Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 LRejected-AOC AGARAM SITHAMUR | MADURAI | TAMIL NADU | 625001 | ₹11.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JAISHANTHI AND CO L1 | KALAIMANI L2 |
|---|---|---|---|---|---|
| 1.00Construction of Culvert at Colony Mariyamman koil street in Kundalapuliyur Panchayat | |||||
| 1.01 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. | 83.33 | m3 | 260 ₹21,665.80 | 300 ₹24,999 |
| 1.02 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 14.71 | m3 | 5,901.75 ₹86,814.74 | 6,000 ₹88,260 |
| 1.03Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | |||||
| 1.04 | Below GL | 121.36 | m3 | 547.39 ₹66,431.25 | 600 ₹72,816 |
| 1.05 | Anvove Gl | 52.64 | Nos | 1,094.78 ₹57,629.22 | 1,094.78 ₹57,629.22 |
| 1.06 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance ofall materials to site and all labour charges | 73.1 | Nos | 6,179.12 ₹4.5 L | 6,179.12 ₹4.5 L |
| 1.07 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance ofall materials to site and all labour charges | 3.46 | Nos | 7,214.93 ₹24,963.66 | 7,214.93 ₹24,963.66 |
| 1.08 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 1.3 | m3 | 91,995.1 ₹1.2 L | 91,995.1 ₹1.2 L |
| 1.09 | Reinforced cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc | 10.66 | m3 | 9,555.46 ₹1.0 L | 9,555.46 ₹1.0 L |
Tender Value
₹11.1 L
EMD Value
₹11,100
Closing Date
11 Nov 2025, 3:00 pmClosed
BDO (BP)
PANCHAYAT UNION, VIKRAVANDI
VIK/CGF-2025-26/KUNDALA
2025_RDTN_620910_1
VIK/CGF-2025-26/KUNDALA
Open Tender
Civil Works
VIKRAVANDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,100
Yes
17 Dec 2025
7 Nov 2025
11 Nov 2025
7 Nov 2025
11 Nov 2025
7 Nov 2025
Amount
Construction of Culvert at Colony Mariyamman koil street in Kundalapuliyur Panchayat
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below GL
Anvove Gl
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance ofall materials to site and all labour charges
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance ofall materials to site and all labour charges
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Reinforced cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Name Board
Photos
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KALAIMANI (BID ID -1507050)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_742468.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_742468.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid