| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | -6.99% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 L+₹13,558.60 (4.30%)Admitted-Finance | -2.99% | ₹3.3 L+₹13,558.60 (4.30%) | L2 | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹33,896
Closing Date
20 Jul 2026, 12:00 pmClosed
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
Loha Mandi Zone Construction of an RCC drain near the Shankar Garh culvert (Ward No. 40).
2026_DOLBU_1169350_1
10-07-2026/NAGAR NIGAM AGRA/18-07-2026/98
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
NAGAR NIGAM
₹33,896
5 Aug 2026
15 Jul 2026
20 Jul 2026
15 Jul 2026
20 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work cutting in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 cum. {Chapter No. 4, S.I. No. 253(a)} | 18 | Cum | 140 | ₹2,520 |
| 2 | Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance | 14.4 | Cum | 230.1 | ₹3,313.44 |
| 3 | Providing of bandha for diversion of nala etc. all complete. (NS) | 20 | Nos | 600 | ₹12,000 |
| 4 | Providing of 32HP diesel pump for dewatering of nala with pump, driver etc. all complete. (NS) | 10 | Day | 2,100 | ₹21,000 |
| 5 | Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling). | 20 | Rmt | 225 | ₹4,500 |
| 6 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) | 0.96 | Cum | 5,325 | ₹5,112 |
| 7 | R.c.c work with cement approved coarse sand and 4cm gauge approved stone ballast in the proportion 1:2:4 (One part of Cement, 2 part of Coarse sand and 4 part of 4cm. stone grit) in R.CC Raft Foundation and Footing 4cm. Gauge approved stone ballast excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150 grade. (5-Chapter S.I.No.287) | 1.2 | Cum | 7,750 | ₹9,300 |
| 8 | Renforced cement concrete work in walls (any thickness), including attachedplasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struls etc. including cost of centering, shuttering, and excluding Reinforceement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13.8 | Cum | 8,350 | ₹1,15,230 |
| 9 | R.C.C. work with cement approved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:2:4 for slab work excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials labor and tools and plants etc. required for proper completion of the work. Strength of the concrete shall not be less than M-150. (SI No. 284) | 2.7 | Cum | 8,700 | ₹23,490 |
| 10 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 11.12 | Qtl | 8,500 | ₹94,520 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_2194433.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .