| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹8.9 L (6.96%)Admitted-Finance | ₹1.4 Cr+₹8.9 L (6.96%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S PRABHAT TRADERS L1 | RAJESH TRADERS L2 |
|---|---|---|---|---|---|
| 1.00 | E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc. | 2,689.15 | M³ | - | - |
| 2.00 | Laying C.C, A-40, M-10 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc. | 40.29 | M³ | - | - |
| 3.00 | Laying R.C.C, A-20, M-25 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 512.72 | M³ | - | - |
| 4.00 | Laying C.C for wearing Coat A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 10mm including lead up to 60m lift up to 3m mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 15.29 | M³ | - | - |
| 5.00 | Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 731.35 | M² | - | - |
| 6.00 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc | 58.24 | MT | - | - |
| 7.00 | S/F Draiange spout pipe 100mm dia in R.C.C slab for proper completion of work including cost of all material, labour, T&P etc | 12 | No. | - | - |
| 8.00 | E/W in making Diversion in all type of soil including lead up to 30.00 lift up to 1.50m with manual compaction and dressing required for proper completion of work | 1,250 | M³ | - | - |
| 9.00 | 1st class Brick on edge soling on approch Road/Diversion with preparation of sub grade and filling joints with local earth, required for proper completion of work including cost of all material labour T&P etc | 450 | M² | - | - |
| 10.00 | Dewatering with all cost of power/POL machines,pump well,paint system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc. | 15,900 | kwh | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
18 Jan 2020, 1:00 pmClosed
S. E., Rapti Nahar Nirman Mandal-2 Basti U.P.
Superintending Engineer, Rapti Nahar Nirman Mandal-2 Basti U.P.
Construction of D.R.B. (Box Culvert) at Km. 10.710 Baikunthpur dy.
2020_UPIDC_423172_3
09/SE/2019-20
Open Tender
Civil Works
Item Wise
90 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Treasury Challan
₹2.7 L
S. E., Rapti Nahar Nirman Mandal-2 Basti U.P.
19 Feb 2020
13 Jan 2020
18 Jan 2020
13 Jan 2020
18 Jan 2020
13 Jan 2020
14 Jan 2020
Amount
E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc.
Laying C.C, A-40, M-10 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc.
Laying R.C.C, A-20, M-25 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Laying C.C for wearing Coat A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 10mm including lead up to 60m lift up to 3m mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper completion of work including cost of all material, labour, T&P etc
E/W in making Diversion in all type of soil including lead up to 30.00 lift up to 1.50m with manual compaction and dressing required for proper completion of work
1st class Brick on edge soling on approch Road/Diversion with preparation of sub grade and filling joints with local earth, required for proper completion of work including cost of all material labour T&P etc
Dewatering with all cost of power/POL machines,pump well,paint system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc.
P/L 75 mm dia PVC for weep holes inculding cost of all material t&p etc.
E/W making canal section U/S AND D/S
Dismantling of 1st class bicrk on edge solling on diversion inculding cost of all material t&p etc.
E/W in Removing diversion in all type of soil including lead up to 30m and lift up to 1.5 m with cost of all T&P,Labour etc.
Supply & Filling of local sand
Supply & pitching of Mirzapur stone bolder
S/F Join fillar bord
RAJESH TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BaikunthpurbidLot01-08.pdf
Tender Documents • 30.11 MB
BOQ_618807.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .