| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹1.4 Cr | L1 | Accepted-AOC ACCEPT |
| 2 | Rejected-Technical 1 9 KANGEYAMAPALAYAM P SULUR COIMBATORE DIST | COIMBATORE | TAMIL NADU | 638459 | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | M S ENGINEERS L1 |
|---|---|---|---|---|
| 1.00 | Earth work Excation for roaod works in all soil with initial lead and left etc., complete (Ordinary soil (SS20 A) Earth work including all charges etc., | 528 | M3 | 11 ₹5,808 Lowest |
| 2.00 | Conveying the excavated earth and for milling materials to the work site to designated dumping yard from the site to the distance of 0 to 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 252 | M3 | 7.83 ₹1,973.16 Lowest |
| 3.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 528 | M3 | 2,500 ₹13,20,000 Lowest |
| 4.00 | Providing and laying Prime coat over the WMM surface using 7.0 kgs of bitumen emulsion (Slow Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MORTH Specifications Rev.5 | 5,271 | M2 | 90 ₹4,74,390 Lowest |
| 5.00 | Providing and laying Tack coat over the WMM surface treated with emulsion using 2.50 kgs of bitumen emulsion (Rapid Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the femulsion as Tack Coat using bitumen sprayer etc., complete as urface, and applying the required quantity of bitumen per Clause 503 of MORTH Specifications Rev.5 | 5,271 | M2 | 20 ₹1,05,420 Lowest |
| 6.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded Imetal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 eum of 2.36 mm & below metal with 53.20 kgs of 60/70 conveyance of all materials to CMP site, heating the bitumen bitumen for premixing per 10 sqm including cost and and agregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, Ispreading the mix in required temperature for uniform * thickness of 50mm with mechanical paver to the specified 6 grades and s sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all her tools and plants required, including all other incidental charges etc., completeusing CMP clause 505 of MORTH Rev-5 specifications. | 264 | M3 | 11,250 ₹29,70,000 Lowest |
| 7.00 | Providing and laying Tack Coat of 2 Kgs/10 Sqm Over the Existing BT Surface Treated with binder using 2 Kgs of Bituminous for 10 Sqm area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc, complete as per 503 of MORTH Rev V Specifications | 20,421 | M2 | 30 ₹6,12,630 Lowest |
| 8.00 | Providing and laying Bituminous Concrete 30mm thick using 19-9.50 mm metal, 9.5-2.36 mm Metal, 2.36mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen (Procured from State Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MORTH Specifications to achieve the desired compaction | 718 | M3 | 11,262 ₹80,86,116 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
23 Jan 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
estoration of B.T.Sri Murugan Road To Sm Palayam162015R04070, J.M.V Garden 1 62015R03969, M.K.G Layout Cut Road 1162015R03995, M.K.G Layout Cut Road 2 162015R03996, Tirupati Nagar Tank Road 162015R04138, Tirupati Nagar Main Road E W 16
2026_MAWS_642162_17
E12/2026 (TURIP)
Open Tender
Civil Works
Works
90 days
Coimbatore
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.6 L
Chief Engineer Chamber, Coimbatore Corporation, Ma
17 Mar 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
14 Jan 2026
Earth work Excation for roaod works in all soil with initial lead and left etc., complete (Ordinary soil (SS20 A) Earth work including all charges etc.,
Conveying the excavated earth and for milling materials to the work site to designated dumping yard from the site to the distance of 0 to 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat over the WMM surface using 7.0 kgs of bitumen emulsion (Slow Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MORTH Specifications Rev.5
Providing and laying Tack coat over the WMM surface treated with emulsion using 2.50 kgs of bitumen emulsion (Rapid Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the femulsion as Tack Coat using bitumen sprayer etc., complete as urface, and applying the required quantity of bitumen per Clause 503 of MORTH Specifications Rev.5
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded Imetal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 eum of 2.36 mm & below metal with 53.20 kgs of 60/70 conveyance of all materials to CMP site, heating the bitumen bitumen for premixing per 10 sqm including cost and and agregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, Ispreading the mix in required temperature for uniform * thickness of 50mm with mechanical paver to the specified 6 grades and s sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all her tools and plants required, including all other incidental charges etc., completeusing CMP clause 505 of MORTH Rev-5 specifications.
Providing and laying Tack Coat of 2 Kgs/10 Sqm Over the Existing BT Surface Treated with binder using 2 Kgs of Bituminous for 10 Sqm area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc, complete as per 503 of MORTH Rev V Specifications
Providing and laying Bituminous Concrete 30mm thick using 19-9.50 mm metal, 9.5-2.36 mm Metal, 2.36mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen (Procured from State Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MORTH Specifications to achieve the desired compaction
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_769238.xls
BOQ • 0.26 MB
Docccc17.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .