| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC VALLUVAR NAGAR BAMBOOFLAT SOUTH ANDAMAN PIN 744107 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744107 | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹3.0 L+₹1,999 (0.67%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest |
Tender Value
₹3.1 L
Closing Date
20 Jan 2022, 11:00 amClosed
Deputy Conservator of Forests
Silviculture Division, Silva Complex, Horticulture Road, Haddo.
Construction of Overhead Tank RCC Structure for Silviculture camp, Marine Hill
2022_DCFSL_4883_1
Silva/G-340/546
Open Tender
Construction Works
Works
60 days
Silviculture Camp, Marine Hill
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
28 Apr 2022
7 Jan 2022
21 Jan 2022
7 Jan 2022
20 Jan 2022
7 Jan 2022
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m. (All kinds of soil)
Filling excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering – all work upto plinth level:1:4:8 (1 cement; 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) footing bed, plinth beam (Horizontal direction) and plinth beam (Vertical direction)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo mechanically treated bars for footing (footing jali with 10 mm dia bars @ 100 mm c/c) , column (main bars 16mm dia bars @ 50mm c/c 6 Nos, main bars 12 mm dia bars @ 50 mm c/c 2 nos & stirrups 08mm dia bars @ 100 mm c/c), Plinth beam (16mm dia bars @ 50mm c/c 4 Nos, 12 mm dia bars @ 50 mm c/c 2 nos & lateral ties 08mm dia bars @ 150 mm c/c) Beam (16mm dia bars @ 50mm c/c 4 Nos, 12 mm dia bars @ 50 mm c/c 2 nos & lateral ties 08mm dia bars @ 100 mm c/c) and slab(10mm dia bars @ 100mm c/c)
Centring and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns,etc for mass concrete (footing, pedestal & short column).
Centring and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers (plinth beam, beam & slab)
Centring and shuttering including strutting, propping etc. and removal of form for columns, pillars, piers, abutments, posts and struts (columns)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement. All work upto plinth level 1: 1 1/2 : 3 (1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) for foundation, pedestal & short column
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) for plinth beam
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string course, fillets, columns, pillars, piers, abutments, post and struts etc upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1: 1 1/2 : 3 (1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) for column
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) for beam & slab
Cement concrete flooring 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement , including cement slurry, but excluding the cost of nosing of steps etc complete 40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster of mix 1:4(1 cement : 4 fine sand) for column, beam & slab
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade: two or more coats on new work for columns, beam & slab
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface (water thinnable cement primer)
SPR CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .