| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC AT WARD NO 43 PO NAYABAZAR DIST CUTTACK PIN 753004 | CUTTACK | CUTTACK | ODISHA | 753004 | ₹23.3 L | L1 | Accepted-AOC Accepted |
| 2 | L1₹23.3 LRejected-AOC AT SANA MUNDALI P O MUNDALI COLONY P S BARANGA DIST CUTTACK PIN 754006 | CUTTACK | CUTTACK | ODISHA | 754006 | ₹23.3 L | L1 | Rejected-AOC Rejected |
| 3 | L2₹23.3 LSame as L1Rejected-AOC | ₹23.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹23.3 LSame as L1Rejected-AOC | ₹23.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹23.3 LSame as L1Rejected-AOC | ₹23.3 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹23.3 L
EMD Value
₹23,400
Closing Date
12 Jun 2026, 5:00 pmClosed
Executive Engineer, CD-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of RCC drain with cover slab from Swarna Das res to main drain at Malgodown Dasa sahi and Piligrim road Dasa sahi at Balisahi basti in Ward No.51.
2026_ORULB_128796_3
MC(CMC)CTC_Div-IIINo9/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹23,400
Yes
15 Sept 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. | - | Cum | 299.52 | - |
| 2 | Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting / ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge. | - | CUM | 612.7 | - |
| 3 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete . | - | CUM | 6,393.8 | - |
| 4 | Providing & laying cement concrete of prop. (1:2:4) in foundation bed and floors using 12mm nominal size down graded, screened, washed hard black crusher broken granite Chips of approved quality & from approved quarry including laying in the layers not exceeding 150 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. | - | CUM | 8,041.7 | - |
| 5 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills.Base | - | Cum | 1 | - |
| 6 | Wall | - | Cum | - | - |
| 7 | Slab | - | Cum | 1 | - |
| 8 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | - | Cum | 9,395.5 | - |
| 9 | Remove excavate materials from the site by mechanical means with loading and unloading the same within 5 kms lead as per direction of enginner in charge . | - | Cum | 278.77 | - |
| 10 | Display Board | - | Nos | 6,737.56 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_595004.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_595004.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .