| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹20.3 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | - | - | Rejected-Technical As per TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L1 |
|---|---|---|---|---|
| 1.00Repairing and rewinding of 110 KW , 550 volt, 3ph, 1470 RPM induction motor at Khottadih Colliery. (Inclusive of EPF/CMPF) | ||||
| 1.01 | Cost of copper superanamel wire (Part - A - Stator)(02 nos 110KW motor) | 240 | Kg | 500 ₹1.2 L |
| 1.02 | Cost of insulation require against copper (25% of copper cost) (Part - A - Stator)(02 nos 110KW motor) | 2 | No | 15,000 ₹30,000 |
| 1.03 | Labour cost for insulation(20% of copper cost)(Part - A - Stator)(02 nos 110KW motor) | 2 | No | 12,000 ₹24,000 |
| 1.04 | Cost of striping Motor damaged copper conductor (15% of copper cost)(Part - A - Stator)(02 nos 110KW motor) | 2 | No | 12,000 ₹24,000 |
| 1.05 | Cost of winding of motor (20% of copper cost)(Part - A - Stator)(02 nos 110KW motor) | 2 | No | 12,000 ₹24,000 |
| 1.06 | Miscellaneous cost (15% of copper cost)(Part - A - Stator)(02 nos 110KW motor) | 2 | No | 9,000 ₹18,000 |
| 1.07 | Supply and fitting of N321 no Bearing(Part - A - Stator)(02 nos 110KW motor) | 2 | No | 53,564 ₹1.1 L |
| 1.08 | Supply and fitting of 6321 no Bearing(Part - A - Stator)(02 nos 110KW motor) | 2 | No | 16,420 ₹32,840 |
| 1.09 | less scrap value(Part - A - Stator)(02 nos 110KW motor) | 236 | Kgs | 250 -₹59,000 |
Tender Value
₹20.3 L
EMD Value
₹25,500
Closing Date
16 Mar 2026, 6:30 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Repairing of Motor, VCB, Drill Panel, TSU under Khottadih Colliery, Pandaveswar Area
2026_ECL_355643_1
GM-PND/EandM/25-26/320/1735 dated 05/03/2026
Open Tender
Electrical and Maintenance Works
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹25,500
16 Apr 2026
5 Mar 2026
17 Mar 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
5 Mar 2026 - 9 Mar 2026
Repairing and rewinding of 110 KW , 550 volt, 3ph, 1470 RPM induction motor at Khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of copper superanamel wire (Part - A - Stator)(02 nos 110KW motor)
Cost of insulation require against copper (25% of copper cost) (Part - A - Stator)(02 nos 110KW motor)
Labour cost for insulation(20% of copper cost)(Part - A - Stator)(02 nos 110KW motor)
Cost of striping Motor damaged copper conductor (15% of copper cost)(Part - A - Stator)(02 nos 110KW motor)
Cost of winding of motor (20% of copper cost)(Part - A - Stator)(02 nos 110KW motor)
Miscellaneous cost (15% of copper cost)(Part - A - Stator)(02 nos 110KW motor)
Supply and fitting of N321 no Bearing(Part - A - Stator)(02 nos 110KW motor)
Supply and fitting of 6321 no Bearing(Part - A - Stator)(02 nos 110KW motor)
less scrap value(Part - A - Stator)(02 nos 110KW motor)
Removal of Rotor Bar From Slot (Part - B - Rotor)(02 nos 110KW motor)
Cost of Electrolyte copper bar (Part - B - Rotor)(02 nos 110KW motor)
Copper bar machning as per slot diamension (Part - B - Rotor)(02 nos 110KW motor)
Inserting new Copper bar into slot (Part - B - Rotor)(02 nos 110KW motor)
Repairing of bearing journal at rotor shaft (Part - B - Rotor)(02 nos 110KW motor)
Cost of repairing of rotor ring and its re-conection (Part - B - Rotor)(02 nos 110KW motor)
less scrap value(Part - B - Rotor)(02 nos 110KW motor)
OH & Profit @ 10%(02 nos 110KW motor)
Transpotation & Handling charge(02 nos 110KW motor)
Repairing & Rewinding of 400 kva ,3 ph, 6.6kv/550V Andrew Yule make Transwitch unit Sl.No- 006 at Khottadih Colliery. (Inclusive of EPF/CMPF)
Dismantaning of core & winding from transformer tank
Supply of new electrolyte grade 210/95 swg copper strips for primary coils
Cleaning of 360/290 no swg copper strips of secondry coils with removel of old insulation.
Re-insulation cost of primary & secondry coils with removal of old insulation.
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc.
Re-formation of primary and secondry coils (borral type).
Cost of E-poxy moulded 3.4/11 inch bushing insulator with current carrying contects for primary 6.6kv grade
Supply of wooden forma for formation of primary and secondary coils size- 40/11/9
Supply of ELMO LUFT 1A – FD class varnish
Supply of 234 SDS thinner
Re-assembly of new coil with inter connetion with copper blazzing , backing /heating properly to improve IR value upto requires level.
Repairing of tap changer switch.
Testing charge of Transformer
Painting of inner side of transformer by red oxide anti corrosive red oxide (paint & 2coat of metallice paints (Gray )
Less old unused copper stripes burnt primary coil
OH & Profit 10%
Transporting Cost Including Loading & Unloading
Compelete Repairing of 150 Amp 6.6KV Andrew Yule Make FLP VCB at Khottadih Colliery. (Inclusive of EPF/CMPF)
Supply of PVC sleeved copper busbar
Supply of ON-Off Rev isolator
Supply of vaccuum interrupter
Supply of Epoxy cast
Supply of HT HRC fuse
Supply of Motor protection relay
Supply of glass insulated copper35 sqmm
Supply of ameter 0-200A/0-100A
Supply of voltmeter 0-200A/0-100A
Supply of epoxy cast current transformer
Supply of Aux contractor unit
Supply of indicating lamp
Supply of earth leakage relay with CBCT
Supply of push button with contect block
Complete auxiliary wiring with 1.5 sqrmm
Hardware materilas (nuts washer bolts)
Cleaning & painting charges)
Labour Charge
Transporting Charge
OH & profit @ 10%
Repairing of primary side 6.6KV 1.1 KV/550V 300 Amp Mine Line Make TSU. (Inclusive of EPF/CMPF)
Vaccum Interrupter
Auxiliary switch 6 no/6NC
Bus bar supporting insulator for VCB
Auxiliary contractor
Limit switch 2NO/2NC
Pilot relay 200 ahm (12v/AC 8 pin)
Potentials transformer 6.62220-110VA 300 1PH
Numerical over current relay
Current transformer (400/5) 10VA
Ammeter(CTR -400/5A)
Voltmeter (PTR -6.6KV 110V)
Compelte servicing of VCB along of above supplied materials
Painting charges
OH & Profit @ 10%
PF @ 12.72 % on labour cost
Repairing of Secondary side 1.1 KV/550V 300 Amp Mine Line Make TSU. (Inclusive of EPF/CMPF)
Supply of fitting fail safe relay system
Supply of earth leakage 110v AC (50ma-750MA)
Core balance current transformer
Supply and fitting of PT
Supply and fitting of CT
Supply and fitting of voltmeter switch 10A, 550v AC
96 sqr mm ammeter
Indication lamp
Auxiliary contractor
Push Buttom for Earth leakage relay test
Push Buttom for Earth leakage relay reset switch
Volt meter 2.5 inch
wiring cable 1.5 sqr mm
Wiring Terminal
Wiring Channel
Complete servicing of VCB along with fitting and testing of above supplied materilas
Painting Charges
OH & Profit @ 10%
PF @ 12.72 % on labour cost
Repairing & Rewinding of 750KVA, 3.3kv/550V Andrew yule make transwitch sl. No. T1BB/423. (Inclusive of EPF/CMPF)
Dismantaning of core & winding from transformer tank
Supply of new electrolyte grade copper strips for primary coils
Cleaning of copper strips of secondry coils with removel of old insulation.
Re-insulation cost of primary & secondry coils with removal of old insulation.
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc.
Re-formation of primary and secondry coils (borral type).
Supply of F-class varnish
Supply of thinner
Re-assembly of new coil with inter connetion with copper blazzing , backing /heating properly to improve IR value upto requires level.
Repairing of tap changer switch.
Testing charges of transformer
Less old unused copper stripes burnt primary coil
OH & Profit @ 10%
Transportation & handling Charges.
Repairing of 2.5KVA, 550V/440V Volga make Drill panel. (Inclusive of EPF/CMPF)
Compelete repairing of transformer coil
Supply & fitting of Terminal insulator
Supply & fitting of Contractor Unit
Supply & fitting of Thermal Overload
Supply and fitting of earth leakage
Supply 7 fit of terminal overload
Supply & fixing of Fuse with carrier
Supply and fixing of Lamp holder
Supply and fixing of wiring wire
Supply and fixing of isolator
Repairing cost
OH & Profit
Repairing & Rewinding of 5.5KW, 415V, 3ph 2900 RPM KE make Motor Sl no. A3AOCG0155(Inclusive of EPF/CMPF)
Cost of super copper enamel wire( Size - 21 no SWG)
Cost of insulation require against copper (25% of copper cost)
Labour cost for insulation(15% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)
Cost of winding of motor (20% of copper cost)
Miscellaneous cost (15% of cost of copper)
less scrap value
OH & Profit @ 10%
Repairing & Rewinding of 110KW,550V,3ph 1475 RPM Kirloskar make Motor sl no. 29303013, M-01/51. (Inclusive of EPF/CMPF)
Cost of copper superanamel wire
Cost of insulation require against copper (25% of copper cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)
Cost of winding of motor (20% of copper cost)
Miscellaneous cost (15% of copper cost)
Supply of N321 no Bearing
Fitting of N321 no bearing
Supply of 6321 no Bearing
fitting of 6321 no bearing
less scrap value
OH & Profit @ 10%
Transpotation charge (Up & Down)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_368486.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.42 MB
BOQ_368486.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid