| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC 538 RAJPOOT COLONY SHIVAJI NAGAR JHANSI | JHANSI | JHANSI | UTTAR PRADESH | ₹1.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.0 CrRejected-Finance | ₹1.0 Cr | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | - | - | Rejected-Technical The value of B has been incorrectly calculated in the uploaded Bid Capacity , so not Qualify with eligibility criteria |
| 4 | Rejected-Technical | - | - | Rejected-Technical The value of B has been incorrectly calculated in the uploaded Bid Capacity , so not Qualify with eligibility criteria |
| Sl No | Description | Qty | Unit | M/S RADHIKA RAMAN YADAV THEKEDAR L2 | M/S PUSHPENDRA ENGINEERING ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of old and damaged brick / stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. | 40 | Cum | 400 ₹16,000 | 290 ₹11,600 Lowest |
| 2.00 | Dismantling rainforcement cement concrete or reinforcement brick work, including stacking of materials as directed by Engineer-in-Charge with in a distance of 60 mt. (200 feet) | 19.81 | Cum | 800 ₹15,848 | 700 ₹13,867 Lowest |
| 3.00 | Earth work in Mar ranker and kankar mixed soil in digging foundation including lead up to 30.00m and lift upto 1.50 m with manual compaction and dressing . | 492.33 | Cum | 80 ₹39,386.4 Lowest | 98 ₹48,248.34 |
| 4.00 | Providng and Laying of Brick Rora /Brick Bats in Foundation i/c all labour, material and T&P etc. complete. | 86.5 | Cum | 1,900 ₹1,64,350 | 1,550 ₹1,34,075 Lowest |
| 5.00 | Laying & spreading of Local sand in foundation for proper completion of work as per direction of Engineer-in-Charge. | 196.41 | Cum | 2,000 ₹3,92,820 | 1,790 ₹3,51,573.9 Lowest |
| 6.00 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 80.4 | Cum | 4,910 ₹3,94,764 | 4,500 ₹3,61,800 Lowest |
| 7.00 | Providing & laying Reinforced Cement Concrete (M20) 1:1.5:3 (1 cement :1.5 coarse sand : 3 Aggregate) with cement coarse sand and stone grit 20mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 230 | Cum | 6,890 ₹15,84,700 | 6,500 ₹14,95,000 Lowest |
| 8.00 | Cenetering & shuttering for Reinforced Cement Concrete work including cost of shuttering, material, Labour, T&P etc required for proper completion of work as per ID specification & direction as per Engineer-in -charge. | 1,406.62 | SQM | 700 ₹9,84,634 | 677 ₹9,52,281.74 Lowest |
| 9.00 | Providing and Laying Steel reinforcement(Fe-500) including cutting, bending, binding & placing in position including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 16.04 | M.T. | 70,000 ₹11,22,800 Lowest | 72,000 ₹11,54,880 |
| 10.00 | Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 184.71 | Cum | 5,610 ₹10,36,223.1 Lowest | 6,000 ₹11,08,260 |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
25 Jul 2026, 11:00 amClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-1, Restoration of Jalaun Inspection House under Betwa Canal Division-I, Orai, District Jalaun
2026_UPIDC_1164587_10
02/SE-IV/2026-27
Open Tender
Civil Works - Buildings
Item Wise
330 days
Jalaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,320
₹2.3 L
31 Aug 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old and damaged brick / stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. | 40 | Cum | 469.2 | ₹18,768 |
| 2 | Dismantling rainforcement cement concrete or reinforcement brick work, including stacking of materials as directed by Engineer-in-Charge with in a distance of 60 mt. (200 feet) | 19.81 | Cum | 966 | ₹19,136.46 |
| 3 | Earth work in Mar ranker and kankar mixed soil in digging foundation including lead up to 30.00m and lift upto 1.50 m with manual compaction and dressing . | 492.33 | Cum | 108.2 | ₹53,270.11 |
| 4 | Providng and Laying of Brick Rora /Brick Bats in Foundation i/c all labour, material and T&P etc. complete. | 86.5 | Cum | 2,006.85 | ₹1,73,592.53 |
| 5 | Laying & spreading of Local sand in foundation for proper completion of work as per direction of Engineer-in-Charge. | 196.41 | Cum | 2,370 | ₹4,65,491.7 |
| 6 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 80.4 | Cum | 5,141.07 | ₹4,13,342.03 |
| 7 | Providing & laying Reinforced Cement Concrete (M20) 1:1.5:3 (1 cement :1.5 coarse sand : 3 Aggregate) with cement coarse sand and stone grit 20mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 230 | Cum | 7,005.18 | ₹16,11,191.4 |
| 8 | Cenetering & shuttering for Reinforced Cement Concrete work including cost of shuttering, material, Labour, T&P etc required for proper completion of work as per ID specification & direction as per Engineer-in -charge. | 1,406.62 | SQM | 939.6 | ₹13,21,660.15 |
| 9 | Providing and Laying Steel reinforcement(Fe-500) including cutting, bending, binding & placing in position including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 16.04 | M.T. | 74,616.35 | ₹11,96,846.25 |
| 10 | Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 184.71 | Cum | 6,095 | ₹11,25,807.45 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
BOQ_2196669.xls
BOQ • 0.53 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].