Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC CHUIKHIM BUSTY PABRINGTAR G P KALIMPONG | KALIMPONG | KALIMPONG | WEST BENGAL | 734301 | ₹19.4 L | L1 | Accepted-AOC 1st Lowest Bidder |
| 2 | L2₹19.7 LRejected-AOC KALIMPONG DISTRICT | KALIMPONG | WEST BENGAL | 734301 | ₹19.7 L | L2 | Rejected-AOC 2nd Lowest Bidder |
| 3 | L3₹19.8 LRejected-AOC | ₹19.8 L | L3 | Rejected-AOC 3rd Lowest Bidder |
Tender Value
₹19.4 L
EMD Value
₹38,845
Closing Date
19 Feb 2026, 6:00 pmClosed
Executive Engineer Kalimpong Irrigation Division
Upper Cart Road Raniban Kalimpong
Landslide Protection Work of Rongdsung Busty from Kiran Rais House to Suraj Bishwakarmas House at Pabringtar G.P. in P.S. Kalimpong.
2026_GTA_1000105_1
e-NIT No 15(2nd Call)/EE/KID/GTA/2025-26
Open Tender
CIVIL WORKS
60 days
Rongdsung Busty Pabringtaar G.P.
Please refer tender documents
8 documents required · 8 mandatory
₹1,000
₹38,845
26 May 2026
6 Feb 2026
23 Feb 2026
6 Feb 2026
19 Feb 2026
6 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75 mts. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).
Filling properly empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150 mts. etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulder sand launching the crate in position if necessary and as directed by the Engineer-in charge.
Cement concrete with 30 mm. down graded shingles excluding shuttering. N.B. Variety. In ground floor. (a). 1:3:6 proportion.
Hire and labour charges for shuttering with or without staging upto 4.0 mts. height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 2.02 MB
Tendernotice_3.pdf
PDF • 0.04 MB
BOQ_2450003.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid