| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 LAccepted-AOC | ₹3.8 L | L-1 | Accepted-AOC found lowest |
| 2 | L-2₹4.1 L+₹30,984.94 (8.15%)Rejected-Finance | ₹4.1 L+₹30,984.94 (8.15%) | L-2 | Rejected-Finance Not found lowest |
| 3 | L-3₹4.1 L+₹32,706.33 (8.61%)Rejected-Finance | ₹4.1 L+₹32,706.33 (8.61%) | L-3 | Rejected-Finance Not found lowest |
Tender Value
₹4.3 L
EMD Value
₹8,607
Closing Date
20 Jul 2026, 3:00 pmClosed
Assistant Commandant engineer 50th Bn ITBP Ramgarh
Assistant Commandant engineer 50th Bn ITBP Ramgarh panchkula haryana
cnstruction of kaccha handball court at 50th Bn ITBP
2026_ITBP_916381_1
ITBP/Engr/50BN/Hand ball/BHQ/110/2026-27-556
Open Tender
Civil Works - Others
Percentage
45 days
50th Bn ITBP Ramgarh Panchkula haryana
please refer tender documents
10 documents required · 10 mandatory
₹0
₹8,607
Yes
6 Aug 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
8 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Civil work for Handball ground | - | - | - | - |
| 1 | Surface dressing of the ground including removing vegetation and in-equalities (Picking of stones) not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kind of Soil. | 1,125 | Sqm | 33.23 | ₹37,383.75 |
| 2 | Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift:All kind of soil | 168.75 | Cum | 384.63 | ₹64,906.31 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 1.84 | Cum | 253.27 | ₹466.02 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 0.91 | Cum | 190.71 | ₹173.55 |
| 5 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering . All work up to plinth level 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size | 0.02 | Cum | 6,628.08 | ₹132.56 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.91 | Cum | 8,801.51 | ₹8,009.37 |
| 7 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 162 | Kg | 189.15 | ₹30,642.3 |
| 8 | Octagonal MS Poles double arm made of S-355JO grade steel sheet , folded lengthwise to obtained Octagonal shape, having single longitudinal seam weld and hot dipped galvanised internally & externally in accordance with IS 2062:201 1 latest. Including all accessories. | 6 | Nos | 27,500 | ₹1,65,000 |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 106.08 | Kg | 130.09 | ₹13,799.95 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_963043.xls
BOQ • 0.32 MB
Tenderformhandball.pdf
Tender Documents • 1.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .