Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
12 Oct 2026, 3:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1185387_16
13/SE-1/2026-27
Open Tender
Civil Works
Piece-work
120 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.2 L
Office of SE 1st IWC Meerut
5 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in foundation in ordinary soil i/c lift upto 1.50 m and lead upto 30 m. labour, T&P etc. complete as per direction of Engineer in charge. | 246 | cum | - | - |
| 2 | Laying Cement concrete A20M10 in (1:3:6) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete as per ID specifications. | 48 | cum | - | - |
| 3 | Providing & fixing Centering & Shuttering for .C.C. Work including rent of Centering Material ,Labour and T&P Recquired for proper completion of work. as per direction of Engineer in charge. | 2,499.6 | sqm | - | - |
| 4 | Laying Cement concrete A20M20 in (1:1.5:3) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.as per ID specifications. | 2,014.24 | cum | - | - |
| 5 | Brick work(M-150) in 1:4 CM with cement and coarse sand of fineness modulous not less than 2, including all cost of material, labour ,T&P etc complete.as per ID specifications. | 2,496.17 | cum | - | - |
| 6 | Brickwork (M-150) using old bricks in 1:4 CM with cement and coarse sand of fineness modulous not less than 2, including all cost of material, labour ,T&P etc(excluding cost of bricks) complete.as per ID specifications. | 1,069.79 | cum | - | - |
| 7 | Pointing Struck deep in (1:2 CM) with cement and coarse sand of fineness modulous not less than 2, including all cost of material, labour ,T&P etc complete.as perper ID specifications. | 16,048.16 | sqm | - | - |
| 8 | Earhwork in back filling including lead upto 1.00 km and lift upto 1.50m also i/c levelling, ramming, dressing, labour ,T&P etc.complete as per direction of Engineer in charge. | 3,250.46 | cum | - | - |
| 9 | Laying & fixing of brick bats (filter material) with its preperation by breaking old and damaged brick pitching already existing at site including cost of labour, T&P etc. complete. as per direction of Engineer in charge. | 92.54 | cum | - | - |
| 10 | Supply & Fixing 80 mm dia P.V.C pipe for weep hole in brick pitching Pannel i/c all cost of Material T&P etc complete as per direction of engineer in charge . | 5,872 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.59 MB
BOQ_2250967.xls
BOQ • 0.29 MB
TDUpload.pdf
Tender Documents • 6.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .