing RTU at 220KV Substation rewa road (with material i.e. MFT, CMR, DI Cable, Connectors, CT & PTTerminal Blocks with required interface cable.
B.R. ENTERPRISES (BID ID -5600206)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid