Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 CrAccepted-AOC | ₹3.9 Cr | 1 | Accepted-AOC AGREEMENT DONE AS PER LETTER ATTACHED |
| 2 | 2₹5.5 Cr+₹1.6 Cr (41.2%)Rejected-Finance | ₹5.5 Cr+₹1.6 Cr (41.2%) | 2 | Rejected-Finance BEING L2 |
| 3 | 3₹5.6 Cr+₹1.7 Cr (45.1%)Rejected-Finance | ₹5.6 Cr+₹1.7 Cr (45.1%) | 3 | Rejected-Finance BEING L3 |
Tender Value
₹4.6 Cr
EMD Value
₹4.6 L
Closing Date
19 Jul 2022, 5:30 pmClosed
Executive Engineer, Water Resources Division,Datia
Executive Engineer, Water Resources Division,Datia
On Turnkey Basis Construction of Unao Causeway cum stopdam, as per detailed scope of work but not limited to that.
2022_WRD_200947_1
900/2022-23/etendering/ Unao
Open Tender
Civil Works - Others
Turn-key
365 days
Datia
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
Yes
₹4.6 L
Yes
9 Dec 2022
18 May 2022
21 Jul 2022
18 May 2022
19 Jul 2022
19 May 2022
Amount
On Turn key basis Construction of Unao Stop Dam Cum causeway as per detailed scope of work but not limited to that.
On Turn key basis Construction of Unao Stop Dam Cum causeway as per detailed scope of work but not limited to that.
RNC CONSTRUCTION COMPANY
ANMOL CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .