| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.6 L+₹1.9 L (5.07%)Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L2 | Rejected-Finance L2 | |
| 3 | L3₹38.4 L+₹75,580.94 (2.01%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance L3 |
Tender Value
₹37.7 L
EMD Value
₹47,200
Closing Date
7 Mar 2025, 5:00 pmClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
New Installation of Belt Conveyor structure and Drive head in 6D and 9WL of RIV seam at Khottadih Colliery.
2025_ECL_330275_1
GM-PND/EandM/24-25/244/1271 dated 24/02/2025
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹47,200
27 Mar 2025
25 Feb 2025
8 Mar 2025
25 Feb 2025
7 Mar 2025
25 Feb 2025
25 Feb 2025 - 28 Feb 2025
Amount
Installation of belt conveyor structure in 6 no. 4th belt of RIV seam of Khottadih Colliery. (Inclusive of EPF/CMPF)
Complete Installation after Transportation & with Necessary Fabrication of140 mtrs 1000 mm width, belt conveyor structure in 6 dip from 37L to 41L which includes 3) Transportation, Carrying from Surface & Fitting 1 nos. of load table one for Discharge & 2nd for Tail End& decking plate – 1.5 MT. 4) Transportation & Fitting including grouting of Tail end Assembly with V-Scraper & Decking fabrication & Fitting - 1 MT 5) Fitting Complete 140 mtr Structure with Top & Bottom Rollers after transported from surface to work site laying ,and, fitting @ -68Kg-per-mtr,
Fabrication of One no of hopper 04 mtrs long which including labour cost, oxygen, DA and welding
Fabrication of one no. of heavy duty tail-end assembly which including labour cost, oxygen, DA and welding
1000 mm PVC Belting transportation from surface, laying, jointing tensioning trail run etc.
4 times belt shifting (09 hole in each shift)
4 times belt extension including Tail End Assembly and hopper Shifting - 14 hds. x 1.5 shifts = 21 hds. for one extension
Fencing of Drive Head, Loop Take Up and Tail End (Tail end fencing 16 times)
Consumable Nut & Bolt 1/2” X 11/2” – 65 Kg, , Plain washer- 05 Kg,
Fabriation of complete drive head including gear and motor base frame
Installation of new 350mtr long 1000mm belt conveyor at 9WL in RIV seam for development in Khottadih Colliery. (Inclusive of EPF/CMPF)
Complete Installation after Transportation & with Necessary Fabrication of 350 mtr long 1000mm with belt conveyor 9WL in RIV seam which includes 1) Transportation, Carrying from Surface & Fitting of Discharge Head (800 X1150 mm) with Deck Plate, Chute, scrapper and 08 nos of Girders (125 X 250 mm) - 3.0 MT 2) Transportation, Carrying from Surface & Fitting of Drive head with Gear Box & Motor – 7.5 MT 3) Transportation, Carrying from Surface & Fitting 1 nos. of load table one for Discharge & 2nd for Tail End& decking plate – 3 MT. 4) Transportation & Fitting including grouting of Tail end Assembly with V-Scraper & Decking fabrication & Fitting - 1 MT 5) Transportation, Carrying from Surface & Fitting Loop take up assembly with heavy duty mechanical Winch. & Bend Pulley frame - 3.0 MT, 6) Fitting Complete 450 mtr Structure with Top & Bottom Rollers after transported from surface to work site laying ,and, fitting @ -110Kg-per-mtr, - 38.5MT
Fabrication of One no of hopper 04 mtrs long which including labour cost, oxygen, DA and welding
Fabrication of one no. of heavy duty tail-end assembly which including labour cost, oxygen, DA and welding
Fabrication of loop take up assembly with trolley which including labour cost, oxygen, DA and welding and making 4 nos. of pullies
1000 mm PVC Belting transportation from surface, laying, jointing tensioning trail run etc.
1)Holding down bolts of Drive Hd & Stucture , and Tail End. – 40 Nos 2) 8 times belt shifting(09 holes in each shifting)
Transportation of ACB, starter & PVC cable, Pull Cord, Signaling System etc surface to site.
8 times belt extension including Tail End Assembly and hopper Shifting - 14 hds. x 1.5 shifts = 21 hds. for one extension,
Fencing of Drive Head, Loop Take Up and Tail End (Tail end fencing 16 times)
Consumable Nut & Bolt 1/2” X 11/2” – 240 Kg, 5/8 “X 2“ -50 Kg, Plain washer- 20 Kg, 5/8" X 21/2"-10 Kg
Hanging by vartical support 30 mtr. length conveyor structure providing M.S. channel
Fabriation of complete drive head including gear and motor base frame
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE (BID ID -1133693)
BABLU SINHA (BID ID -1133699)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .