Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.5 L+₹13,059.07 (2.44%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.7 L+₹32,520.27 (6.07%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.2 L+₹89,183.89 (16.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹7.0 L+₹1.7 L (30.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹18,780
Closing Date
21 Sept 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Boundary wall at Higher Secondary School Lalan , Anantnag
2026_PWDJK_324619_1
NIT 85 of RnB/Ang/2026-27/7065-74 Dt 14/09/26
Open Tender
Civil Works
Percentage
90 days
Anantnag
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Centralized Designated Pooling Ac 0470010200000099
₹18,780
30 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job. | 9.34 | cum | - | - |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) incl carriage | 3.87 | cum | - | - |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth levelm Thermo-Mechanically Treated bars FE-500 D or more | 348.62 | kg | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations | 70.6 | sqm | - | - |
| 5 | Brick work with FPS bricks of class designation 75 in 1:6 ( cement:sand) mortar | 38.14 | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade in M-15 grade , 50 mm thick ( coping) | 35.02 | sqm | - | - |
| 7 | 12 mm cement plaster of mix 1:4 ( 1 cement :4 coarse sand ) | 483.08 | sqm | - | - |
| 8 | Providing and applying wall putty white cement based avg. 2mm thick of approved brand and manufacuture 2 or more coats | 484.08 | sqm | - | - |
| 9 | Distempring with oil bound washable distemper of approved brand and manufacture to give an even shade new work ( 2 or more coats ) over and incld priming coat with cemnt primer on plaster | 483.08 | sqm | - | - |
| 10 | Keep provision for dismantelling of damaged wall and stacking of servicable and disposal of unservicable material by engaging labours | 30 | no | - | - |
stage.html
html • 0.03 MB
finance_1095257.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1095257.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .