Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | -11.00% | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.6 L+₹17,910.73 (12.3%)Admitted-Fee/PreQual/Technical/Finance | -0.05% | ₹1.6 L+₹17,910.73 (12.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.6 L+₹17,990.88 (12.4%)Admitted-Fee/PreQual/Technical/Finance | -0.00% | ₹1.6 L+₹17,990.88 (12.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹4,905
Closing Date
13 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O PUBLIC PARK AT WARD NO. 3 BLOCK BRENG
2026_RDPR_319884_50
ENIT87of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,905
18 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site Clearance by way of engagement of labours cutting trees, bushes, removing rocks, removing vegetation, etc | - | Labs | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations drains , pipes , cablesetc. (not exceeding 1.5 m in width ) and for shafts ,wells , cesspits and the like not exceeding 10 sqm on plan depth up to 1.5 m including disposal ofexcavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed in all kinds of soil. | - | Cum | - | - |
| 0.0 | Providing and laying stone soling hand packed in foundation with plum complete with all costs and carriage 15kms | - | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | - | Cum | - | - |
| 0.0 | Centering & shuttering including strutting & propping etc in foundations footings, bases of columns etc incl. removal of forms complete job. | - | sqm | - | - |
| 0.0 | Structural steel work in single section fixed without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. In tees, R.S. joists, angles, flats and channels | - | kg | 1 | - |
| 0.0 | Providing and fixing G. I. chain link fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per direction of Engineer-in-charge. Made of G. I. wire of dia 4mm . | - | sqm | 1 | - |
| 0.0 | Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel work (two or more coats) . | - | sqm | 1 | - |
| 0.0 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 30 kms | - | Cum | - | - |
| 0.0 | Add provison for carriage of cement /structural steel and unforseen items etc .(To be paid as per actual) | 1 | ls | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1061586.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .