Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-Finance | ₹24.7 L | L1 | Accepted-Finance all doc ok |
| 2 | L2₹24.9 L+₹20,532 (0.83%)Accepted-Finance | ₹24.9 L+₹20,532 (0.83%) | L2 | Accepted-Finance all doc ok |
| Sl No | Description | Qty | Unit | MK ENGG.CO. L2 | Jal Dhara Engineers India L1 |
|---|---|---|---|---|---|
| 1.01 | Arrangement of safety equipment’s for the protection of staff to execute the work at deep channel and closing the sewage water incoming and outgoing gate for safely execution of work and also opening the same after completion of work. | 2 | Job | 34,600 ₹40,828 | 33,800 ₹39,884 Lowest |
| 1.02 | Cleaning of complete bar screen by removing of sewage grit, dust with the help of water pressure, kerosene oil, emery paper, wire brush and other scrubbing tools for making the complete cleaning for repairing purpose as per job requirement. | 2 | Job | 52,000 ₹61,360 | 50,000 ₹59,000 Lowest |
| 1.03 | Dismantling / Removal of repairable parts like comb assembly one by one (3 nos), chain, shaft, sprocket, chain guide, wiper plate, bracket and other parts from the bar screen after opening/cutting of all nut bolts, support with the help of SS cutting machine gas cutter, welding machine and re-fastening other fastener and removing of platform by required tools & tackles and handling equipment’s as per site requirement. | 2 | Job | 97,000 ₹1,14,460 | 96,400 ₹1,13,752 Lowest |
| 1.04 | Strengthening of bar and maintain the gap as per standard of manufacture by fixing of every bar in exact groove with proper level and making alignment of all bar in equal sequence for easily and smooth working of all teeth of comb entering in the bar without any disturbance by using of SS welding process, SS cutting machine and fixing of SS nut bolts after making the hole with threads by using of drill machine and thread tools. The job includes making of straight position of all bend shape bar by using of required tools & tackles as per site requirement. | 2 | Job | 4,74,800 ₹5,60,264 | 4,74,000 ₹5,59,320 Lowest |
| 1.05 | Repairing of SS comb rake of bar screen by making straight position of bend shape of comb rake and teeth at workshop by using of hydraulic power press machine and maintain the gap of teeth as per gap of bar for making the combination of comb teeth with bar for smooth working by using of required tools & tackles as per site requirement. | 5 | Job | 1,49,000 ₹1,75,820 | 1,47,500 ₹1,74,050 Lowest |
| 1.06 | Repairing of gear box of bar screen by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 1 | Job | 27,800 ₹32,804 | 27,600 ₹32,568 Lowest |
| 1.07 | Repairing of gear box of conveyor belt by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 1 | Job | 14,500 ₹17,110 | 14,200 ₹16,756 Lowest |
| 1.08 | Repairing of SS shaft of wiper assembly by making sheet on both side with the help of lath machine and making straight position the job i/c making alignment of wiper assembly with shaft for smooth working as per job requirement. | 1 | Job | 30,000 ₹35,400 | 28,700 ₹33,866 Lowest |
| 1.09 | LH & RH Bottom Side Chain Guide arrangement Johnson make. | 1 | Set | 1,72,900 ₹2,04,022 | 1,72,400 ₹2,03,432 Lowest |
| 1.10 | Scrapper Pad for clean comb Johnson make. | 2 | no | 71,600 ₹84,488 | 70,200 ₹82,836 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
1 Jul 2026, 3:00 pmClosed
PIYUSH GUPTA
ROHINI SECTOR 25 DELHI
Repairing of Johnson make 2 Nos. Bar Screens installed at SPS Sector 26 SPS.
2026_DJB_294349_4
NIT NO. 2 (2026-27)
Open Tender
Miscellaneous Works
Works
100 days
ROHINI SECTOR 25 DELHI
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Sabpaisa
₹50,000
Yes
4 Jul 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Arrangement of safety equipment’s for the protection of staff to execute the work at deep channel and closing the sewage water incoming and outgoing gate for safely execution of work and also opening the same after completion of work. | 2 | Job | - | - |
| 1.02 | Cleaning of complete bar screen by removing of sewage grit, dust with the help of water pressure, kerosene oil, emery paper, wire brush and other scrubbing tools for making the complete cleaning for repairing purpose as per job requirement. | 2 | Job | - | - |
| 1.03 | Dismantling / Removal of repairable parts like comb assembly one by one (3 nos), chain, shaft, sprocket, chain guide, wiper plate, bracket and other parts from the bar screen after opening/cutting of all nut bolts, support with the help of SS cutting machine gas cutter, welding machine and re-fastening other fastener and removing of platform by required tools & tackles and handling equipment’s as per site requirement. | 2 | Job | - | - |
| 1.04 | Strengthening of bar and maintain the gap as per standard of manufacture by fixing of every bar in exact groove with proper level and making alignment of all bar in equal sequence for easily and smooth working of all teeth of comb entering in the bar without any disturbance by using of SS welding process, SS cutting machine and fixing of SS nut bolts after making the hole with threads by using of drill machine and thread tools. The job includes making of straight position of all bend shape bar by using of required tools & tackles as per site requirement. | 2 | Job | - | - |
| 1.05 | Repairing of SS comb rake of bar screen by making straight position of bend shape of comb rake and teeth at workshop by using of hydraulic power press machine and maintain the gap of teeth as per gap of bar for making the combination of comb teeth with bar for smooth working by using of required tools & tackles as per site requirement. | 5 | Job | - | - |
| 1.06 | Repairing of gear box of bar screen by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 1 | Job | - | - |
| 1.07 | Repairing of gear box of conveyor belt by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 1 | Job | - | - |
| 1.08 | Repairing of SS shaft of wiper assembly by making sheet on both side with the help of lath machine and making straight position the job i/c making alignment of wiper assembly with shaft for smooth working as per job requirement. | 1 | Job | - | - |
| 1.09 | LH & RH Bottom Side Chain Guide arrangement Johnson make. | 1 | Set | - | - |
| 1.1 | Scrapper Pad for clean comb Johnson make. | 2 | no | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_391338.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .