Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹79,082.50AWARDED | AWARDED |
Tender Value
₹1.1 L
EMD Value
₹2,875
Closing Date
29 Oct 2025, 10:00 pmClosed
Directorate of Municipal Administration
WNo 04 providing electrical cable in lamani colony (2020-21 15th FC Untied Grant)
DMA/2025-26/OW/WORK_INDENT50601
DMA/2025-26/OW/WORK_INDENT50601
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Mahaligpura
₹500
₹2,875
16 Oct 2025
16 Oct 2025
28 Oct 2025
WNo 04 providing electrical cable in lamani colony (2020-21 15th FC Untied Grant)
8M PSCC Poles in Hard Soil (Material Cost )
8M PSCC Poles in Hard Soil (Labour Cost )
R & R of 8M PSCC Poles in Hard Soil (Labour Cost )
1.1 kV, 3 Phase Aerial Bunched Cable of size 3x95+1x16+1x70 Sqmm ( Material Cost )
1.1 kV, 3 Phase Aerial Bunched Cable of size 3x95+1x16+1x70 Sqmm (Labour Cost )
Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections ( Material Cost )
Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections (Labour Cost )
Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections ( Material Cost )
Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections (Labour Cost )
Suspension Clamp Assembly 16 to 70 mm (Excluding pole clamp & Eye Hook) ( Material Cost )
Suspension Clamp Assembly 16 to 70 mm (Excluding pole clamp & Eye Hook) (Labour Cost )
Pole clamp for HT/LT AB cable ( Material Cost )
Pole clamp for HT/LT AB cable(Labour Cost )
Eye Hook (Flat type) for fixing Clamps ( Material Cost )
Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sqmm (excluding pole clamps and Eye hook ( Material Cost )
Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sqmm (excluding pole clamps and Eye hook (Labour Cost )
Universal Hook, Bolts & nuts ( Material Cost )
Universal Hook, Bolts & nuts (Labour Cost )
Guy Set Complete in Hard Soil ( Material Cost )
Guy Set Complete in Hard Soil (Labour Cost )
Concreting of Guy Set without Cement (Labour Cost )
Loading and unloading of 8M RCC/PSC Poles (Labour Cost )
Transportation of Poles by head load Above 185mtr(Labour Cost )
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .