Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.5 CrAccepted-AOC 50 36 KAVARAI STREET SAIDAPET CHENNAI 15 | 15 | L1 | Accepted-AOC Lowest Value Quoted by M/s.Babuji Civil Construction has been awarded the contract | |
| 2 | L2₹58.2 Cr+₹1.7 Cr (3.01%)Rejected-Finance | L2 | Rejected-Finance Comparatively Higher price | |
| 3 | L3₹59.4 Cr+₹2.8 Cr (5.01%)Rejected-Finance | L3 | Rejected-Finance Comparatively Higher price |
Tender Value
₹56.5 Cr
EMD Value
₹28.4 L
Closing Date
2 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(NH)Chennai
O/o of the Superintending Engineer (NH) Arumbakkam, Chennai-106
Strengthening from Km 30/4 - 36/6, 38/7 - 47/0 of Marmalong Bridge-Irumbuliyur-Vandalur-Mudichur-Oragadam-Walajabad Road SH-48 excluding junction improvement at km 32/2
2026_MoRTH_894031_1
TN.NO.21/Date14.01.2026/IInd Call
Open Tender
Civil Works - Roads
Percentage
360 days
Vandalur
As per Tender Documents
5 documents required · 5 mandatory
₹17,700
Yes
GM MoRTH
₹28.4 L
SE(NH)Chennai
23 Mar 2026
15 Jan 2026
3 Feb 2026
15 Jan 2026
2 Feb 2026
15 Jan 2026
15 Jan 2026 - 21 Jan 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | clearing the light jungle inculding all other incidental charges etc complete as per morth Standards and Specification (W 0002) | 18,000 | Square Metre | 6.89 | ₹1,24,020 |
| 2 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) | 1,706.67 | Cubic Metre | 8,926.23 | ₹1,52,34,128.95 |
| 3 | Providing and Laying Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 3,93,896 | Square Metre | 28.66 | ₹1,12,89,059.36 |
| 4 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG40Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / PneumaticRoller to the required density etc., including labour for attending to paver at site etc., including hire andfuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 19,694.8 | Cubic Metre | 11,371.1 | ₹22,39,51,540.28 |
| 5 | Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 3,855 | Square Metre | 22.33 | ₹86,082.15 |
| 6 | Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks topaver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller to therequired density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (more than 5m width), Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 15,755.84 | Cubic Metre | 12,252.08 | ₹19,30,41,812.15 |
| 7 | Providing and laying Bituminous Concrete to 50mm thick using 0.22 cum of 26.5-13.20mm, 0.24 cum of 13.20-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials toCMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tippertrucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller to therequired density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (more than 5m width), Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. | 192.75 | Cubic Metre | 11,596.26 | ₹22,35,179.12 |
| 8 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance | 3,360 | Cubic Metre | 194.8 | ₹6,54,528 |
| 8.01 | Road Furniture | - | - | - | - |
| 9 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads at 250 gms, per sq.m area thickness of 2.50mm is exclusive of surface applied glass beads as per IRC: 35 2015. The finished surface to be level, uniform and free from streaks and holes etc., complete (as per MORTH specification No. 803) | 12,561.9 | Square Metre | 890 | ₹1,11,80,091 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
MIVMOW.rar
Tender Documents • 7.60 MB
BOQ_939718.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .