Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.5 L+₹72,332.50 (12.5%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.6 L+₹79,449.89 (13.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹7.0 L+₹1.2 L (21.2%)Admitted-Finance WARD NO 2 NAGAR PANCHYAT JHUNSI PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | L4 | Admitted-Finance |
Tender Value
₹8.3 L
EMD Value
₹87,761
Closing Date
6 Mar 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
Zone-3 Room No. 59 Construction of CC road from Santoshi Mata Mandir to Abbas Nagar Road.
2026_DOLBU_1118433_1
12-02-2026/NAGAR NIGAM AGRA/06-03-2026/66
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹87,761
30 Apr 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m ]ead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. Mannual (Smallwork). (4-Chapter PWD.SCH.No. | 540 | CUM | 319.08 | ₹1,72,303.2 |
| 2 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 brick ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.SCH.-274) | 36 | CUM | 5,325 | ₹1,91,700 |
| 3 | Providing and laying in posotion machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement conceret work, using cement content as per approved design mix, including the cost of centering, shuttering, finishing, and but excluding reinforcement, including admixtures in recommended proportions as per IS:9103 to accelerate, retarder for setting of concrete/improve workability without imparing strength and durability as per direction of Engineer-in-charge. Note :- Cement content considered in this item as @ 330kg /cum. Excess or less cement used as per design mix is payable or recoverable separately. | 54 | CUM | 8,400 | ₹4,53,600 |
| 4 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) | 1 | Job | 10,000 | ₹10,000 |
| 5 | Sub Total (A) | 1 | Rs | 1 | ₹1 |
| 6 | Add/Deduction Rs. For Estimate Figure Amount Match | 1 | Rs | 0.2 | ₹0.2 |
| 7 | Grand Total | 1 | Rs | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.45 MB
BOQ_2081500.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .