Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance KOTHAR MAJALI SADASHIVGAD KARWAR UTTARA KANNADA 581360 | KARWAR | UTTARA KANNADA | KARNATAKA | 581360 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 L
Closing Date
24 Feb 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(SB) Karwar
GE(SB) Karwar
MANNING OPERATION OF MAIN RECEIVING DISTRIBUTION SUBSTATION DSS 17 AT AMDALLI UNDER GE SB KARWAR
2022_MES_508804_1
3002/59/E3 DT 17 fEB 2022
Limited
Job Works
Works
30 days
GE(SB) Karwar
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
25 Feb 2022
17 Feb 2022
25 Feb 2022
17 Feb 2022
24 Feb 2022
17 Feb 2022
45 days
Amount
MANNING & OPERATION OF MAIN RECEIVING DISTRIBUTION SUBSTATION (DSS 17) AT AMDALLI UNDER GE(SB) KARWAR The above maintenance work as mentioned below is proposed to be carried out for “Manning & Operation of main receiving distribution substation (DSS 17) at Amdalli through job order for 30 days 1. Manning and Operation of Main Receiving Distribution Sub Station (33KV/11KV) (DSS-17), 11 KV/433 Volt HT supply installation at site Amdali town ship karwar for 03 (three) shifts of 8 hours each on all days including Sundays and holidays including minor daily maintenance/checks and also attending breakdown at DSS-17A & DSS-17B, all as specified and directed by Engineer-in-Charge. The installation comprises of following equipments :- (a) 33 KV, indoor type HT VCB - 1 No (b) Indoor type Power transformer 2 MVA, 33 KV/11KV - 1 Nos. (c) Main LT Panel board 415 V with ACBs & main switches MCCBs etc (d) Battery bank for auxillary supply. (e) 55 Nos of batteries to maintain 110 V battery bank with charging panel. NOTE: (a) Contractor has to employ minimum following staff for Manning and operation of the DSS -17 in all 3 shifts 8 hours each. (i) One skilled electrician/operator per shift (3 shifts per day) having minimum ITI qualificaiton in Electrician trade from Govt recognised institute with adequate knowledge for HT & LT electrical installation. The operator must be competent to carry out the routine preventive maintenance of Main distribution substation all as directed. (ii) One No Semi- Skilled/ Unskilled Supervisory minimum 10th class pass per shift (03 shifts per day). (b) Cost of spares if any to be replaced will be measured & paid separately. However cost of labour is deemed to be included in the unit rate quoted in this item. (c) Each shift duration shall be 8 hours and duty timings will be decided by Engineer-in-Charge. (d) The unit rate quoted shall be deemed to include for maintenance for earth pits, cutting & removing of vegetation and upkeep of the surrounding area, all around the bldg upto 6m from the plinth protection all as directed by Engr-in-Charge. In case of failure, a penalty of Rs 2000/- will be levied and recovered from dues. (e) The Contractor shall employ same tradesman continuously for 1 month during the Contract period.
(f) The contractor shall pay the wages to the operators/helpers (as applicable) through e payment i.e Aadhar linked bank accounts (Credit to their bank account). Engr-in-Charge shall ensure that e-payment made to operator/helper and their wages shall not be less than minimum wages fixed by state Govt or central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-Charge and the same shall be kept in record duly verified. (g) It is responsibility of contractor to deposit the employees provident fund (EPF) to the connected authority as per the prevailing scales as laid down by the Ministry of labour for all operator/helper (as applicable) and necessary proof to this regard shall be submitted to GE for verification and records. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding. (h) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to GE and as well as officers detailed by labour department. (j) The contractor shall provide 01 uniform to each operator & helper and design of uniform shall be approved by Engineer-in-charge. In case contractor fails to provide the uniform, recovery @ of Rs 1200/- per uniform will be recovered. (k) The rate quoted shall be deemed to be inclusive of safety gear & required tools for minor maintenance. In case of failure to provide tools kit & safety kit (Gum boots-02 pairs, 33 KV HT hand gloves), a penalty of Rs 3000/- will be recovered and levied. (l) The unit rate quoted shall be deemed to be include for daily routine maintenance as detailed below for trouble free functioning of plants:- (i) Checking/rectifying of loose connections (ii) Maintain the general cleanliness of the installation (iii) In case of any abnormal noise/compliant in the 33 VCB should be put off and same should be brought to the notice of Engineer-in-Charge. (iv) Check levels of electrolyte in battery maintain record of specific gravity and top up if required. (v) Check battery terminal and if found loose, tight regularly. (vi) The operator employed by the contractor shall be capable of carrying out minor maintenance & well experienced in electrical field (m) The Contractor shall maintain proper records of all kinds of daily, weekly, monthly or whatsoever maint is carried out during contract period in a binded book / register and shall obtain the signature of Engineer-in-Charge. (n) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate of Sch ‘A’ quoted rates.
Terms & conditions 1. Rates quoted will deemed to have included all taxes like GST as applicable and no separate cost wise be paid on account of same. 2. Unserviceable dismantled materials will be the property of the department. 3. You will liable for completion of job works within 30 days of placing Job Order. 4. 100% payment will be made on completion of job work against your bill. 5. Job Order can be closed in short notice (i.e 24 hours in advance) on Acceptance of Tender and the payment will be made till the date of acceptance of tender.
OM SAI ELECTRICALS AND HARDWARES
PEGASOS ENGINEER TRADERS
POPULAR ENTERPRISES
JAI SHREE GOPAL ELECTRICALS
stage.html
html • 0.02 MB
finance_568585.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .