| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.5 L+₹28,648.20 (6.72%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | GOLD CONSTRUCTION L2 | MKGR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of Brick items, RCC, Pressed Tiles, Weathering Course, Doors and Windows including cost and conveyance of Dismantling Labour charges etc., complete
Brick / Stone Masonry in cement mortar walls under 3m high | 246.5 | cum | 300 ₹73,950 | 244 ₹60,146 Lowest |
| 1.01 | Dismantling RCC using deploying machineries | 71.5 | cum | 3,700 ₹2,64,550 | 3,652 ₹2,61,118 Lowest |
| 1.02 | Pressed Tiles & Weathering Course | 175.16 | sqm | 40 ₹7,006.4 | 39 ₹6,831.24 Lowest |
| 1.03 | Doors and Windows including removal of frames, hinges and fastenings | 95.68 | sqm | 140 ₹13,395.2 | 132 ₹12,629.76 Lowest |
| 2.00 | Providing and fixing in position Barbed Wire Fencing Post. Manufactured with M-25 grade of concrete using vibro-compaction process using jointless, FRP moulds so as to achieve shuttering finish . Suitably reinforced for long use and to prevent damage during transportation & handling. Finish to be done as per Architect's approval.The cost of item is including moulding charges, transporation, loading/unloading charges and labour complete. | 1.09 | cum | 26,500 ₹28,885 | 26,260 ₹28,623.4 Lowest |
| 3.00 | Providing Barbed wire fencying using 10gauge , two play and four pronged (galvanised) barbed wire including cost of binding wire to site and labour charges etc,complete as per standard specifications (S.I.306) | 90 | Sqm | 100 ₹9,000 | 99 ₹8,910 Lowest |
| 4.00 | Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance | 318 | cum | 120 ₹38,160 | 100 ₹31,800 Lowest |
| 5.00 | Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc., complete. | 8 | hrs | 1,000 ₹8,000 | 780 ₹6,240 Lowest |
| 6.00 | Hire charges for deploying earth moving machinery Tipper Lorry 10 Tonne for earthwork including diesel, oil and labour charges etc., complete. (Removing of Excess Earth at school ground including drain ) | 2 | day | 6,000 ₹12,000 | 5,000 ₹10,000 Lowest |
Tender Value
₹5.3 L
EMD Value
₹5,300
Closing Date
2 Jun 2023, 3:00 pmClosed
Municipal Commissioner, Tiruvannamalai
Municipal Office, Tiruvannamalai
Dismantling of Old Municipal School Building at Samuthiram Colony, Old GH Opp.
2023_MAWS_320700_1
1534/2023/E1
Open Tender
Miscellaneous Works
Works
30 days
Thiruvannamalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,300
10 Oct 2026
29 May 2023
2 Jun 2023
29 May 2023
2 Jun 2023
29 May 2023
Amount
Dismantling of Brick items, RCC, Pressed Tiles, Weathering Course, Doors and Windows including cost and conveyance of Dismantling Labour charges etc., complete Brick / Stone Masonry in cement mortar walls under 3m high
Dismantling RCC using deploying machineries
Pressed Tiles & Weathering Course
Doors and Windows including removal of frames, hinges and fastenings
Providing and fixing in position Barbed Wire Fencing Post. Manufactured with M-25 grade of concrete using vibro-compaction process using jointless, FRP moulds so as to achieve shuttering finish . Suitably reinforced for long use and to prevent damage during transportation & handling. Finish to be done as per Architect's approval.The cost of item is including moulding charges, transporation, loading/unloading charges and labour complete.
Providing Barbed wire fencying using 10gauge , two play and four pronged (galvanised) barbed wire including cost of binding wire to site and labour charges etc,complete as per standard specifications (S.I.306)
Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance
Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc., complete.
Hire charges for deploying earth moving machinery Tipper Lorry 10 Tonne for earthwork including diesel, oil and labour charges etc., complete. (Removing of Excess Earth at school ground including drain )
GOLD CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_380672.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .