Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 tenderer |
| 2 | L2₹1.4 Cr+₹42,911.45 (0.32%)Rejected-Finance | ₹1.4 Cr+₹42,911.45 (0.32%) | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
3 May 2023, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Strengthening of Arungundram to Kazhanipakkam road Km 0/0-2/450 in Arungundram village Panchayat in Thiruporur Panchayat Unions of Chengalpattu District Having PKG No.47
2023_RDTN_307197_1
Rc.No.1380.2023.A9 Dated 05.04.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Thiruporur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.4 L
O/o The Project Director DRDA Chengalpattu
22 Jun 2023
26 Apr 2023
3 May 2023
26 Apr 2023
3 May 2023
26 Apr 2023
27 Apr 2023
Amount
Earth work Excavation for Foundation of structures upto 3.00m depth as per drawing and technical specification clause 1104 including seting out construction of suring and bracing removal stumps and other deletarious methods dressing of sides and bottoms and back filling with approved material
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 50mm IRC size HBG metal including cast of material labour charges rentals for machinery fuel and all other incidental charges etc. complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying tack coat over BT surface using 3 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Provding and laying butuminous macadam with hot mix plant using crushed aggregates of grading as per table 500.4 premixed with bituminous binder transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finsher to the required grade, level and alignment and rolled to achieve the desired compaction including using shredded plastic wastes at 8% of the weight of bitumen used as per Technial Specification clause 504.
Providing and laying tack coat over BT surface using 2.5 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Providing and laying Bituminious concrete 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement. thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade). coarse an SCC
Supplying and fixing of HM stone of size 0.75x0.23x0.10 m including cost and conveyance and all other labour charges etc., complete
Supplying and fixing of KM stone of size 1.65x0.45x0.15 m including cost and conveyance and all other labour charges etc., complete
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
a. 60 cm Equilateral triangle cautionary signboard
a. 60 cm circle signboard
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803
Road Marker/ Road stud with lens Reflector Providing and fixing reflective road studs of 'Category A' raised pavement markers made out of poly carbonate/ methyl methercrylate/ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lense face with ratro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No.RW/NH 33023/10/97-DO.III dt 11.06.97. The height , width and length shall not be less than 15mm, 90mm and 100mm and with minimum reflective area of 13 Sq cm on each side and the slope to the base shall be 35+/-5 degree . Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/- 2mm and height not less than 30+/-2 mm) from the body is to be a minimum value of 500kgf. Fixing wil be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35-2015 guidelines and MORT&H specification 804 etc., Complete.
RCC Slab Culvert- 1.5 m Span at Ch 0/540, 1/058 and 1/800
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Up to Ground Level
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Above to Ground Level
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS. (For weep holes)
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
i. 1.50 m Span at Ch 0/540
ii. 1.50 m Span at Ch 1/058 and 1/800
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SIVAGNANAM
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .